Informs of Interim 10CFR50.48 Suspending Completion Dates for Previously Approved Fire Protection Mods.Revised 10CFR50.48 Will Contain Schedules for Completion of All Fire Protection Mods
ML19345C480
Person / Time
Site: Beaver Valley
Issue date: 11/17/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Dunn C
DUQUESNE LIGHT CO.
References
TAC-11111, NUDOCS 8012050197
Download: ML19345C480 (5)


Text

-

~

y

~s

[/**'%[*g UNITED STATES y

ec[ g NUCLEAR REGULATORY COMMISSION

.?

// E WASHINGTON. D C.20555 8-

,,, s-TE[/

November 17, 1980

[l

$g

[

F-j b

c

~

m.

cm w

c.c Docket No. 50-334 f.'y 4-f,ig iC m

"' a

cW' t;;

Qff

=

1 Mr. C. N.. Dunn, Vice President R

g g

~~

Operations Division v

Ducuesne Light Company 4

435 Sixth Avenue pittsburgh Pennsylvania 15219

Dear Mr. Dunn:

As you know, a proposed Section 50.48 and Appendix R to 10 CFR 50 has been pending since May 1980. The Commission has recently approved a revised final version of that proposed Section 50.48 and Appendix R to 10 CFR 3 which will be published in the Federal Recister sho-O and will becoce effective 90 days after publication.

This revised n JFR 50.48 will centain schedules for completion of all fire protection modifications.

One set of schedules will be aoplicable to features covered by Appendix R.

A similar set of schedules will be aoplicable to all other fire protection mcdifications that have been ap; roved by the NRC staff in a staff safety evaluation report. This latter set ci schedules will require completion of. modifications not covered by Ap andix R by schedules specified in the revised rule or by the dates aov specified as license conditions, whichever is sooner, unless an exte :sion or exemption is approved by NRC.

Scme of the comoletion dates discussed in the SER for your facility may be associated with modifications for which the NRC staff required additional inf:rmation, such as design details or test results, to be subsequently reviewed and approved by the

  • RC staf f prior to implementation. To the extent that there are fire protection modifications such as this for your facility and the required additional inforStion has not yet been approved by the staff as evidenced in a staff safety evaluation report, there is no present implementation requirement; consecuently, completion of such items will be governed by the schedules in the revised rule.

In the interim, pending the effective date of the revised rule, the Commission has approved a new Section 50.42 of 10 CFR 50 suspending completion dates for fire protection modifications previously approved by the NRC staff.

This new section became effective upon publication in the Federal Recister on October 29, 1980 (45 FR 71569). A copy of the new rule is enclosed for your information. This rule will be superseded by the revised rule when.

it becomes effective.

6 8 01205u jQ

.-. =.... _ -

fir. C. N. Dunn 2-November 17, 1980 Duquesne Light Company d

In the near future, we plan to contact you to identify specifically which fire protection fea:ures associated with your facility are covered by Appendix R and would thus ba subject to one set of schedules, and whicn are previously approved items which are coverea by a different i

set of schedules.

incerely,

3

' [Y

/

i i

s Darrell G. Eisenhut, Director i

Division cf Licensing

Enclosure:

As stated cc: w/ enclosure:

See next page e

J l

1 1

r i

w

- + -, > -,

g y

m a=me

--w,

~

Mr. C. N. Dunn 3.-

tiovember 17, 1980 Duquesne Light Cogany i

f cc: Gerald Charnoff, Esquire Mr. James A. Werling Jay E. Silberg, Esquire Plant Superintendent Shaw, Pittman, Potts and Trowbridge Beaver Valley Power Station 1800 M Street, N.W.

