ML19309A936

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 8 to License DPR-54
ML19309A936
Person / Time
Site: Rancho Seco
Issue date: 12/23/1976
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19309A927 List:
References
NUDOCS 8004010690
Download: ML19309A936 (2)


Text

_ ___

i UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-312 ggg SACRAMENTO MUNICIPAL UTILITY DISTRICT NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 8 to Facility Operating License No. DPR-54, issued to Sacramento Municipal Utility District (the licensee),

which revised Technical Specifications for operation of the Rancho Seco Muclear Generating Station (the facility) located in Sacramento County, California. The amendment is effective as of its date of issuance.

This amendment changes the power distribution Technical Speci-fications limiting control rod insertion and power imbalance.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commis-sion's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement, 8004010$7d w

3

. or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

4 For further details with respect to this ection, see (1) the application for amendment dated October 4,197f, (2) Amendment !!o.

8 to License flo. DPR-54, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Docunent Room,1717 I! Street, !!.

U.,

Washington, D.C. and at the Business and l'unicipal Department, Sacramento, City-County Library, 820 I Street, Sacramento, California.-

A ccpy of items-(2) and (3) may be obtained upon request addressed to the U. S. l'uclear Regulatory Cocnission, Uashincton, D. C. 20055, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, l'aryland, this 23 day of December 1976.

FOR THE fillCLEAR REGULATORY ColNISSle:1 Vernon L. P Acting Chief Operating Reactors Pratich Fo Division of Operating Reactors

.