Deficiency Rept Suppl,Originally Reported on 801010,re Spool Weld Buildup Insufficient Exam.Bechtel Power Corp Currently Determining Corrective Actions.Reportability Determination Will Be Completed by 801212
ML19343A661
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 11/12/1980
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8011190512
Download: ML19343A661 (2)


Text

1 1

~ .

=

\

l Thomas J. Martin Puolic Service Electric and Gas Comcany 80 Park Plaza Newark, N.J. 07101 201/430-8316 v c. Pres.cem Engmeering anc Construction November 12, 19,80 p a a

)  ::

2 I._l' Mr. Boyce H. Grier, Tirector E :_:

U. S. Nuclear Regula;ory Commission 60:;

Office of Inspection and Enforcement Eph {'. -l , ,

Region 1 5 Er 631 Park Avenue d " d King of Prussia, PA 19406 C j 5

Dear Mr. Grier:

SPOOL WELD BUILDUP INSUFFICIENT EXAMINATION 10CFR50.55(e), POTENTIAL SIGNIFICANT DEFICIENCY NC. 1 AND 2 UNITS HOPE. CREEK GENERATING STATION On October 10, 1980, a verbal report was made to Region 1, Office of Inspection and Enforcement representative, .

Mr. J. Mattia, advising of a potential significant item.

Weld buildups on pipe spools were determined to be not sufficiently examined. Corrective measures committed to reexamine six pipes by conventional methods cannot be done due to inaccessibility. Two are embedded in concrete (JE-12 inch diesel fuel tank vent lines) and four buried Anti backfilled outside Unit No. 1 (EA-36 inch service w".ter lines).

The following supplemental information is submitted in accordance with the requirements of 10CFR50.55(e).

Bechtel Power Corporation, PSE&G's Architect Engineer, is currently reviewing this concern to determine a course of action which will be followed to show the acceptability of these six buildups,

$dlk 6'O \

8 01199 0$$ g .g

Boyce II. Grier 11/12/80 Determination of reportability per requirements of 10CFR 50.55(e) is being assessed and is scheduled for completion December 12, 1980, at which time a report will be made to the NRC.

Very truly yours, OEIG. SIctrED 3y

'I. J. MARTIIi CC vbffice of Inspection & Enfor-,ement Div. of Reactor Constructic6 Inspection Washington, DC

-.