Status Deficiency Rept 6 Re Failure to Establish QA Program. GE Has Not Completed Review of Insp Results & Evaluation of Safety Implications.Final Rept to Be Provided by 800908
ML19321A060
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/14/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-80-155, NUDOCS 8007220388
Download: ML19321A060 (2)


Text

__ .

f MISSISSIPPI POWER & LIGHT COMPANY .'

1

] , Helping Build Alississippi P. O. 8 O X 1640, J AC K S O N. mis SIS SIP Pl 3 9 2 0 5 Edld M aida5 NuaEAR PAXUCTION oEPARTMENT July 14, 1980 ,

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 -

Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 PRD-79/03, Status Report #6, Failure to Establish QA Program AECM-80/155

References:

1. AECM-79/20, 3/15/79
2. AECM-79/57, 6/1/79
3. AECM-79/100, 9/5/79
4. AECM-80/34, 1/31/80
5. AECM-80/ll7, 5/30/80 1 On February 12, 1979, Mississippi Power & Light Company notified Mr. J. K. Rausch of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns the failure of General Electric subcontractor, I&SE, to establish and implement an approved quality assurance program for electrical work performed under GE Field Deviation Disposition Requests (FDDR) and Field Deviation Instructions (FDI).

The GE subcontractor has developed and implemented a quality as-  !

I surance program to cover work parformed at GCNS.

As reported previously, work performed prior to the implementation of the above mentioned QA program has been re-inspected. We had ex- l pected to provide you a final report on this matter at this time. How-ever, GE has not completed their review of the inspection results and subsequent evaluation of safety implications.

We now expect to provide a final report on this matter by September 8, 1979, s

8 007220 %f 5 (

l Member Middle South Utilities System

i .

- MIL %ICOIPPI POWER O LIGHT COMPANY Mr. J. P. O'Reilly AECM-80/155 NRC Page 2 -

r Yours truly, t.

J. P. McGaughy, Jr.

l Assistant Vice President, Nuclear Production ATR:mt i

ec: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Director Division of Inspection & Enforcement