Other: ML17258A414, ML19246B009, ML19250A369, ML19250A773, ML19250A775, ML19253C848, ML19256E014, ML19256E601, ML19259D337, ML19290C267, ML19309C144, ML19309G864, ML19329F778, ML19330C398, ML19338C429, ML19338G617, ML19338G621, ML19339C823, ML19339D007, ML19340D872, ML19343C482, ML19345G356, ML19351D490, ML19351F917, ML20003C307, ML20003C310, ML20003C413, ML20039D630, ML20039D634, ML20053C136, ML20063M137, ML20070C704, ML20070G223, ML20125B981
|
MONTHYEARML19246B0091979-06-21021 June 1979 Approves Fire Protection Program Developed by Brookhaven & Nrc.Offers Exceptions for NRC Evaluation:Electrical Valve Supervision Should Be Provided on All Valves Controlling Fire Water Sys Project stage: Other ML19259D3421979-09-0606 September 1979 Fire Protection Safety Evaluation Supporting Amends 39 & 33 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML19259D3371979-09-0606 September 1979 Amends 39 & 33 to Licenses DPR-42 & DPR-60,respectively, Adding License Conditions Re Completion of Mods & Implementation of Administrative Control Project stage: Other ML19250A3691979-10-17017 October 1979 Submits Revised Implementation Dates for Fire Protection Mods & Reasons for Delay Project stage: Other ML19250A7751979-10-22022 October 1979 Revised Fire Protection Safe Shutdown Analysis Project stage: Other IR 05000282/19790231979-10-22022 October 1979 IE Insp Repts 50-282/79-23 & 50-306/79-19 on 790917-30.No Noncompliance Noted.Major Areas Inspected:Maint,Security, Review,Audit & Radiation Protection Project stage: Request ML19250A7731979-10-22022 October 1979 Forwards Revised Fire Protection Safe Shutdown Analysis. Rept Supersedes Section 7 of 770311 Fire Hazards Analysis & 770705 Suppl Project stage: Other ML19256E0141979-10-23023 October 1979 Forwards Proprietary Version of Two Sets of Cable Routing Drawings for Review of Fire Protection Safe Shutdown Reanalysis.Drawings Withheld (Ref 10CFR.790) Project stage: Other ML19256E6011979-10-30030 October 1979 Forwards Fire Protection Analyses of Alternate Methods of Spent Fuel Pool Cooling,In Response to Requirements of NRC 790906 Fire Protection Safety Evaluation Project stage: Other ML19253C8481979-11-30030 November 1979 Forwards Evaluation of Electrical & Mechanical Penetration Seals & Fire Detectors Required by 790906 Fire Protection Safety Evaluation Rept Project stage: Other ML20125B9811979-12-26026 December 1979 Forwards Addl Info in Form of Design Details,Test Results Acceptance Criteria in Response to Section 3.1 of NRC 790906 Fire Protection Safety Evaluation to Assure Acceptability of Mod Design.Requests NRC Comment by 800301 Project stage: Other ML19290C2671979-12-31031 December 1979 Forwards Evaluations Required Per 790906 Fire Protection Safety Evaluation Items 3.2.3 & 3.2.7.Addl Info Re Items 3.2.5 & 3.2.6 Will Be Provided When Available.Nrc Comments Re Mods Should Be Sent by 800301 Project stage: Other ML19290C8781980-01-26026 January 1980 Request Assistance in Review of Licensees Proposed Mods to Meet Fire Protection Safety Evaluation Commitments.Schedule for Evaluations Should Be Consistent W/Implementing Mods by 801101 Project stage: Approval ML19309C1441980-03-31031 March 1980 Submits Revised Schedule for Implementing Fire Protection Mods Project stage: Other ML19309G8641980-04-21021 April 1980 Forwards NRC Evaluation of Util 791030,1103 & 1231 Submittals of Design Details & Addl Info to 790906 SER Re Proposed Fire Protection Program.Fire Protection Mod Acceptable.Alternate Shutdown Sys Not Yet Evaluated Project stage: Other ML19338G6211980-06-30030 June 1980 Fire Qualification Test on Retrofit Penetration Seals Project stage: Other ML19329F7781980-07-0808 July 1980 Forwards Response to NRC 800618 Questions Re Safe Shutdown in Event of Fire Project stage: Other