P. O. Box 4 Washington, D. C.

20036 Shippingport, Pennsylvania 15077 Karin Carter, Esquire Mr. John A. Levin Special Assistant Attorney General Public Utility Comission Bureau of Administrative Enforcement P. O. Box 3265 Sth Floor, Executive House Harrisburg, Pennsylvania 17120 Harrbburg, Pennsylvania 17120 Mr. J. D. Sieber, Superintendent Mr. Roger Tapan of Licensing and Compliance

' Stone and Webster Engineering Duquesne Light Co@any Corporation Post Office Box 4 P. O. Box 2325 Shippingport, Pennsylvania 15077 Boston, Massachusetts 02107 Irwin A. Pocowsky, Esquire Mr. F. Noon Office of Consumer Advocate R & D Center 1425 Strawberry Square Westinghouse Electric Corporation Harrisburg, Pennsylvania 17123 Building 7-303 Pittsburgh, Pennsylvania 15230 Mr. Charles E. Thomas, Esquire Thomas and Thomas B. F. Jones Memorial _ Library 212 Locust Street 663 Franklin Avenue ~

Box 999 Aliquippa, Pennsylvania 15001 Harrisburg, Pennsylvania 17108 Mr. John Carey, Director Resident Inspector Nuclear Operations U. S. Nuclear Regulatory Comission Duquesne Light Company Post Office Box 298 435 Sixth Avenue Shippingport, Pennsylvania 15077 Pitts burgh, Pennsyl vania 15219 Mr. R. E. Martin Duquesne Light Co@any 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Marvin Fein Utility Counsel City of Pittsburgh 313 City-County Building Pittsburgh, Pennsylvania 15219 e

  • Feier:1 Register / Vcl. 45. Nr. 211/ W:dnesday. October 29. isso / Rths anJ Regulaticas 71569 published on October l.1980. 45 FR performs the following spec!}ic earlier anticipated has been regsfres* to 64949. ne corrected i c.91 is published functions:

below.

prepare a final rule on fue p ote=iess.

Although the final rule is near Emcnyt DATt April 18,1980.

. gn on. m.arri ru.4 w.am aos g co=pletien, and wil!Ince. port ta an FeR eveTNER INFOmuAnON CONTACT e,w ocoot m m implementation schedde d.ifen=t from Robert P. De Young. Private Radio that in the proposed rule.it has :Ut Tet been published and in any ere::would

~

An mess: Federal Communications N!1Ct. EAR REGULATORY not be eHudu untD 90 days aft Co==!s sien. Wa shington. D.C. 20554.

WINN publicabon..

Certain NRClicensees.however, an sum tutNTARY INFoRMADON:

O CFR Part 50 '

at present operating underlicense 5

6 the Matter of amendment of Part a condities or 1echnical speciS:atens 13 transfer authority for ce=:non carrier Fire Protection Schedules for thereto which include the Note:r.ner 1 j

1 - matters involvsng public cwst stations Operating Nuclear Power Plants deadhne or other dates which wC,

13 se Private Radio Bureau.

AGENCY:U.S. Nuclear Regulatory precede the efect2ve date of the ba!

Eeleased: August 19,199o.

Co==ission.

rule.To the extent that-these lice =3ees have been unable to comp'ete EU of'the 1.In the Or'/rin the above. captioned Acnox: Final rule.

=atter. FCC 80-179 released April 7

. fire prete: tion measures to which these i

i

-- 1980. Se: tion 0.91 of tne rules was

SUMMARY

The Nudear Re8u!atorv desdines apply, contnued opera ios j

2. a.= ended to reflect a transfer of function Co==ission (NRC)is amending its would violate the license coed.it,=s.

frc= the Co= mon Carrier Bureau to the. ngulaqm to te=prardy suspc" The violation would extend c-Jy rH I

Pdvate Radio Breau (45 F"A;.5399. April ec=pletan schedulu fu censin b the final rule becomes effe:tive, s=ce 5

ggg prote: tion features in operating nuclear the implementation schedde comac.ed E

.Se:ti:n c.91 of the rules was also plants pending co=pleton ofits ongoing b 6 fmd de wiD superude 5

-emended by Order. FCC 7s-as:.

ce prehensive fire protecten incessistent li:ense conditons.

