a D*]D
- 0 Wd O
3
?
UNITS 0 STATES
[#
y -
NUCLEAR REGULAT, CRY cCMMisslON Q j j, WASMNGTCN, D. C. 20555
, f.(
NE3RASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 CCCPER NUCLEAR STATION AMENCPENT TO FACILITY OPERATING L* CENSE Amencment No. 66 License No. CPR J6 1.
The Nuclear Regulatory Ccmmission (the Ccmmission) has fcunc :nat:
A.
The submi ttals by Nebraska Public Power District dated October 22, 1979 and January 16, 1980 comply wi th the standa.rds and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the subni ttals, the provisions of the Act, and the rules and regulations of tne Commission; C.
There is reasonable assurance (1) that the activities authorized by tnis amendment can be conducted without endangering the health and safety of the public, and (ii) tnat such activities will be conductea in compliance with the Ccmmission's regulations; b.
The issuance of this amencment will not be inimical to the common defense and security or to the healtn and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of tne Ccmmission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Soecifications as indicated in the attachment to this license amencment and paragraph 2.C(2) of Facility Operating License No.
OPR-46 is hereby amended to read as follows:
(2) Technical Saecifications The Technical Soecifications contained in Acpendices A and 3, as revised througn Amencment No. 66, are hereby incorporated in :ne license.
The licensee shall operate the facility in accordance with the Technical Specifications.
8012300 f y
. 3.
This license amendment is eff ective as of its date of issuance.
FOR THE.1UCLEAR REGULATORY COMMISSION "h.d l4
^
Thoma s
. Ippolito, Chief Operating Reactors 3 ranch *2 Division of Licensing Attac hnen t:
Changes to the Technical Specifications Dated:.Jov ember 21, 1980
=__
ATTACHMENT TO LICENSE AMENDMENT NO. 66 FACILITY OPERATING LICENSE NO. OPR-46 DOCKET NO. 50J298 Remove the following pages of the Appendix "A" Technical Specifications and replace with the enclosed pages.
The revised pages are identified by Amendnent number and contain vertical lines indicating the area of change.
Remove Insert 4
216c 216c 216e 216e 216f 216f 2161 216i 216j 216j 216k 216k 2161 2161 216m 216m 219 219 1
i
- g. N.
g......i..
e.,....O
- 3. f..k.... %...
- g.......a
. v R.= c= 1.u.. p \\.
- .c.v r.u. :
a L..
D
'D m r:n m
L
/....,.,
3..2 s.....;)
s....
ww o
.:r 4
l e
......,...,y s..
.......,..S., e.
........e i
t
.... r s..e. 4.
3 g s.. o.
..*y
. v e.. sq.
..s*
e
-s 4. s.
..... a.5 4..n. g.a.
- u. s. J 4.
s.
.L..
2.
2 20 s.
y...
2....
2.
.. s.. 3.. s..
y.. s...
.e g..
. s.
.ne...g.3.
......a..
g.q
.r
. s.
ve...
.s.y g wy 4..g s.
.s.s,4.
9
?
. i. s s...
.n..
4..
1
. w n. 4 4.. s.
.,....g,
- a. g e..
2.
..w.
o 4.u
.. s. ;...a 4 2. s.e s.
$..s.
4.
- a..s u.. ~..
..s
.ns
- ~ er r -.n...,
.d i.o a.. :
o
.~.
3 6
.. s s
- 3..
. ~.. s.. s. f,3 ;
..s.
34.
s.
S... n. r e.5 5. n. a..s. e,.
... s. 2..s,....J. d a. 4..
3s 4
w
- s. i. 4. 0 a. s.
.w r...
a 3
4.
2.r.
1..
s.s
.s.
. +
p*
7...
. e.y...a
. f
- 4... t.,
- *:. 4.
1,
.3.. a.
v e. e g o.. 4 3
. s k t.... a.
r.
4.p.
o.
.o ya..
.s a.. * *s.n g. s.e. *-.
.. s.
g s.. s. e.
- 8... 3 = '. s. g s..-
- s..=, a d.
s.f..
- y s..a.
s 4.. s.
.b.~....,
3.
C
.u..e.....
44.J.
- 4..d.4
,. l. 4...
4
)
4
..i i. o.
..)
'r...'.-
- * * *
- a. n d. #. * *, * *.r.*...,.
.y..
4 3...'
..a
.i 4
7.
3a.-..
