R;v. 3 3/23/78
/
Document Section
. NFORM ATION ONL N
. C. R. Nuclear .
SURVEILLANCE PROCEDURE SP-532 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 REACTOR BUILDING MAIN AND AUXILIARY (FHCR-1 AND FHCR-2) FUEL HANDLING BRIDGES ELECTRICAL INTERLOCK SURVEILLANCE
~
- ish-3,C2 M
(fl/3/j7E J :._ .' .' 7 *,
REVIEWED BY: Plant Revi / Coc y ; I ,
~
lkl As
' l.' A/hhi Da i i Meeting No. _ M APPROVED BY: Nuclear Plant Manager 9?? 3 M / foe 8003130 'W Date bl/]7/77
1.0 SURVEILLANCE REQUIREMENTS r
1.1 Main and auxiliary fuel handling bridge and trolley electrical interlocks shall be demonr: rated operable within seven days prior to fuel handling operations employing FHCR-1 and/or FHCR-2 and at least once per seven days dur'ing operation.
1.2 REQUIREMENTS REFERENCE i Sury. Req.'d Mode Surv. Freq.
Source During Modes Notes Freq. Notes
! . FPC Practice 6 29 W 40 Surveillance Frequency: W - Weekly Mode Notes: 29 - Movement of cantrol rods or fuel assemblies within the reactor pressure vessel or other irradiated fuel movement in progress.
Frequency Notes: 40 - Establish prior to ascent into applicable mode (prior to beginning core alterations).
\ .
2.0 ' ACCEPTANCE CRITERIA Successfal completion of Data Sheet I (Enc,losure 1) and Data Sheet II (Enclosure 3).
3.0 REFERENCES
NEEDED TO DO PROCEDURE 3.1 FP-601, Fuel Handling Equipment Operations 3.2 Plan View Electrical Interlocks Reactor Main Bridge (FHCR-1),
Enclosure 2 3.3 Plan View Electrical Interlocks Reactor Auxiliary Bridge (FHCR-2),
Enclosure 4 Page:1 SP-532 Date_3/23/78 Rev. 3
4.0 SPECIAL CONDITIONS OR REQUIREMENTS T
Refer to FP-601, Fuel Handling Equipment Operations. When verifying wall limit interlocks, attention should be given to extremely slow movement of bridge or trolley.
4.1 Extreme caution should be exercised in the #-llowing areas:
4.1.1 Bumper stop en south wall inoperative.
4.1.2 Bumper stops on east and west walls will not operate if temporary grating is in place.
5.0 EQUIPMENT REQUIRED Refer to FP-601, Fuel Handling Equipment Operations.
6.0 PROCEDURE NOTE: Refer to Data Sheet I (Enclosure 1) and Enclosure 2.
6.1 Position main bridge over reactor at position RTR.-H8.
(
6.1.1 Run trolley f'otward until it stops (LS-13 trolley forward stud limit) and verify that:
- a. Bridge will NOT move left or right.
- b. Trolley wiil move reverse.
6.1.2 Run trolley reverse until it stops (LS-12 trolley reverse stud
-limit) and verify that:
- a. Bridge will NOT move left or right.
- b. Trolley will move forward.
6.1.3 Position bridge over reactor at RTR-H8.
6.1.4 Run bridge left enough to actuate LS-11 closed; white " Hoi Slow Zone" light'comes on.
6.1.5 Verify that trolley will move forward and reverse to stud limits.
Page 2 SP-532 Date 12/9/76 Rev. 2
6.1.6 Run trolley to position "H"; run bridge left to position fuel mast on centerline of transfer basket using Selsyn index marks.
6.1.7 Position transfer basket #2 in full "Down" position.
6.1.8 Run trolley forward to LS-10 (trolley just past transfer
- 2 centerline).
