Other: ML19208C975, ML19210C110, ML19224D658, ML19256A851, ML19257A287, ML19274D850, ML19323A194, ML19339A586, ML19343C511, ML19345C480, ML19350B962, ML20028C674, ML20028C678, ML20033C783, ML20033C785, ML20033D092, ML20040C345, ML20040D946, ML20040D951, ML20054K130, ML20065T047, ML20071G018, ML20244A473
|
MONTHYEARML20244A4731978-09-29029 September 1978 Forwards Addl Info in Response to 780718 NRC Ltr Re Site Rev Scheduled on Fire Protec Prog on 781105 Project stage: Other IR 05000334/19780301978-12-0101 December 1978 IE Insp Rept 50-334/78-30 on 781031-1103.No Noncompliance Noted.Major Areas Inspected:Fire Protection Program,Piping Supports & Containment Liner Welds Project stage: Request ML20071G0181978-12-11011 December 1978 Forwards Addl Info Requested in 780718 NRC Ltr Re Fire Protec Prog.Subj Covered Incl:Combined Fire & Security Emergency Personnel,Failure Analysis,Suppl Fire Dept, & in-house Audit Plan Project stage: Other ML19256A8511979-01-11011 January 1979 Responds to Re Plant Fire Protection Program. Includes Implementation Schedule Summary.Activities & Mods Will Be Completed During Refueling Outages of 1981 & 82 Project stage: Other ML19274D8501979-02-21021 February 1979 In Response to ,Forwards Suppl Implementation Schedule for Fire Protection Commitments Re Equipment Installation Project stage: Other ML20244A5661979-03-26026 March 1979 Summarizes 790305 Meeting W/Util on Site to Discuss Fire Protection for Facility.Attendance List & Proposed Mods List Encl Project stage: Meeting ML19224D6581979-06-0606 June 1979 Amend 18 to License DPR-66,revising Tech Specs Re safety-related Snubbers,Fire Protection,Chemical Releases & Environ Considerations Project stage: Other ML19224D6561979-06-0606 June 1979 Forwards Amend 18 to License DPR-66,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19208C9751979-08-24024 August 1979 Urges Util to Improve Schedules for Completion of Fire Protection Mods Prior to Oct 1980.Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis Project stage: Other ML19210C1101979-11-0505 November 1979 Notifies of Deviation from 790221 Schedule for Implementation of Fire Protection Sys.Installation of Temporary Fire Detectors in Unit 2 Control Room Area Will Be Completed by 791109 Project stage: Other ML19257A2871979-12-27027 December 1979 Advises of Inability to Comply w/790111 & 0221 Commitment Re Fire Protection Sys Implementation Schedule.Engineering Work More Complex than Anticipated Project stage: Other ML19290C8781980-01-26026 January 1980 Request Assistance in Review of Licensees Proposed Mods to Meet Fire Protection Safety Evaluation Commitments.Schedule for Evaluations Should Be Consistent W/Implementing Mods by 801101 Project stage: Approval ML19260D3991980-01-31031 January 1980 Forwards Design Details for NRC 791231 Fire Protection Safety Evaluation Rept,Items 3.19-1 & 3.19-2.Requirement to File Design Prior to Implementation Was Overlooked Project stage: Request ML19323A1941980-04-0404 April 1980 Advises That 800131 Proposed Design Basis Re Addl Smoke Detectors for Control Room & 1-h Fire Rated Barrier Meet Guidelines & Are Acceptable Project stage: Other ML19336A4661980-10-0101 October 1980 Forwards Mods Required to Resolve Open Items Indicated in 790606 Safety Evaluation Re Fire Protection Project stage: Approval ML19339A5861980-10-30030 October 1980 Forwards Addl Info Re Fire Protection Sys Mods,Per NRC 801001 Request.Oversize Drawings Encl Project stage: Other ML19345C4801980-11-17017 November 1980 Informs of Interim 10CFR50.48 Suspending Completion