-4
...s.e
,s,.
..f. - s.a.
1 1
3.
4.
p.
y.s '., s. e.
d..'
- u
.1 j.,
.s
- a
- s.. *. 3. s.
..*.*....*4.ys..
y.s
.C.e.
s**
- m. a...a..a..
j a.. f s.
3 s...*
- . s..
2 o.
t
.. ~....
om. s.s e.,
n.s s.
.n
.s..s
- s. ~.
1 i
ar :
s..y 2.
.<,s..,
m cs.
e.
2
..;.2 s., e. a..v
.v e.. s
.4 2.,.
i.
1.
- a. s. c....s.
. s..
.g
- seat,4..
..s.
a.s..., s. ' y s.
r.s....s
,3.,
.. s.. s.. s. r.
. s.
1
.3....:...w.
.2
.s. _.
- 4.., e.
- a...
- 2. a.. '..E a. m..
8.<
..8.'.., '. 1.
- a. #*.*
- 2..
.s.,
4..,.=~.s....=.
'. r.. =. *. 2. '. *
- i. i;o
<...s.v e..o p t,
.. d *. l a'
.w.
.' *".<8.'.,
~8.8.**
2
,,......,. e. 2...a.
4
.o
,. o
... s. e. 4.. s2
- s.. o. e.s. *. 4.... e 4.
4.
- 7..
4 p
.=es.
s
.a.
- 2. f.
2.h... 4. 2 0
- s. *. 4..s i. :
..a
.. s. e.g e.
4.
4.
4.
- f...
...s.
.. a.
y_4.
4,n
....$..s...
.t. s. e. s s i. s.
.a
.a i.
a.
4...
v
- .9.,4,.. $ n.. a.
- s..z.
i n yJ$
t
...q
.a
- s. s >..n. <.. s. a.
,..... u...e
.~ y
~.,.,. ? 4.. a. -. u..s
- o. '6 s e
.s e A.
- p. s. s 5... p s. 3 1
1 m.
.o.
o
. 3 ?. y a 4.
- i;
. a. 'e t
- 4.-
- s..s.
.sg.,.
s.
2.. e s. s.
..../.
- s. 3..r. 1 '.. g.
.im; 4
s
. a..
. u. s. e*. w 3..
.s...s.s.e.
. e...... s.,.. y 4.
4..
.y.2
.... 2.,
.e
.o..
...a
. s.
..... s.. s A. e s.
$.J. %. r s.e. e. 4. A. f..y.*sm..
4..
- s..f 3 0
.' E. 4 i.
..* s.p s.b ?. 2.
4 1
- a..s.e.
p. s.
. s..
.v.....e
..g
. 4. s *
- s.. #
e=.. '. "* a a.y.. m.
4 t
a...
J e. e c.
- "... e s. e..t.. e.
i
. e...s. ?. t g a
.s.gn..
h a 2
.r.
3 r
s..
- 4. m.
- 1
'.Ce
,t., 1gd
[
- s.e
- a
- d. a.
8. * * '. s e e. =..". 3. s e.
i.
4......
.y5._se.
w g a.s e.
.2 a.
a
, b.. d. 4..
- 3... n. s.
4.
0
.. a.
.a 6
- y *3. w.
. *
- m. e.. b e. "..
J.. * *. c. a..s.d
- sm
.a 0. s. e. d..s '\\
- s... s,..
- 4. q s q.
- d..s. c s.
I.
a.
.C o. - 4. s e
I.
$ s e.o. s...., s. d..
.7..*.,
.o
.1...
. 2 4 4 J f u-3.
4 e.
4...
l.
....e.,
and
.s I y s.e. J.f4.-
- s.
- s. s.. '
so....
31, O. y. s. 2.... n s.
4... J..
- 7. *
.o..
4...
.wJa s
j
..s**.
v s.. y s.
. w. s..,
J...
s...s se
.a
- 1..s.......s n.. a.
.w e.4..
u ')..tn Lr
.,C
.4 P
..ge.4.
.s eq. a
.s
.n.
2 4..,,a. M C,. y. 4.. 42/ 3,
- i..* 43,...g
.e o."
m.
. 4. o..,
.U. 9 4.
- 4. n C.. a.
2.4.
4.n. s 'K s.n, {
'.'i
/s 4Jyd..
..s.
- m. s.. b
. m..
o
~ 4. r..... 4 *s 3ne !
~. ~..
4...