6.1.9 Verify that fuel hoist cannot be lowered.
6.1.9.1 Move trolley reverse to rack position "G".
6.1.10 Raist transfer basket #2 to the full "Up" position.
6.1.10.1 Move trolley forward to LS-10.
6.1.11 Verify that fuel hoist cannot be lowered using fuel hoist control handle.
6.1.12 Verify that fuel hoist will lower using " Jog" button.
6.1.13 Raise fuel hoist until " Grapple Up Disengage" light illuminates 1 using " Jog" pushbutton.
6.1.14 Move bridge left until it stops (LS-16 trolley permissive
~
relay)_and verify that: -
- a. Trolley will NOT cove forward. .
- b. Trolley will move reverse.
- c. Bridge will NOT move right.
6.1.15 Turn bridge "Right Bypass" to "On" position.
6.1.16 Move bridge right approximately one to two inches to actuate LS-16.
6.1.17 Turn bridge "Right Bypass" to "Off" position and verify that:
- a. Bridge will move lef t and right.
NOTE: LS-16 allows approximately two inches of travel over transfer basket centerline.
s b.
- Trolley will move' forward and reverse, i
Page 3 SP-532 Date 12/9/76 Rev. 2
6.1.18 Run trolley reverse to rack position "G".
/
6.1.19 Lower transfer basket #2 to full "Down" position.
6.1.20 Run trolley forward to LS-10 (trollay just past transfer basket f2 centerline).
6.1.21 Place bridge "Left Bypass" switch to "On" position and run bridge left to Selsyn index for rod mast on centerline of transfer basket #2.
6.1.22 Place bridge "Left Bypass" switch to "Off" position and verify that rod hoist cannot be lowered.
6.1.22.1 Move . trolley reverse to rack position "G".
6.1.23 Raise. transfer basket #2 to the full "Up" position.
6.1.23.1 Move trolley forward to LS-10.
6.1.24 Verify that rod hoist cannot be lowered using rod hoist control handle.
6.1.25 Verify that rod hoist will lower using rod " Jog" button.
(Lower until " Control Rod Tube Up" light just goes out.)
6.1.26 Raise rod hoist until " Control Rod Tube Up" light illuminates using " Jog" pushbutton.
6.1.27 Move bridge lef t until it Otops (LS-16 trolley permissive relay) and verify that:
- a. Trolley will NOT move forward.
- b. Trolley will move reverse.
- c. Bridge will NOT move right.
6.1.28 Turn bridge "Right Bypass" to "On" position.
6.1.29 Move bridge right approximately one,to two inches to actuate LS-16.
Page 4' SP-532 Date 12/9/76 Rev. 2
~6.1.30 Turn bridge "Right Bypass" to "Off" position and verify I
that:
- a. Bridge will move left and right.
NOTE: LS-16 allows approximately two inches of travel over transfer basket centerline.
- b. Trolley will move reverse and forward.
6.1.31 Move trolley reverse to ' rack position "D".
6.1.32 Lower transfer. baskets #1 and #2 to full "Down" position.
6.1.33 Move trolley reverse to LS-9 (trolley just past transfer basket #1 centerline).
6.1.34 Verify that the rod hoist cannot be lowered.
6.1.34.1 Move trolley forward to rack position "B". ,
6.1.35 Raise transfer basket #1 to full "Up" pos'.cion.
6.1.35.1 Move trolley reverse to LS-9.
1 6.1.36 Verify that the rod hoist will NOT lower using the rod hoist control handle.
. 6.1.37 Verify that rod hoist will lower using rod " Jog" pushbutton.
(Lower until " Control Rod Tube Up" light just goes out.) l 1
6.1.38 Raise rod hoist until " Control Rod Tube Up" light illuminates !
l using rod " Jog" pushbutton.
I 6.1.39 Move bridge lef t until it stops (LS-16 trolley permissive relay) and verify that:
- e. Trolley will NOT cove - 2 verse. !
- b. Bridge will NOT move right.
- c. Trolley will move forward. .
l 6.1.40 Turn bridge "Right Bypass" on. !