ML19330C3881980-07-31031 July 1980 Forwards Application for Amend to App a Tech Specs of Licenses DPR-42 & DPR-60,adding Addl Fire Protection Requirements Project stage: Request ML19330C3931980-07-31031 July 1980 Application for Amend to App a Tech Specs of Licenses DPR-42 & DPR-60,revising Sections 3.14 & 4.16 Re Fire Detection & Protection Sys Project stage: Request ML19330C3981980-07-31031 July 1980 Proposed Tech Specs,Revision Sections 3.14 & 4.16 Re Fire Detection & Protection Sys Project stage: Other ML19338C4291980-08-0808 August 1980 Submits Revised Schedule for Fire Protection Mods. Replacement Nozzles for Booster Hoses Will Be Installed by 801031.Design Change Package for Trenches,Ramps & Curbs Will Be Completed by 801031 Project stage: Other ML19351D4901980-10-0303 October 1980 Requests Extension Until 810101 to Comply W/Nrc 790906 Fire Protection Ser.Mods Will Be Made to Penetration Seal Upgrade,Turbine Bldg Structural Steel Coating,Alternate Shutdown Capability & Addl Fire Dampers Project stage: Other ML19338G6171980-10-24024 October 1980 Forwards Fire Qualification Test on Retrofit Penetration Seals, in Response to NRC Requesting Addl Info Required by Fire Protection Safety Evaluation Project stage: Other ML19339C8231980-10-31031 October 1980 Notifies of Interim Rule Suspending Completion Dates for Fire Protection Mods Previously Approved by Nrc.Fr Notice Encl Project stage: Other ML19345B2861980-11-24024 November 1980 Requests Amend to Licenses DPR-42 & DPR-60 Re Decay Heat Removal Capability.Water Depth Over Irradiated Fuel Tech Spec Changes Also Proposed Project stage: Request ML19340D8721980-11-24024 November 1980 Ltr to All Power Reactor Licensees W/Plants Licensed Prior to 790101.Forwards Fr Notice of Revised 10CFR50.48 & App R Re Fire Protection Features in Nuclear Power Plants Project stage: Other ML19339D0071981-02-0909 February 1981 Requests Extension of Completion Dates for Approved Fire Protection Mods,Per .Specific Items & Estimated Completion Dates Discussed.Schedule for Mods Per Will Be Submitted by 810319 Project stage: Other ML20003C3101981-02-13013 February 1981 Notice of Extension of Completion Dates for Fire Protection Mods Until 811117 Project stage: Other ML19351F9171981-02-13013 February 1981 Forwards License Amend or Approval Class Determination Form & Licensing Fee Payment for Extension Request Re Fire Protection on Mods Implementation Schedule Project stage: Other ML20003C3071981-02-13013 February 1981 Approves Request for Extension of Completion Date for Fire Protection Sys Alternate Water Supply Tank Installation Until 811117.FR Notice Encl Project stage: Other ML20003C4131981-02-13013 February 1981 Approves 810209 Request for Extension of Installation Date of Fire Pump Encl & Related Day Tank Curbing to 810601.FR Notice Encl Project stage: Other NRC Generic Letter 1981-121981-02-20020 February 1981 NRC Generic Letter 1981-012: Fire Protection Rule (45 Fr 76602, November 19, 1980) Project stage: Request ML19345G3561981-03-13013 March 1981 Requests Extension of Schedule Requirements of 10CFR50, Sections 50.48 (c)(2),(c)(3), & (c)(5) Re Completion of App R Fire Protection Mods Project stage: Other ML19343C4821981-03-19019 March 1981 Advises Re Implementation of Fire Protection Mods Not Previously Accepted by Nrc.Evaluation of Emergency Lighting Sys Will Be Completed by 811117.Oil Collection Sys Mods for Reactor Coolant Pump Are Scheduled After 810816 Project stage: Other ML19350C2211981-03-23023 March 1981 Forwards BNL Review of Util Analysis of Alternate Safe Shutdown Capability for Facility,Originally Submitted 791022.Concurs W/Bnl Conclusion That Proposed Mods Do Not Meet NRC Criteria Project stage: Approval ML20008F8431981-05-0404 May 1981 Forwards Revised Security Training & Qualification