Letter Sequence Approval |
|---|
TAC:11078, (Approved, Closed) TAC:11091, (Approved, Closed) TAC:11092, (Approved, Closed) TAC:11094, (Approved, Closed) TAC:11095, (Approved, Closed) TAC:11109, (Approved, Closed) TAC:11111, (Approved, Closed) TAC:11112, (Approved, Closed) |
|
MONTHYEARML20244A4731978-09-29029 September 1978 Forwards Addl Info in Response to 780718 NRC Ltr Re Site Rev Scheduled on Fire Protec Prog on 781105 Project stage: Other IR 05000334/19780301978-12-0101 December 1978 IE Insp Rept 50-334/78-30 on 781031-1103.No Noncompliance Noted.Major Areas Inspected:Fire Protection Program,Piping Supports & Containment Liner Welds Project stage: Request ML20071G0181978-12-11011 December 1978 Forwards Addl Info Requested in 780718 NRC Ltr Re Fire Protec Prog.Subj Covered Incl:Combined Fire & Security Emergency Personnel,Failure Analysis,Suppl Fire Dept, & in-house Audit Plan Project stage: Other ML19256A8511979-01-11011 January 1979 Responds to Re Plant Fire Protection Program. Includes Implementation Schedule Summary.Activities & Mods Will Be Completed During Refueling Outages of 1981 & 82 Project stage: Other ML19274D8501979-02-21021 February 1979 In Response to ,Forwards Suppl Implementation Schedule for Fire Protection Commitments Re Equipment Installation Project stage: Other ML20244A5661979-03-26026 March 1979 Summarizes 790305 Meeting W/Util on Site to Discuss Fire Protection for Facility.Attendance List & Proposed Mods List Encl Project stage: Meeting ML19224D6581979-06-0606 June 1979 Amend 18 to License DPR-66,revising Tech Specs Re safety-related Snubbers,Fire Protection,Chemical Releases & Environ Considerations Project stage: Other ML19224D6561979-06-0606 June 1979 Forwards Amend 18 to License DPR-66,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19246B0091979-06-21021 June 1979 Approves Fire Protection Program Developed by Brookhaven & Nrc.Offers Exceptions for NRC Evaluation:Electrical Valve Supervision Should Be Provided on All Valves Controlling Fire Water Sys Project stage: Other ML19208C9751979-08-24024 August 1979 Urges Util to Improve Schedules for Completion of Fire Protection Mods Prior to Oct 1980.Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis Project stage: Other ML19259D3421979-09-0606 September 1979 Fire Protection Safety Evaluation Supporting Amends 39 & 33 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML19259D3371979-09-0606 September 1979 Amends 39 & 33 to Licenses DPR-42 & DPR-60,respectively, Adding License Conditions Re Completion of Mods & Implementation of Administrative Control Project stage: Other ML19250A3691979-10-17017 October 1979 Submits Revised Implementation Dates for Fire Protection Mods & Reasons for Delay Project stage: Other IR 05000282/19790231979-10-22022 October 1979 IE Insp Repts 50-282/79-23 & 50-306/79-19 on 790917-30.No Noncompliance Noted.Major Areas Inspected:Maint,Security, Review,Audit & Radiation Protection Project stage: Request ML19250A7751979-10-22022 October 1979 Revised Fire Protection Safe Shutdown Analysis Project stage: Other ML19250A7731979-10-22022 October 1979 Forwards Revised Fire Protection Safe Shutdown Analysis. Rept Supersedes Section 7 of 770311 Fire Hazards Analysis & 770705 Suppl Project stage: Other ML19256E0141979-10-23023 October 1979 Forwards Proprietary Version of Two Sets of Cable Routing Drawings for Review of Fire Protection Safe Shutdown Reanalysis.Drawings Withheld (Ref 10CFR.790) Project stage: Other ML19256E6011979-10-30030 October 1979 Forwards Fire Protection Analyses of Alternate Methods of Spent Fuel Pool Cooling,In Response to Requirements of NRC 790906 Fire Protection Safety Evaluation Project stage: Other ML19210C1101979-11-0505 November 1979 Notifies of Deviation from 790221 Schedule for Implementation of Fire Protection Sys.Installation of Temporary Fire Detectors in Unit 2 Control Room Area Will Be Completed by 791109 Project stage: Other ML19253C8481979-11-30030 November 1979 Forwards Evaluation of Electrical & Mechanical Penetration Seals & Fire Detectors Required by 790906 Fire Protection Safety Evaluation Rept Project stage: Other ML20125B9811979-12-26026 December 1979 Forwards