ML19310A335

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Carbon Filters,Type NPP-2, Supplied by Farr Co. Vendor Reported That Test Equipment Used for Qualifying Filters Was Unreliable.Filters Returned for Verification of Quality & Reliabilty
ML19310A335
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/30/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To:
References
REF-PT21-79-160-001 AECM-80-118, NUDOCS 8006110109
Download: ML19310A335 (2)


Text

- ____.

80-023-03L 80-Ol8-03L

't MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 18 4 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 May3bf1980 PaODUCTION DEP A RTMENT Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region Il 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 ,

File 0260/15525/15526 PRD-80/25, Status Report, Carbon Filters Supplied by Farr Company AECM-80/118 On May 2, 1980, Mississippi Power and Light Company notified Mr. F. Cantrell of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (CGNS) construction site. The deficiency concerns carbon filters, Type NPP-2, supplied by the Farr Company.

Farr has reported this matter to the NRC pursuant to 10 CFR 21. Farr reported a lack of reliability in the test equipment used in qualifying the above referenced carbon filters. Subsequently, all Farr filters supplied to GGNS have been returned to the vendor for re-testing and evaluation.

Farr has been requested to verify the quality and reliability of the filters supplied to GGNS. Upon receipt of this evaluation, we will determine the safety implications and reportability of this matter. This matter is being tracked by Bechtel MCAR-GGNS No. 79 and PRD-80/25. We expect to

'j provide our final report on this matter no later than Septs:nber 9,1980.

Yours truly, J. P. McGaughy, Jr. 30/7 g Assistant Vice President Nuclear Production JGC/JDR:lm cc: (See Next Page) 0FFICIAL COW.

800611otoq Member Middle South Utilities Sy-tem

MISSISSIPPI POWER 8: LIGHT COMPANY Office of Inspection & Enforcement AECM-80/118 U.S. Nuclear Regulatory Consnission Page 2 cc: Mr. N. L. Stampley

Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Jr., Director Division of Inspection & Enforcement U.S. Nuclear Regulatory Conunission Washington, D.C. 20555 d

..---..~..,n... -

. - __ _ . _ . _,