.a.
s.n c.. 2..... e....
s..e
.. a.
as-.
s a.y2.
.s. -
-.a
,o.$..r.
i.
2a
. t s.
t.
.. a.
.. d. n e.
. =. 110 psi
...,.(. 2.3.. 's. i,
...r _...
.1 2y g. s..
n,3 a
?
I e.
/
- 7 66
.=....e*
- I q v.s g
. a.
LISITING CCNDITIONS FOR OPERAT CN SURVEII.I.ANCE RECUI'tTITS 3.15 (Cont' d) 4.15 (Cont'd) 2)
7erifying the diesel starts from a= bien:
condi:1cas on the auto-star: signal and oper-ates for > 15 sinutes while loaded with the fire pump.
7.
The fire pump diesel starting 24-volt battery bank and charger shall be de=enstrated CPERA31.E:
a)
At least once per 7 days by verifying that:
1) 2:e electrolyte level of each battery is above the places, and 2)
~he overall ba::ery vol-tage > 24 vol:s.
b)
At least :nce per 92 days by verifying that the specific gravity is appropriate for continued service of the bat:ery, c)
At least once per 13 =enths by verifying that:
1)
The batteries, cell plates and bat:ery racks show no visual indica-tion of physical damage or abnormal deteriora-tion, and 2)
The bactery-to-battery and terminal connections are clean, tight, free of corrosion and coated vich, anti-corrosion material.
3.16 SPRAY AND/CR SPRDIKLER SYSTDi 4.16 SPRAY A'ID/CR SPRINKLER SYSTri
_APPLICA3ILIr APPLICA3ILI*T Applies to the av..11 ability of autoca:1c Applies to :he availability of automatic Fire Protection :o Cable Spreading Room -
Fire Protection :o Cable Spreading Room -
i 918 Ft. H ev. of Control Building, Cable 913 Ft. Elev. of Control 3u11 ding, Cable Expansion Room - 913 Ft. Elev. of Controlled Expansion Room - 918 Ft. n ev. of Controlled Corridor, and Norrheast Corner - 903 Ft.
Corridor, and Northeast Corner - 903 Ft.
f Elev. of Reactor 3u11 ding.
Elev. of Reac:or Building.
CBJECT!7E N
m To assure automatic Fire Protection to the Cable Spreading Room - 913 Ft. Elev. of Con-
- rol 3uilding, Cable Expansion Room - 918 Ft.
Elev. of Controlled Corridor, and Northeast Corner - 903 Ft. Elev. of Reactor 3uilding. 216e
'LI51 TING CCNDITIONS 7CR OPERATICN l SURVEI1 LANCE REQUIRDfENTS 3.16 (Con:'d) 4.16 (cont'd)
S?ECUICATICNS SPECU! CATIONS A.
The Automatic Sprinkler Systems protec:-
A.
The Auto =acic Sprinkler Syste=s protectc ing de Cable Spreading Rocm, Cable ing the Cable Spreading Roem, Cable Expansion Room, and Northeast Corner -
Ixpansion Room, and Northeast Corner -
903 Ft. Elev. of Reac:or Building shall 903 Ft. Elev. of Reactor 3uilding shall be operable.
be demonstrated :o be operable by:
3.
If the require =ent of 3.16.A cannot be 1.
At least once per 12 =cnchs by net, establish a continuous fire va:Ch C7 cling each cascable valve in the vi:h backup fire suppression equipment flow path :hrough at least one for :he unprotec:ed area vi din 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; comple:e C7 ele of full ::avel.
res: ore :he system to CPER.L3LI scatus 2.
A-leas: once per 13 non:hs :
vi cin la days or prepare and subsi: a Special Report :o de Coo: mission pursu-an: :o Specificacion 5.7.2 vi:hin.he a) 3y performing a system func-nex: 30 days cuclining de action :aken,
- 1onal :es: which includes de cause of de inoperabili:7 an'. the s1=ulated auto =atic actua-plans and schedule for restoring the
- 1on of the system, and systas :o CPERA3LZ status.
1) 7erifying : hat the auto-natic valves in the flew path actua:e to their correct positions on a
- est signal, and 2)
Cycling each valve in de flow path that is not testable during plant operation through at least one complete cycle of full travel.
b)
By inspection of the spray headers to verify their integrity.