Plan & Response to NRC Comments on Original Plan.Plan & Response Withheld (Ref 10CFR2.790) Project stage: Request ML19352A7871981-05-27027 May 1981 Provides Status of Fire Protection Safety Evaluation,Item 3.2.6,fire Pump Enclosure.Portions of Work Will Not Be Completed by 810601 as Committed to in 810209 Request for Extension.Work to Be Completed After Labor Settlement Project stage: Request ML20033A4441981-11-16016 November 1981 Requests Relief from Requirements of 10CFR50,App R Re Schedule for Completion of Emergency Lighting Mods.Will Proceed W/Installation of 8-h battery-powered Lighting Units Project stage: Request ML17258A4141981-11-30030 November 1981 Amend 46 to Provisional License DPR-18 Adding Condition to Include Commission Approved Guard Training & Qualification Plan as Part of License Project stage: Other ML20039D6301981-12-18018 December 1981 Forwards Revised Fire Protection Safe Shutdown Analysis Compliance W/10CFR50,App R,Section Iii.G, for Facilities Project stage: Other ML20039D6341981-12-18018 December 1981 Revised Fire Protection Safe Shutdown Analysis:Compliance W/10CFR50,App R, Section Iii.G Project stage: Other ML20052D2141982-04-30030 April 1982 Forwards Followup Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Response Includes Revised Master List & Component Evaluation Sheets & Qualification Info for TMI Action Plan Equipment Project stage: Request ML20053B1051982-05-0404 May 1982 Exemption from Fire Protection Rule Schedular Requirements. Criteria for Evaluating Exemption Requests Encl Project stage: Approval ML20053C1361982-05-20020 May 1982 Requests Mod of Exemption from App R Section III-J Re Emergency Lighting Mods Granted in ,Extending Implementation Date to 9 Months After 820401.Delay Caused by Need to Modify Units to Accept Substitute Battery Project stage: Other ML20063C5451982-08-23023 August 1982 Provides Confirmation of Info Discussed in Earlier Telcons Re Containment Purging & Venting During Normal Operation Project stage: Request ML20063E6481982-08-23023 August 1982 Provides Addl Info in Support of Util 820520 Request for Relief from Schedule for Completion of 10CFR50,App R, Section Iii.J Re Emergency Lighting Mods.Mods Will Be Implemented by 830101 Project stage: Request ML20063M1371982-09-0202 September 1982 Highlights Fire Protection Safe Shutdown Analysis in Compliance W/10CFR50,App R Section Iii.G & Substantive Basis for Exemption Request, Submitted on 820630.Equivalent Protection Issue Clarified to Expedite NRC Review Project stage: Other ML20027C8151982-10-22022 October 1982 Forwards Info Clarifying 820630 Rept, Fire Protection Safe Shutdown Analysis in Compliance W/10CFR50,App R,Section Iii.G & Substantive Basis for Exemption Requests, Per 821001 Meeting W/Nrc Project stage: Meeting ML20070C7041982-12-0606 December 1982 Requests Exemption,Under 10CFR50.48(c)(b),from Automatic Suppression Requirement of App R,Section III.G.3 for Control Room Project stage: Other ML20070G2231982-12-0808 December 1982 Exemption Granting Extension for Installation of Emergency Lighting Until 830101 Project stage: Other 1980-08-08
[Table View] |
Text
.
TEeR-
[,T s '%
UNITED STATES
}
NUCLEAR REGULATORY COMMISSION C
WASHINGTON. D. C. 20555 I'?I[/
5, Novenber 24, 1980 c'
o
.[
Dock et No. 50-298 8
Plant Name: Cooper Nuclear Power Station P;
l4}p
^'
y>
3 p
3
=3 TO ALL POWER REACTOR LICENSEES WITH PLANTS d
5 LICENSED PRIOR TO JANUARY 1,1979 The Comission published on November 19,1980 (45 FR 76602), a revised Section 10 CFR 50.48 and a new Appendix R to 10 CFR 50 regarding fire protection features of nuclear power plants. The revised Section 50.48 and Appendix R will become effective February 17, 1981, which is 90 days after publication.
A copy of the Federal Reaister Notice is enclosed (Enclosure 1).