6.1.41 Move bridge right approximately one to tw2 inches to actuate LS-16.
I l
Page 4a ,.SP-532 Date 12/9/76 )
Rev. 2 j
c- 6.1.42 Turn bridge "Right Bypass" off and verify that:
- a. Bridge will move lef t and right.
NOTE: LS-16 allows approximately two inches of travel over transfer basket centerline.
- b. Trolley will move forward and reverse.
6.1.43 Move trolley forward to rack position "B".
6.1.44 Lower transfer basket #1 to full "Down" position.
6.1.45 Move trolley r'everse to LS-9 (trolley just past transfer basket #1 centerline).
6.1.46 Turn bridge "Right Bypass" on.
6.1.47 Move bridge right to Selsyn index for fuel mast on centerline of transfer basket #1.
6.1.48 Turn bridge "Right Bypass" off.
6.1.49 Verify that fuel hoist cannot be lowered.
6.1.49.1- Move trolley forward to rack position "B". -
. 6.1.50 Raise transfer basket #1 to full "Up" position.
6.1.50.1 Move trolley reverse to LS-9.
6.1.51 Verify that the fuel hoist will NOT lower using the fuel hoist control handle.
6.1.52 Verify that the fuel hoist will lower using the fuel " Jog" button; lower until " Grapple Up Disengage" light just goes out.
6.1.53 Raise fuel hoist until " Grapple' Up Disengaged" light illuminates using fuel " Jog" pushbutton.
6.1.54' Move bridge lef t until it stops (LS '16 trolley permissive relay) and verify-that:
-Page 4h SP-532 Date 12/9/76 Rev. 2 ,
- a. Trolley will NOT move reverse.
7
- b. Bridge will NOT move right.
- c. Trolley will move forward.
6.1.55 Turn bridge "Right Bypass" to "On".
6.1.56 Move bridge "Right Bypass" approximately one to two inches to actuate LS-16.
6.1.57 Turn bridge "Right Bypass" off and verify th&t:
- a. Bridge will move left and right.
NOTE: LS-16 allows approximately two inches of travel over transfer basket centerline.
- b. Trolley will move foreard and reverse.
6.1.58 Tu;:n bridge "Left Bypass" on.
6.1.59 Move bridge left to position rod mast over transfer basket
- 1 centerline.
6.1.60 Turn bridge "Lef t Bypass" of f.
6.1.61 Move trolley forward to center of travel and lower transfer basket #1 to full "Down" position. -
6.1.62 No restoration required.
i6.1.63 Complete applicable section of Bridge Log Sheec.
Page 4c SP-532 Date 12/9/76 Rev. 2
NOTE: Refer to Data Sheet II (Enclosure 3) and Enclosure 4.
f.
6.2 Position auxiliary bridge over reactor at position RTR-H8.
6.2.1 Run trolley forward until it stops (LS-12 trolley forward stud j limit) and verify that:
- a. Bridge will NOT move left.
- b. Bridge will move right.
- c. Trolley will move reverse.
6.2.2 Run trolley reverse until it stops (L,S-13 trolley reverse stud limit) and verify that:
- a. Bridge will NOT move left.
- b. Bridge will move right.
- c. Trolley will move forward.
6.2.3 Position bridge at RTR-H8.
6.2.4 Run bridge right until it stops (LS-10 bridge right, trolley reverse stop) and verify that:
, a. Trolley will NOT move reverse.
- b. Trolley will move forward.
6.2.5 Run trolley forward until it stops (LS-ll trciley on parking cam).
6.2.6 Move bridge right to " Park" position (right trave 1 limit con-trolled by bumper stop).
6.2.7 Run bridge left until it stops (LS-10).
6.2.8 Run trolley reverse to center of travel.
6.2.9 Run bridge left until.it stops (LS-5 bridge at left reactor limit) and verify that:
- a. Trolley will move forward.
- b. Trolley will move reverse.