3.17 CAR 3CN DICXIDE SYS~EM 4.17 CAR 3CN DICIIDE SYSTEM APPLICA3ILI*T AF?tICA3ILITT Applies to :he operational status of the High Applies to the operational status of the Hig@
Pressure Carbon Dioxide Extinguishing System Pressure Carbon Dioxide Extinguishing System protecting.he Diesel Generator Rooms.
protecting the Diesel Generator Rooms.
1 CBJEC""G.
l To assure continuous Automatic Fire Protection for de Diesel Generator Rooms.
SPECUICAT!CNS SPEC UICATICNS l
A.
The High Pressure Carbon Dioxide Ex:in-A.
The High Pressure Carbon Dioxide Extin-guishing System protecting the Diesel guishing System procacting the Diesel Generacor Rocms shall be operable.
Generator Roems shall be demonstrated operable by:
l Amendment No 66 216f
L'IMITING CONDITIONS FOR OPERATION SURVEILLANCE REOUIREMENTS 3.20 YARD FIRE HYDRANT AND HYDRANT HOSE 4.20 YARD FIRE HYDRANT AND HYDRANT HOSE HOUSE HOUSE APPLICABILITY APPLICA3ILITY Applies to the operational status of the Applies to the operational status of the yard yard fire hydrant, HT-1 and associated fire hydrant, HT-1, and associated hydrant hydrant hose house located near the north-hose house located near the northwest corner west corner of the Intake Structure.
of the Intake Structure.
OBJECTIVE To assure continuous manual fire fighting cape.bility for the fire water pumps and service water pu=ps in the Intake Structure provided by the existing yard fire hydrant,.
HT-1, and the associated hydrant hose house.
SPECIFICATIONS SPECIFICATIONS A.
Yard fire hydrant HT-1 and its associ- ' A.
Yard fire hydrant HT-1 and associated I
ated hydrant hose house shall be hydrant hose house shall be deconstrated operable.
l operable:
3.
If the requirement of 3.20A cannot be 1.
At least once per 31 days by:
met, provide suf ficient additional lengths of 2h inch diameter hose a)
Visually inspecting the hydrant hose located in an adjacent operable hydrant house to assure all required equipment hose house to provide service to the is at the hose house.
unprotected area within one hour, if the inoperable fire hydrant or associated 2.
At least once per six months (once during hydrant hose house is the primary means March, April or May and once during of fire suppression; otherwise provide September, October or November) by:
the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Restore the hydrant or hose house to a)
Visually inspecting the yard fire operable status within 14 days or hydrant and verifying that the hydrant prepare and submit a Special Report to barrel is dry and that the hydrant is the Commission pursuant to Specification not damaged.
I 6.7.2 within the next 30 days outlininu the action taken, the cause of the 3.
At least once per 12 months by:
l inoperability and the plans and I
schedule for restoring the hydrant or a)
Conducting a hose hydrostatic test hose house to operable status.
at a pressure at least 50 psig greater than the maximum pressure a"ailable at the yard fire hydrant.
i b)
Inspecting all the gaskets and l
replacing any degraded gaskets in the couplings.
c) Performing a flow check of the j
hydrant to verify its operability.
l l
Amendment No. 66
-2161-l k
" W.I 3. '. '.
... e..,,,
,.e e.
,.-..N.
..t.. s...
=...
- 3. c =..=.,
s.t.
.t..
=..
~.gg
%. d.*.a t.. y.
t
...y.
N -,
12-e.
c.tQ 3 S..t '.
(C.-v e s 7.."*.'.",
T'.2
.., '3-3 D
D 3
AA A
.s i
- *JT.,
- 3. J.
- 75..m.
!. 0,. 9 cc w
a C
.g
- e..
3,.f,
p.
- "I'.*.
- J...
$')
.T'9..m. 'L 1,
3 s
...y
?? *"J 0
- > 7...e..,
- ".3.~*
'P.
4
'."*.).*..*P.3
- -S..*,.
2.y s
..*J
".S.
3.
12 1
- 9
- o..*1
- 7. '. s. y.
.s=..
- =~
- 3.
.7 9
2.)-3
.4
=.=j = 3
.. y
..tV.
it-3.
.4 3
74 a.
3...
I t - 3. a.4
- 3.
.4-1
- = 3,a = s a - *
..SV.
- - 3. a..,
20C L.
~7 - ;.,.,..~.
v
- I*3,.
.9 3-3)=e*--
2.
- .;~3.. *e 2".).**..*'.l S. - 3
.0 9
..g
. 4V.