The provisions of Appendix R that are applicable to the fire protection features of your facility can be divided into two categories.
The first category consists of those provisions of the Appendix that are required to be backfit in their entirety by the new rule, regardless of whether or not alternatives to the specific reouirements of these Sections have been previously approved by the NRC staff. These requirements are set forth in Sections III.G, Fire Protection of Safe Shutdown Capability; III-J, Emergency Lighting; and III-0, Oil Collection Systems for Reactor Coolant Pump. The fire protection features of your f acility must satisfy the specific requirements of these three Sections by the dates established by Paragraph 50.48(c), unless an exemption from the Appendix R requirements is approved by the Commission.
You should note the provisions for tolling the time for completing the modifications required by these three Sections of Appendix R set forth in Paragraph 50.48(c)(6).
The second category of Appendix R provisions applicable to the fire protection I
features of your facility consists of requirements concerning the "open" items of previous NRC staff fire protection reviews of your facility. An open item is defined as a fire protection feature that has not been previously l
approved by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position BTP PCSB 9.5-1, as reflected in a staff fire l
l protection safety evaluation report.
The fire protection features of your f acility that are in this category must satisfy the specific requirements of Appendix R by the dates established by Paragraph 50.48(c), unless an exemp-tion from the Appendix R requirements on those features is approved by the Comi s sion.
f is a summary listing of the open items concerning the fire protection features of your facility based on a review of our records.
Also included is our position on the specific requirements that nust be satisfied in order to resolve these open items.
If you have any questions or disagree-l ments with this enciesure, please advise us within 30 days.of your receipt of l
this letter.
l 8101050 kf t
. November 24, 1980 With regard to the fire protection modifications that have been previously approved by the NRC staff, Paragraph 50.48(d) specifies a new schedule for their cocpletion.
This paragraph, when it becoces effective, will supersede the currently effective section of the regulations that temporarily suspends coroletion dates for previously approved fire protection modifications that are given in facility license conditions (45 FR 71569, October 29,1980).
The Commission expects that all such modifications will be conpleted in accordance with this new schedule, unless an extension has been requested and granted by the Director of the Office of Nuclear Reactor Regulation
[see Paragraph 50.48(d)], or an exeaction has been requested and granted by the Commission pursuant to Section 50.12 of the Commission's regulations.
If you have previously requested extensions of dates for completion of modifications that are required by license conditions for your facility which were not approved, and you have determined that these extensions are still necessary and justifiable, it will be necessary for you to reapply for any such extensions in accordance with the provisions of Paragraph 50.48(d).
All requests for Comnission action resulting from this rule are subject to the schedule of fees specified in 10 CFR 170.21.
If you have any questions concerning the subject matters of this letter, please contact the NRC Project Manager for your facility.
Sincerely, g J { k q < L.-
6b Darrell G. Eisenhut, Director 7
Division of Licensing Office of Nuclear Reactor Regulation
Enclosures:
1.
Notice - Fire Protection Rule 2.
Summary of Staff Recuire-i ments to Resolve Open l
Items l
cc w/ enclosures:
See next page 1
1 l
i l
Mr. J. M. Pilant Nov ember 24, 1980 Nebraska Public Power District
-3 cc:
Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Cooper Nuclear Station ATTN: Mr. L. Lessor Station Superintendent P. O. Box 98 Brownville, Nebraska 68321 Auburn Public Library 118 - 15th Street Auburn, Nebraska 68305
n asc
,(ps
[o, UNITED STATES
- j NUCLEAR REGULATORY COMMISSION y
e WASHINGTON, D. C. 20555
%'....f' November 25, 1980 TO ALL POWER REACTOR LICENSEES WITH PLANTS LICENSED PRIOR TO JANUARY l,1979 The Federal Register Notice enclosed with my letter dated November 24, 1980 has a typographical error in the effective date. The effective date should be February 17, 1981. A correction will be published in the Federal Peoister j
in the near future.
l A
j
_ -ty Darrell G. Eisenhut. Director
(
Division of Licensing l
LANO DUPLICATE DOCUMENT Entire document previously entered into system under:
/
h fh N o.
of pa 2s:
EK
COOPER NUCLEAR POWER STATION
SUMMARY
OF STAFF REQUIREMENTS TO RESOLVE OPEN ITEMS No open items.