E

. released March 7.1980. to reflect the rule =an g. This suspesien is The Cemmission has deter =i:ed.

E rec.ganization of the Cc=. mon Carner.

=ecessary be:ause sorne NRC li:ensees.. ba.ed upon a nyiew of the entire re==rd 5

g.j, ge,g gg 313,% g,,

g

.. E= eau. nrough badvertence. oc are unable to meet be prote: bon license conditr~e.s is appropriate

?

Crder cf April 7. amended the language I"E ""I*U". dum:nes cutamed in cf the rule p-ior to its having been heensed condittor.s.The Com= ssion pending promulgation of the Ena!rde on E

. fire prote: tion applicable to aC N7.0 5

.. a= ended by ocr Order of March 7.1980 as un a

ep u a sneasu es-licemees.F.stensive fire prote=ia:

E (45 FR.W.SI. March 13.1980).

0Y jf** d fd $t

    • .* #** h * ** "l#** d D""

b

.a o e l6 Y

-3.To c: re: this situation.Section

.,,.g cris a= ended as set forth in the and safety interest would be served by epiemented at an opersting pla=s.Tne g

apa:hed appendix, to amend the forcing certain licensees to shut down implementatien schedule of the E.al

=

cut ently e!!e:tive language of the rule.

dring the brief period between the rule will be uniform and co=prebrsive, g

license condium dudlines and ee

"" *III *PPIII* "U '?'.#.at=g pla::s, 5

Fede al Co==urJeations Commission.

, efectiveness of the final fire protection 8

(se:s. $ s=. 44 stat n. mended. tose. 2casrule.

c a ed li s

'N b A 3031-

.. py.Mic bd6 ad sd@w h 5

Em:nyt oATE: October 29.1980.

M 2: M'ic8***

be served by forcing only those E

  • 2T
  1. ~

FoR FURTHER INFoRMAnoN CONTACT:

ljCenstes unabIe to meet dead'fnee b

William Shields. Office cf Executive preceding the eEectiveness of de Sa3 5

Pa : o of Chapter I of Tit!c 47 of the I.egal Director. U.S. Nuclear Regulatory rule to shut down for the b:ief bie.r:

E Code of Fedetal Regulations is'a= ended Com=ission. Wa shington. D.C. 20553.

To the contrary, the fire pre:e=fo:

E as follows:

phone 301-492-6695.

metsees alteady impleme:ted gin

=

in i c.S1 the introductory textis suPPczutN rART INFoRMAT1oN:On May reasonable assurance that all ope sting E

revised to read as follows:

29.1950 the Commissirin published in '

nudear plants may continue to oprate E

the Federal Register (45 FR 38082) a safely even though the finalrule w I E

I C.91 Funetsons of trie hareau.

Notica of Proposed Rule =aking entitled require additional fi.vprotection E

Le Co men Carrier Bureau

." Fire Protection Program for Nuclear measures at many plants.

E d:velops.re:o== ends and administers Plants Operating Pnor to January 1.

The Administrative Procedure A:1 5

poli:les and programs for the regulation 1979."The preposed rule provided that provides that a rule may be efectin 5

cf services. facilities, rates and practices au fire protection modifications except. upon. publication when that rule "g ants E

cf entitiertercluding public coast alternate or dedicated shutdown stati:ns in de maritime mobile service) capability would be required to be or recognizes an exception er niiens a E

restriction." 5 U.S.C. 553(d)!1). - nir rule 5

wnicn furnish interstate or foreign Implemented by Novemberl.1980.

relieves certain NRClicensees fre:

.E cc,mu.ir.a: ions service for hire-.

.urdess the Co:nmissien approve an license conditions or technical E

whethe ' ywire. radio, cable or satellite extension for good cause.This deadline - spe:1!! cations thereto in re 5

c facilities--and of ancillary operations war also stated in the Commission's protection implementation dead;mes.