2 se.
?." q/. 3 C.
s M.*.'..y
"".J. *.
- 2 *
- a.e2
=... ~,....,. 12
- =.3..-~w
~.e s
.w
-.3. -,.1.t..
- c. 1 4....
r,, P. 3
.2....
.f
- - 3, = e.e - ;
lt-3.
..g-*
y
..g-;.
a.
- C1 T.
73..~,
- C 1
A., s c. '. s../.
S......,.-
- ;a.
.e 3..
1..
- a.
- s. _. c, _.,:
.3
- .3.~.'-o 8 3. /.* 3,. *
<* n '. d. e. x... e 4
. 4 r*.~.. ~- se.. i a n
.9. ?.
w
.J.'.'.8.*.2...*'.-
,s
...a,s.*..='...P
.C-
= '., '.i. e. s. '
3
.u
. g. $ 4., 4..
g.
.)
- C.,
5,.
J t
==
.),...e
,..3,...r
".. ". ' *.. * *. 1. 0.
. 5".*.
~ '., P. C. *
..c s.,4..
4
,,A,,.. g. r.., g s
66
-216ja
,3...: n.
r.
13STRLETT LCCATICN 2NSTRUMENT ID NO.
2 Concrel Roem FP-SD-17-1 TP-SD-17-2 TP-SD-17-3 3
Cable Screading Race FP-SD-16-1 FP-SD-16-2 FP-SD-16-3 FP-SD-16-4 TP-SD-16-3 TP-SD-16-6 4
Switchgear Rooms
- C Swi:chgear Rocms FP-SD-15-2 TP-SD-15-3 Cri:ical Sw1:chgear Rcca FP-SD-22-1 F?-SD-22-2 5
ita:1cn 3atte:-r Roems FP-SD-15-1
??-SD-15-4 FP-SD-15-1A
??-SD-15-4 A 6
Diesel Generater Reems FP-SD-10-1
??-SD-10-2 FP-SD-10-3 FP-SD-10-4 CO2-SD-DGl-A CO2-SD-DGi-3 CO2-SD-DGl-C CO2-SD-DGl-D CO2-SD-DG2-A CO2-SD-DG2-3 CO2-SD-DC2-C CO2-SD-DG2-D 7
Diesel Fuel Storage Rooms CO2-TD-DC-1A CO2-TD-DG-13 8
Safety Related Pumos not in Reactor Building RHR Service Water 3 coster Pumps FP-SD-14-3 l
F.mergency Condensace Storage Tanks FP-SD-14-1 Fire Wacer Pumps & Service Water ? umps FP-F3-32-1 l
FP-FV-32-2 9
Aux 111arv Relav Roem & Reace=r ?rocection Svseem Rooms Auxiliary Relay Room
??-SD-15-9 Reac:ct Protec:icn System Roca lA FP-SD-15-7 Reac r Protection System Room 13 FP-SD-15-8 Amendment No.
66
-216k-
D**
'3 T Tacle 3-13 9
cd c
a m
.. 1
.y p e. --. -. g ibe P.5
.w. L 3 4Mi ws
- =...=,
s.
=a. n..4.:.44..,.4..n J
Mose Si:e v.. r.,. 4..- n 1.
Reacter Buildine m..e :. $ :31.ri.ya. ten HV -31 1 1/2".
1./2
.f/..u 6
HV-33 1 1/2" M7 -3 5 I3/I' 9C3 El ev a-icn
..'/.- :
. i/'*
MV -3 3 1 1/2" w/-34 1 I/2*
HV-62 l I/2" 131 Elevatt:n El-!~
I I/2*
HV-57 1 1/2" HV-59 1 1/2" 958 Eleva-icn V/.3 ;
1/2=
V/ 4C 1 1/2*
H'l 42 1 1/2" 975 Eleva:f on MV al 1 1/2*
R/ 45 1 1/.2*
HV-56 1 1/2" HV-58 1 1/2" HV-63 1 1/2"
."C. -.tvation gy.23
- 3./..
- iu
....E5.5 MY aa 1 1/2*
.9/ -45 1
- 1. / e.
2, Cabl e I:Peedt e R:cm gy.j g
) ;j..
3, 00m: uter 3 Cen rei teems gy.; g
- ;j;.
a.
Iwi.chgear Accms i sta:ien ga-ery 40cm D,0, Swit:hgear.iccm and Sta:f:n 3a :ary Rooms g/.17
- . e.
i.