Addl Info in Form of Design Details,Test Results Acceptance Criteria in Response to Section 3.1 of NRC 790906 Fire Protection Safety Evaluation to Assure Acceptability of Mod Design.Requests NRC Comment by 800301 Project stage: Other ML19257A2871979-12-27027 December 1979 Advises of Inability to Comply w/790111 & 0221 Commitment Re Fire Protection Sys Implementation Schedule.Engineering Work More Complex than Anticipated Project stage: Other ML19290C2671979-12-31031 December 1979 Forwards Evaluations Required Per 790906 Fire Protection Safety Evaluation Items 3.2.3 & 3.2.7.Addl Info Re Items 3.2.5 & 3.2.6 Will Be Provided When Available.Nrc Comments Re Mods Should Be Sent by 800301 Project stage: Other ML19290C8781980-01-26026 January 1980 Request Assistance in Review of Licensees Proposed Mods to Meet Fire Protection Safety Evaluation Commitments.Schedule for Evaluations Should Be Consistent W/Implementing Mods by 801101 Project stage: Approval ML19260D3991980-01-31031 January 1980 Forwards Design Details for NRC 791231 Fire Protection Safety Evaluation Rept,Items 3.19-1 & 3.19-2.Requirement to File Design Prior to Implementation Was Overlooked Project stage: Request ML19309C1441980-03-31031 March 1980 Submits Revised Schedule for Implementing Fire Protection Mods Project stage: Other ML19323A1941980-04-0404 April 1980 Advises That 800131 Proposed Design Basis Re Addl Smoke Detectors for Control Room & 1-h Fire Rated Barrier Meet Guidelines & Are Acceptable Project stage: Other ML19309G8641980-04-21021 April 1980 Forwards NRC Evaluation of Util 791030,1103 & 1231 Submittals of Design Details & Addl Info to 790906 SER Re Proposed Fire Protection Program.Fire Protection Mod Acceptable.Alternate Shutdown Sys Not Yet Evaluated Project stage: Other ML19338G6211980-06-30030 June 1980 Fire Qualification Test on Retrofit Penetration Seals Project stage: Other ML19329F7781980-07-0808 July 1980 Forwards Response to NRC 800618 Questions Re Safe Shutdown in Event of Fire Project stage: Other ML19330C3981980-07-31031 July 1980 Proposed Tech Specs,Revision Sections 3.14 & 4.16 Re Fire Detection & Protection Sys Project stage: Other ML19330C3931980-07-31031 July 1980 Application for Amend to App a Tech Specs of Licenses DPR-42 & DPR-60,revising Sections 3.14 & 4.16 Re Fire Detection & Protection Sys Project stage: Request ML19330C3881980-07-31031 July 1980 Forwards Application for Amend to App a Tech Specs of Licenses DPR-42 & DPR-60,adding Addl Fire Protection Requirements Project stage: Request ML19338C4291980-08-0808 August 1980 Submits Revised Schedule for Fire Protection Mods. Replacement Nozzles for Booster Hoses Will Be Installed by 801031.Design Change Package for Trenches,Ramps & Curbs Will Be Completed by 801031 Project stage: Other ML19336A4661980-10-0101 October 1980 Forwards Mods Required to Resolve Open Items Indicated in 790606 Safety Evaluation Re Fire Protection Project stage: Approval ML19351D4901980-10-0303 October 1980 Requests Extension Until 810101 to Comply W/Nrc 790906 Fire Protection Ser.Mods Will Be Made to Penetration Seal Upgrade,Turbine Bldg Structural Steel Coating,Alternate Shutdown Capability & Addl Fire Dampers Project stage: Other ML19338G6171980-10-24024 October 1980 Forwards Fire Qualification Test on Retrofit Penetration Seals, in Response to NRC Requesting Addl Info Required by Fire Protection Safety Evaluation Project stage: Other ML19339A5861980-10-30030 October 1980 Forwards Addl Info Re Fire Protection Sys Mods,Per NRC 801001 Request.Oversize Drawings Encl Project stage: Other ML19339C8231980-10-31031 October 1980 Notifies of Interim Rule Suspending Completion Dates for Fire Protection Mods Previously Approved by Nrc.Fr Notice Encl Project stage: Other ML19345C4801980-11-17017 November 1980 Informs of Interim 10CFR50.48 Suspending Completion Dates for Previously Approved Fire Protection Mods.Revised 10CFR50.48 Will Contain Schedules for Completion of All Fire Protection Mods Project stage: Other ML19340D4581980-11-21021 November 1980 Amend 66 to License DPR-46,changing Tech Specs to Provide Addl Limiting Conditions of Operation & Surveillance Requirements for Fire Protection