E related to the provisions or use of such May::7.1980 Me=orandum and Order and will therefore be effectin cper.the 5

services.The Becau also regulates the on the Union nf Concerned Scientists

---date of publication in the FM E=

rares. te=s.and conditions for cable Petition for Emergency and Remedial -

Register.Furthermore.as noted abeve.

35 te evision a::d pole attachments, where Action.11 NRC 707. 719.

the proposed rule stated that extensio=s

.s4:ch attac' n=en:s are not regulated by a *. Many of the commenters on the from the November 1 deadhe wo-/d be h

5 state and not ; ovided by railroads or proposed rule contended that the censidered for good cause.Exte= sin fcVemmentaliy--or cooperatively November i deadline was unschievable. public comment was received to the EE

=

owned utilities.The Bureau also Moreover. much more time than was effect that the deadline was unrealstic 5

t

E 715f0". Fcderal Register / Vel. 45, No. 211 / W;dnesday. Oct:ber 29.1980 / Ruhs and Regulatiet s

{

E and should be revised. Under,these E

citetenstan:es the Cc==ission believes i-that Gere is good cause for an extension 5

ef the lice.se conditi:n : hedules

==

pend..g efe:tiveness of the finalrule on E

fire prote::i==.

E The rc.le p :vides that all ce=pliance

==

da tes ::::afned in license con 6tions or E

te:isi:41 s;ecifi: tiens for required fire

_=._

p:cte:: ice measures are suspended

~-Z pe: ding further acticn by the Cc==!ssics. As is eleat frc= the above discussi :. that further a ction will be EE._

rte =c!ga:!:: cf the fisa! rule en fire 5

prote:tien.Tae Cc==ission intends that EE licassees a.G::ed by this rule should EE us2 best ef-r:s to co=plete all required EE_

=casures as soc: as possible despite

!EE the suspensio: cf the deadlines for this brief period.

E:5 p ::sua.:t to the Atc=l: Energy Act of

  • EE 1954. as a= ended, the Energy iEE Re::aar.ization Act of1974. as a= ended.
  • 3-and Se:.!:ns Es: and 333 ef Title 5 el the EE Ur.!ted S:a:ss Cede. ::: ice is hereby 5

Five: Sat de foHow-; g a=end=ent to i::

Title 10. Chap:::L Code of Federa!

!EE Regu!ati::s. Par: SC. is published a: a

[f do::=ent sd,ie:: to cod.15catio:.

---E:-

PART 5C-30 MEST10 LICENSING OF EEE pRCOUOT:ON AND UTI'!ZATION E

FA l*:TlES

1. A new Se tics 50.44 is added to read as follows:

{ 50.48 Fire protection senedwies.

Tc de exten: Sat a:y facility's.

i li:e:se c:nditicr.s er te:hnical speci!!:ati:.s in:::p= rate compliance dates f:: c:difl:atiens ne:ersary to prodde fire ;r:te:tien features Z

prep: sed by a li:ensee and a::epted by Se.W.C s:aff as satisfying the p ensi:ns :f A;penix A to Stan:h

.==

Tedr.ical ?:siti:. BU/ APCS 3 G.5-1 and refle::ed in NRC staff Fire P:cte::le: Safety Evaluation Reports

-~

issued p-ic:to Se effective date of this rule. Bose dates are hereby suspended pent.g fu ner a::ics by the

= =

Cc==issic:.

[Sec.1eth. hb. :.a w 53-:02. 68 Stat. 94a: Se:.

201. ht. bw S3-423. a3 Sd:.1:42 [42 UJi C.

i

.201(b).364:1)

~~l Oated at '.'lashington.D.C. this ::th day of 0::cher S&:

For ce.Nvdea: Tsegulate y Commission.

Samuel C. C.Tx.

.se:re:.::y of:he Commissio.

rs w.

- r sse-as aasas.

Br.DesC Coce 75st-en-et cn c, 9

D1 g'ly i

D D

j q

g v h.

..k E-E-E~

_o' Se mee mmerg