Ia's v 4etated >;m:s ne: in React:r Buil:1ne
---.dF/ i ce,litar :CC C:a." Pam S My.* f
- jj;$
5X
-21 61 -
Amendment No.
, 66
Nh D
.O U
3.1!.-3.19 / '.. i!.-l. 19 3n 5 66 o
Ju Inl
- s 3., /.,..,
e :.. :.. u....,.. 7 5. e. w...s.,....T
..v.
C"'.A.'..'-.'..."
'. e.*
- e ' e. e -..'.-.'..' s --. e~ ~. a....~. e~..s".. e s *.a *. ad eq u a. e
.ag a.. -. e 2, 4 ". '._'.'.,r ' s a ra _d ' 2 ".. e ' - *. e,.. -. d e. a...' -....'.' '. e s.
..'s
.2,-
a'o111:7 is required is c:de :s detect 4:d *.:ca:e fires in 2e1: ea:Ly s:4 g es.
l
? :=p: fe:ac:1:= cf fires v11* reduce de po:e::ial f:: da= age :s saft:,i re'2 ed equi;:e:: a.d is as i=:egral ele =es: i= the everali f act*.i:7 fire ;;o:e::Lon pre ra=.
e s
a a
a
..e
.a.
e e.e..s...... a. s.. _e.
- 4. a.s n s.._
....u.e eve...s.z.
a.,o..o.... c.s
- cable, de es
- ablis'.:e:: cf fregues:
'i..e pa:::is is de adf e::ed a:ess is
.,... a
,a.., p..
- a. 2,.a.,. a.... z, g a.<.a.,r... a a,.,. ; s. g,,
.u._,..
- e..,. a.......a, a
. e... e.. s e.
a.. e.
4
. e
,s.. / *..t.e
- e..s. e. e. w. s. e..e e..1.. e.r e.
.e e
.a w
t a
s s., s e.s...es
..z a.J,..... e
.s a. e
. r= C.s 1 1 =.=..r s
.u.e
. a. e sb...,s a.
a f
yf..
,...e s.. s.e.,s
......a...,
a
... u s...,.,. s s... a.,
- u. a.a a.s a..a.*.*. ' e..
..sa e.>
w....
a
..'a.,;
,,...a._e..s '..
..e;..
- m... e.s a e
.s
..e
.sa a.'.s
... e. e s a.se.;
a._._;,... o sup;;essie: s. s:e= :: sis:s of ce va:a si. s t a=
- n. :24 a: /:: srri:k'.e:3 00 -
z.a.a.,.
se s......s.
...e
.+....e.a.re.a.a.a...a
.. e
.s.a e s...,.,. e s s..
.s
.r s rs:e=s is adequate :: - ' ':e ;c t es:ia'. ia:a;n :: saia:7 : 12:ec equ ;:e:: as:
2..
a.y.sa e
,....e.....
e
,_e.. a._....
..e
.s
.os a _a.s
!= de eves: :ha: ;ce:1:ss of de f tre sup;;ess':: sys:e=s are 13 perable,
.z;.,
1.,,,.g.e.
..e a.
.s a. e...,.,... a.,.,. $3.,,,,, a, e.
,.., _,., u. z..,.., s a..,
v..
...n af f e :ed 4:eas 2::'_1 :.he a.f f ee:sd equi;:e.: ca: he res:::e: :: se:it:e.
- =.
==-
!= de eve:: de fire sup;;essi:: va:e: sys:e= bec :es i: ;erable, i=-
=ediate ::::ect.'ve ressa:es zu.s: be :ake: si::e 21s sys:e= ;;:v. des
-.e a;::
- m. e.....a.
e....
.s
_.e..~.o.g..
- u... u.
a u
s aa a s...,.,.ess.
2.a a a.f a.
. u.,,.1..
.f
. c
.e....
. u. e s, _' s s '..
- ~.~. '. ' e s.' -., ~.~.s.. =.. a.' 22..'... - ' '. e a.: e r..- '. '..'..' -',r r...
- he ::::ee:ive =ca.sures :s ;:: vide adequa:e fire sup;;essi:
- a;a:i".1:7 f : ::e f
c.....4e;.....ec.<,..
.e
.u e.... _ ea,.
- 4..
..w w.
J..,c /..,.c
- .,. ? t.e.SS ~_3
- 3.==.=...5..s... *.I
.e ?r.
