Status Rept 1 Re Procedural Violation in Cutting Rebar.Stop Work Order Issued on 800530 to Stop Hole Drilling Operations for Electrical Support.Craft & Field Engineering Personnel Trained.Final Rept Will Be Submitted by 800117
ML19329F978
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/02/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-80-146, NUDOCS 8007110430
Download: ML19329F978 (2)


Text

_ _ _ _ __ . _ _ _ _

a .'

)

MISSISSIPPI POWER & LIGHT COMPANY

= \

Helping Build Mississippi P. O . B O X 16 4 0. J A C K S O N , MISSISSIPPI 3 9205 suctsAn encouction oEPARTMENT July 2, 1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Orand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526

' PRD-80/30, Stacus Report ill ,

Procedural Violation in Cutting Rebar AECM-80/146

- On June 2, 1980, Mississippi Power & Light Company notified Mr.

M. Hunt of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station construction site. The deficiency concerns the cutting of rebar in violation of procedures. This de-ficiency was noted during Mr. Hunt's site inspection 416-F0/12 of May 27-30, 1980.

Our constructor issued a Stop Work Order on May 30, 1980 to stop hole drilling operations for electrical support. The Stop Work Order was lifted on May 31, 1980 after both Craf: and Field Engineering per-sonnel had been indor.tcfr.2:ed and trained to the requirements of the work procedure. Our investigation into the extent and scope of the deficiency has not been completed. The completion of this investiga-tion and engineering evaluation of safety implications is scheduled for October, 1980.

We expect to submit a determir.ction of reportability and final report on this deficiency by November 17, 1980.

Yours truly, g J. P. McCaughy, Jr.

Assistant Vice President, Nuclear Production [f 5/6 800 7110 WO q uemeer sideie South utiiities System

.g MI:31 SIPPI POWER & LIGHT COMPANY :

r.

Mr..s. P. O'Reilly AECM-80/146 NRC ,

Page 2 ATR:mt cc: .Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission -

Washington, D.C. 20555 p

-l l

t-I I

1

-~

m, w si;s. , u_ _

,w

_ g, , y,;j , ,

, ,i*J,s ,, , ,;, . - ,g.,~,- , ,, y,, -

    • v3,Q \

. , , - . ., .. . . - - - . - . . _ - = . . - - , - . . . - . ,,,