Page 5 SP-532 Date 12/9/76 now. 7
6.2.10 Move auxiliary bridge to parking position indicated on Enclosure I ~4 -(Sections 6.2.4 thru 6.2. 6).
6.3 No restoration required.
6.4 Complete applicable'section of Bridge Log Sheet.
6.5 Notify the Shift Superviscr of the completion and results of:
this Surveillance Procedure.
f' I
N Page 6 SP-532 Date 5/21/76 Rev. 1
ENCLOSURE 1
- DATA SHEET I -
MAIN FUEL HA' IDLING BRIDGE INTERLOCK SURVEILLANCE Procedure Step Action Initials 6.1.1 Trolley is stopped (LS-13).
6.1.2 Trolley is stopped (LS-12).
(Fuel) 6.1.9 Hoist cannot be lowered.
(Fuel) 6.1.11 Hoist cannot be lowered with hoist control handle.
(Fuel) 6.3. 12 Heist can be lowered with " Jog" button.
-6.1.14 Bridge is stopped (LS-16). !
(Rod) 6.1.22 Hoist cannot be lowered.
(Rod) 6.1.24 Holst cannot be lowered with hoist control handle.
(Rod) 6.1.25 Hoist can be lowered with " Jog" button.
6.1.27 Bridge is stopped (LS-15).
(Rod) 6.1.34 Hoist cannot be lowered. *
(Rod) 6.1.36 Hoist cannot be lowered with hoist control handle.
(Rod) 6.1.37 Hoist can be lowered with " Jog" button.
6.1.39 Bridge is stopped (LS-16).
(Fuel) 6.1.49 Hoist cannot be lowered.
(Fuel) 6.1.51 Hoist cannot be lowered with hoist control handle.
(Fuel) 6.1.52 Hoist can be lowered with " Jog" button.
6.1.54 Bridge is stopped (LS-16).
COMMENTS:
(
Performed By Date Page 7 SP-532 Date 12/9/76 L
Rev. 2 }j
~
(7 co LS-10 (RT2)
Closed . -
Stud 1 -
LS-13 (FSL) y i , -
Open Transfer Q.
- - - - I r
No.2 .
JL Closed 4 --g>- Open e LS-11 (RPR) 8 y
e
~
Forward Bumper 4 ]N REACTOR Le f t. 4 -P-Right cn Stop -
'o _ _ ,
s 1 y
8 Reverse u -
V /
Transfer .
No.1 ]. - - - -
y g \
ll Open LS-12 (RSL)
Closed LS-5 o (LS-9 (RTI) Open g ,
_p e Proximity y 'uel Rod D '
h LS-J6 (TPR) E Closed on Cam PLAN VIEW ELECTRICAL INTERLOCKS o-REACTOR MAIN BRIDGE (FilCR-1) hF8
~
-c - - -
+ ENCLOSURE 3
- DATA SHEET II -
AUXILIARY FUEL HANDLING BRIDGE INTERLOCK SURVEILLANCE Procedure Step
~
Action Initials 6.2.1 Trolley is stopped (LS-12).
6.2.2 Trolley is stopped (LS-13).
6.2.4 Bridge is stopped (LS-10).
6.2.5 Trolley is stopped (LS-11).
6.2.7 ,
Bridge is stopped (LS-10).
6.2.9 Bridge is stopped (LS-5).
COMMENTS:
l 1
Performed By Date i
l l
I I
I i
Page 9 SP-532 Date 2/21/76
E 1
o LS-12 (FSL) Bumper LS-ll (PR) Hast Parking Open Stop Closed on Cam Position LS-6 /L A Proximity < ,
U s- - - ' - -
l S. --__
? j(
- x i i N
- a s -
Forward l h n -
Left 4- -b> Right REACTOR 9> Bumper m y 1 Stop 7 Reverse l 5- l .
E e .
- i. ..e-e Stud Maintained Y Y
- Closed Closed wa--C> Open Open Bumper LS-10 (llT) g LS-5 (LRR) LS-13 (RSL) Stop E
m 3 PLAN VIEW ELECTRICAL INTERLOCKS q REACTOR AUXILIARY BRIDGE $
y
{
(FilCR-2) m M
V
_ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . _ _