Status Deficiency Rept 4 Re GE Failure to Implement Proper QA Program for Electrical Work.Util Is Reviewing Reinsp of QA Program.Final Rept Will Be Submitted by 800714
ML19320A754
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/30/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-80-117, NUDOCS 8007020579
Download: ML19320A754 (2)


Text

- _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I1coIl'.1Ito-m*I ,

o . . . ,

. a 7 .; MISSISSIPPI POWER & LIGHT COMPANY R2 Helping Build Mississippi henMhhimim5 P. O. B OX 16 4 0. J A C K S O N. MISSIGSIPPI 39205 May 30, 1980 8 900uCTf 0N DEPARTMENT Office of Inspection & Enforcement U.S. Suclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director Daar Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nas. 50-416/417 File 0260/15525/15526 PRD-79/03, Status Report #4, Failure to Implement Proper QA Procedures

AECM-80/ll7 On February 12, 1979, Mississippi Power and Light Company notified Mr. J. K. Rausch of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns the failure of General Electric subcontractor, I&SE, to establish and implement an approved quality assurance program for electrical work performed under GE Field Deviation Disposition Requests (FDDR) and Field Deviation Instructions (FDI).

As reported to you previously, GE-I&SE has developed and implemented a quality assurance program to cover work performed by GE-I&SE at GGNS.

All work performed prior to the implementation of the above mentioned quality assurance program has been reinspected by GE-I&SE in light of the new program. We are currently in the process of reviewing and verifying the results of that reinspection. Our analysis of safety implications will be based on this review.

We now expect to provide our determination on reportability and final report on this matter no later than July 14, 1980.

Yours truly, D

J. P. McGaughy, Jr. $

Assistant Vice President Nuclear Production fO JGC/JDR:1m Uh LCib CCM-cc: (See Next Page)

B0070205 M .S Member Middie Soutn utiiities System

l 4

MISSISSIPP! POWER & LIGHT COMPANY Uf fice of Inspection & Enforcement AECM-80/ll7 U.S. Nuclear Regulatory Commission Page 2 cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Jr., Director Division of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555