- e s aa.' s e_s ".. es ~...
.... g.e s g g e...c..' a
.% e. o
.'.. a.' *. _-. e '..
- . a. s.*.*. e a.., e e e.. a.a....
s i
- . g f g
.,,.,g.,.,.y
.ggg a.,g s......
gp.. a..a..
...a..s j
.c a.,s..n. -... %., g.. s.a_.,;
3..
. e s ' e.' e.a.-~.. e ~' ' -' e s
"...e c s s ' %..'.' '..... ' a s '...' e ' '.. e s
I 4. u e. a c.., _,,.,.
- s. _a,
a a
- desee:i:
4:d ex:inguis..-
- apidly i:v: iring saaretal are.as :f de !aci'.i:7 ;;ic:'
= es.
..'.e fire barrier ;e=e:;2:10 suis are a ;assire ele =e:: i: ::e facili:r
.g= g ;..
.e s.:..'e.-.
,e '
c'. '..sye.- -'..- s.
.s.o.e.,..... e._a
..e
".u '._ g e. '. - d s.~ ' _' _ e
.4.. e
..".e s ea.' s a. a -. '....- '.....'. a ~ ~...'..~.~ us ' '.. e y
.s. e... e... u. e g _s.. z., e. a....u.s.
.a _..,
- a...e g.a.se,..e;,ea., ~..a..
s
..a...
a s. _.
.he sea *. is :as:: red :s !::::i: 21 s;4:.:.s.
I Fire barrier penetration seals include cable penetra: ion barriers,-fire l
doors, and fire dampers.
C
-216m-
~
i r-a.....=.."...
1.?. 66 i
o
(
,,~.n
oo o
9y 6.0 ADMINIS n ATIVE CONTRct.S_
1 l
cc a
6.1 Organi:atien 6.1.1 The Sta:ica Superintenden: shall have :he over-all full:i=e ensi:e responsibili:y for :he safe operatica of :he Cocper Nuclear S:acien.
During periods when the Statica Superintendent is unavailable, he nay delegate his responsibili:y to the Assistant :o S:acien Superin:endent or, in his absence, to one of the Depart =ent Supervisors.
6.1. 2 The por:1:n of the Nebraska ?ublic ?:ver Distric: mnage=ent which' relates to the operacien of :his s:a:1:n is shown in Figure 6.1.1.
i 6.1.3 The organizacien for condue: of opera:ica of :he station is shown in Fig. 6.1.2.
The shif t ce=planen: at :he sca:1:n shall a: all ti=es
=eet :he folleving require =en:s.
No:e: Higher grade licensed opera ors
=ay take :he place of icwer grade licensed or unlicensed operators.
A.
A 11:ensed seni:: reac::: opers::: (SRC) shall be presen: 2:
- he s:2:icn a: all :ines when :hers is any fuel in :he reactor.
3.
A licensed reactor opera::: shall be in the con:rol room a: all ti=es when there is any fuel in :he reac:or.
C.
Two licensed reactor opera: ors shall be in :he c:n::al roca 1
during all ses :up, shu:dewn and other periods involving signif-icant planned centrol : d sanipula:1cns.
A licensed SRO shall e1:her be in the Con:rol Rcen or i=nedia:ely available to :he Control Room during such periods.
s D.
A licensed senior reac:or opera:or (SRO) w1:h no other cencur-rent ducias shall be direc:17 in charge of any refueling opera-tica, or alteration of the reactor core.
A licensed reactor opera:c: (RO) wi:h no other c=ncurrene duties shall be direc:17 in charge of operacions involvi=g the handling of irradia:ed fuel other chan refueling or reactor core al:eracica operatices.
E.
An individual who has been ::ained and qualified in heal:h j
physics :echniques shall be en si:e at all ci=es that fuel is on si:e.
7.
Mini =un crew size duri=g reactor opera:1ca shall censist of
- hree licensed reac:or operacces (ene of whom shall be licensed SRO) and three unlicensed operators. Minimum crew size during reactor cold shuedevn evadi:icas shall censis: of :vo licensed reac:or opera: ors (ene of whom shall be licensed SRO) and one unlicensed operator.
l l
l In the evenc :ha: any===ber of a mini =us shift crew is absent or incapaci:ated due :o illness or injury a qualilled replace-nene shall be designa:ed :o repor: on-s1:e wi:hin two hours.
l Amendment No.
, 66