Equipment Project stage: Other ML19340D8721980-11-24024 November 1980 Ltr to All Power Reactor Licensees W/Plants Licensed Prior to 790101.Forwards Fr Notice of Revised 10CFR50.48 & App R Re Fire Protection Features in Nuclear Power Plants Project stage: Other ML19345B2861980-11-24024 November 1980 Requests Amend to Licenses DPR-42 & DPR-60 Re Decay Heat Removal Capability.Water Depth Over Irradiated Fuel Tech Spec Changes Also Proposed Project stage: Request ML20002D0841980-12-23023 December 1980 Notifies That Util 781211 Commitment to Install Addl Hoses & Hose Stations Is Acceptable for Meeting Concerns Re Item 3.3-7 of Safety Evaluation for Amend 18 to OL Project stage: Approval ML19339D0071981-02-0909 February 1981 Requests Extension of Completion Dates for Approved Fire Protection Mods,Per .Specific Items & Estimated Completion Dates Discussed.Schedule for Mods Per Will Be Submitted by 810319 Project stage: Other ML20003C3101981-02-13013 February 1981 Notice of Extension of Completion Dates for Fire Protection Mods Until 811117 Project stage: Other ML20003C4131981-02-13013 February 1981 Approves 810209 Request for Extension of Installation Date of Fire Pump Encl & Related Day Tank Curbing to 810601.FR Notice Encl Project stage: Other ML20003C3071981-02-13013 February 1981 Approves Request for Extension of Completion Date for Fire Protection Sys Alternate Water Supply Tank Installation Until 811117.FR Notice Encl Project stage: Other ML19351F9171981-02-13013 February 1981 Forwards License Amend or Approval Class Determination Form & Licensing Fee Payment for Extension Request Re Fire Protection on Mods Implementation Schedule Project stage: Other NRC Generic Letter 1981-121981-02-20020 February 1981 NRC Generic Letter 1981-012: Fire Protection Rule (45 Fr 76602, November 19, 1980) Project stage: Request 1980-01-26
[Table View] |
Request Assistance in Review of Licensees Proposed Mods to Meet Fire Protection Safety Evaluation Commitments.Schedule for Evaluations Should Be Consistent W/Implementing Mods by 801101| ML19290C878 |
| Person / Time |
|---|
| Site: |
Beaver Valley, Nine Mile Point, Cooper, Prairie Island, Surry, Crystal River  |
|---|
| Issue date: |
01/26/1980 |
|---|
| From: |
Eisenhut D Office of Nuclear Reactor Regulation |
|---|
| To: |
Mattson R Office of Nuclear Reactor Regulation |
|---|
| References |
|---|
| TAC-11078, TAC-11091, TAC-11092, TAC-11094, TAC-11095, TAC-11109, TAC-11111, TAC-11112, NUDOCS 8002140690 |
| Download: ML19290C878 (2) |
|
Text
/d N lYJ(
f1jo arog\\,
UNITED STATES y*,er, g
NUCLEAR REGULATORY COMMISSION
.. E WASHINGTO N, D. C. 20555
';; Y%[,E
\\.',','..
- JAN 2 61980 MEMORANDUM FOR: Roger J. Mattson, Director Division of Systems Safety FROM:
Darrell G. Eisenhut, Acting Director Division of Operating Reactors
SUBJECT:
REQUEST FOR REVIEW ASSISTANCE -
FIRE PROTECTION PROGRAM The fire protection Safety Evaluation Reports for operating plants have been completed however, there remair, a number of open items for each plant. These items consist of licensee's proposed modifi-cations to meet SER comitments and issues that were not completely resol ved.
Per our discussion with F. Schroeder, we understand that DSS resources are available to assist us in the review of these open items. Accordingly, as further discussed with V. Benaroya
'.its :
understand you will complete the reviews for the following p.
TAC M
l.
Beaver Valley 11111 D. Wigginton 2.
Cooper 11112 V. Rooney 3.
Crystal River 3 11109 M. Fairtile 4.
Nine Mile Point 11078 P. Polk 5.
Surry 1 and 2 11091/11092 D. Neighbors 6.
Prairie Island 1 and 2 11094/11095 M. Grotenhuis The infomation to be reviewed and the initiating TAC forms should be obtained from the cognizant Project Manager. Coordination with previous reviewers should be coordinated through E. Sylvester, PSS/
00R. Your evaluation of the modification designs and the supplement SERs which close our incomplete items should be forwarded to the cognizant OR Branch Chief.
Your schedule for these evaluations should be consistent with implementing all modifications by November 1,1980.
ing Director Division of Operating Reactors
Contact:
E. Sylvester, X27877 8002140