Status Deficiency Rept Re Effects of Loss of Site Power on Rod Position Indication & Neutron Monitoring.Deficiency Still Under Investigation.Final Rept Will Be Forwarded on 800723
ML19320A788
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/21/1980
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-80-105, NUDOCS 8007020615
Download: ML19320A788 (2)


Text

_ . . . . . _ _ _ _ _ _ _ . . _ _

o

  • 8 MISSISSIP#f P.OWER & LIGHT COMPANY Hel$ing Build Mississippi kHAIMMdd5 P. O. B O X 16 4 0. J A C K S O N. MIS SIS SIP PI 3 9 2 0 5
  • q f g y jl.j 3999 PRODUCTION DEPARTMCNT Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0272/15515/15526 PRD-80/04, Status Report No. 2, Effects of Loss of Site Power on Rod Position Indication and Neutron Monitoring AECM-80/105 Background information on this Potentially Reportable Deficiency (PRD) was provided in our first status report, AECM-80/82, dated April 3, 1980.

This deficiency pertains to the Loss of Site Power (LOSP) accident and its att e h nt effects on Rod Position Information System (RPIS) and Neutron Monitoring System (NMS).

This deficiency is still under investigation. Our determination on reportability, due this date, will be delayed. This delay is due to the complex nature of this issue and its relationship to other investigations associated with NRC IE Bulletin No. 79-27, " Loss of Non-Class 1E Instrumentation and Control Power System Bus During Operation," and NRC Regulatory Guide 1.97,

" Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant Conditions During and Following an Accident."

i We intend to provile a determination on reportability and final report on PRD-80/04 by July 23, 1980.

Yours truly, hs%*  %

L. F. Dale Nuclear Project Manager g/7 JGC/TMJ:lm

. cc: (See Next Page)

O

@0'20M b heg Member Middle South Utilities System

o.
  • MISSISSIPPI POWER & LIGHT COMPANY Mr. J. P. O.'Reilly, Director AECM-6C/105 U.S. Nuclear Regulatory Commission Page 2-cc: Mr.-N. L. !tampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Occllo, Jr., Director Division of Inspection & Enforcement i U.S. Nuclear Regulatory Commission Washington, D. C. 20555 4