Dates for Previously Approved Fire Protection Mods.Revised 10CFR50.48 Will Contain Schedules for Completion of All Fire Protection Mods Project stage: Other ML20002D0841980-12-23023 December 1980 Notifies That Util 781211 Commitment to Install Addl Hoses & Hose Stations Is Acceptable for Meeting Concerns Re Item 3.3-7 of Safety Evaluation for Amend 18 to OL Project stage: Approval ML19343C5111981-03-18018 March 1981 Requests,Per 10CFR50.12,extension of Specified Schedule Dates of Newly Enacted Fire Protection Regulations in 10CFR50.48.Extension Not Detrimental to Health & Safety.No Urgent Considerations Mandate Use of App R Requirements Project stage: Other ML19350B9621981-03-18018 March 1981 Submits Plans & Schedules for Sections III-G,III-J & III-O of App R to Fire Protection Requirements Project stage: Other ML19347D5481981-03-18018 March 1981 Forwards 810318 Request for Exemption from App R&10CFR50.48 Schedule Requirements Re Fire Protection Per 10CFR50.12(a) Project stage: Request ML20033D0921981-12-0101 December 1981 Requests Exemption from 10CFR50.48 Schedule Requirements Project stage: Other ML20033C7831981-12-0101 December 1981 Requests Extension of Submittal & Implementation Schedule Dates for Newly Enacted Fire Protection Regulations in 10CFR50.48,per 10CFR50.12.Scheduled Extension Relates to Mods Which May Be Required to Satisfy Section Iii.G Project stage: Other ML20033C7851981-12-0101 December 1981 Forwards Update on Status of Fire Protection App R Sections III-G,III-J & III-O Requirements.Installation of Emergency Lighting Completed W/Exception of Control Room.Control Room Lighting Will Be Installed During Jan 1982 Refueling Outage Project stage: Other ML20040C3451982-01-20020 January 1982 Forwards Update Re Status for Sections III-G,III-J & III-O of App R,Fire Protection Project stage: Other ML20040D9511982-01-20020 January 1982 Requests Extension of Schedule Dates in Paragraph (C) of Fire Protection Regulations in 10CFR50.48,per 10CFR50.12 Project stage: Other ML20040D9461982-01-20020 January 1982 Forwards to HR Denton Requesting Exemption from Scheduler Requirements of 10CFR50.48,per 10CFR50.12(a) Project stage: Other ML20051T6321982-05-0404 May 1982 Exemption from 10CFR50.48(c) Fire Protection Schedular Requirements.No Significant Environ Impact Will Result from License Amend.Clarification of Generic Ltr 81-12 & Criteria for Evaluating Exemption Requests Encl Project stage: Approval ML20054K1301982-06-30030 June 1982 Forwards Fire Protection App R Review,Per 10CFR50.48(c)(5) Requirements & Generic Ltr 81-12.App R Objective of Assuring Safe Shutdown Capability in Event of Fire Can Be Met W/O Full Compliance W/Each Provision of App R Project stage: Other ML20065Q1141982-10-22022 October 1982 Forwards Supplemental Info Per 821014 Discussion Clarifying Exemptions Previously Documented in Fire Protection App R Review,Section 11.2, Reactor Containment & Section 11.6, Primary Auxiliary Bldg Project stage: Supplement ML20065T0471982-10-28028 October 1982 Forwards Description of Alternate Shutdown Procedures Which Will Be Revised Per 821014 Discussions.Procedures to Be Completed After NRC Review of App R & Receipt of Safety Evaluation Project stage: Other ML20079H9221982-12-10010 December 1982 Summarizes 821130 Meeting W/Nrc & Documents Understanding Mutually Agreed Upon Re App R Fire Protection Rule.Finalized Responses to 821118 Questions Encl Project stage: Meeting ML20028C6781983-01-0505 January 1983 SER Re App R to 10CFR50,Items Iii.G & Iii.L.Facility Complies W/Requirement to Provide Alternative Safe Shutdown Capability Contingent Upon Granting of Exemption to 72 H Cold Shutdown Requirement Project stage: Other ML20028C6741983-01-0505 January 1983 Advises That Facility Complies W/Requirements of Sections III.G.3 & Iii.L of App R to 10CFR50 Contingent Upon Granting of Exemption to 72 H Cold Shutdown Requirement.Ser Encl Project stage: Other ML20072H0721983-03-14014 March 1983 Exemption from Requirements of App R to 10CFR50 Re Fire Protection Project stage: Approval ML20072H0891983-03-14014 March 1983 Notice of Exemption from App R to 10CFR50 Re Fire Protection Requirements Project stage: Approval 1980-10-30
[Table View] |
Text
. _ - _ _ _ _. - - _ _
w UNIVED STATES gbi g/
NUCLEAR REGULATORY COMMISSION
- s' t/
WASHINGTON. D. C. 20555
%, *w /j March 26, 1979 MEMORANDUM FOR:
A. Schwencer, Chief, Operating Reactors Branch 1, 00R FROM:
D. L. Wigginton, Project Manager, Operating Reactors Branch 1, D0R
SUBJECT:
SUMMARY
OF MEETING HELD ON MARCH 5, 1979 TO DISCUSS FIRE PROTECTION FOR BEAV VALLEY DOCKET N0. 50 7 g On March 5, 1979, representatives of Duquesne Light Company met with NRC staff at the Beaver Valley Site.
Attachment A lists attendees.
The draft fire protection Safety Evaluation, with special attention to proposed modifications was discussed with the licensee and corrected as appropriate.
Changes and additions were made to the list of scheduled completion dates for proposed modifications.
Attachment B lists proposed modifications.
An explanation was provided of requirements for quarterly training of fire brigade members to maintain proficiency.
The requirement that fire hose stored outside would be hydrostatically tested every 18 months was agreed to by the licensee.
All proposed modifications for the fire protection program are scheduled to be completed by the end of the 1981 refueling outage.
[
D. L. Wigg1 Project Manager, Operating Reactors Branch 1 Attachments:
As stated O
s ATTACHMENT A LIST OF ATTENDEES John Mairacek Duquesne Light Company J. J. Carey Duquesne Light Company H. P. Williams Duquesne Light Company L. E. Wagner Duquesne Light Company N
- n. Tonet Duquesne Light Company Jim Vassello Duquesne Light Company Ingemar B. Asp Gage-Babcock & Associates (NRC Consultant)
R. T. Dodds Team Leader NRC C. H. Brown ATL NRC R. J. Paolina Region I NRC
r, s
Appendix B (con't) 3.19 Control Room-Fire Suppression i
3.19.1-Detection in Verticle Panels June 30, 1979
)
3.19.2 Separation of Kitchen Area December 31, 1979 3.19.3 Portable Extinguishers March 31, 1979 3.20 Hydrogen Lines June 30, 1980 3.21 Battery Room Ventilation December 31, 1979 3.22 Smoke Ejectors December 31, 1979 3.23 Service Building-Intake Structures October 31, 1980 3.24 QA Program September 30, 1980 I
___.___.___m__
~
Attachment B (con't) 3.11 Diesel Generator Rooms July 31, 1980 3.11.1 Drainage System 3.11.2 Oil Line Break 3.11.3 Curbing 3.11.4 Three-hour Fire Door 3.11.5 Fire Rating of Penetration 3.11.6 Sump 011 Level Detection 3.11.7 Manual Actuating Stations 3.12 Control of Unnecessary Combustibles 3.12.1 Flammable Liquids June 30,1979 3.12.2 Fire Retardant Wood December 31, 1579 3.12.3 Trash Containers June 30, 1979 3.12.4 Combustible Waste Storage October 31, 1980 3.12.5 Stai rwells Completed 3.12.6 Procedures December 31, 1979 3.13 Fire Rating of Penetrations and Barriers 3.13.1 Cable Fire Stops-Auxiliary Bldg.
December 31, 1979 3.13.2 Ceiling-Cable Spreading Room Completed 3.13.3 Fire Wall Penetration (Switch /
December 31, 1979 gear Rooms) 3.14 Charging Pump Cubicle December 31, 1979 3.15 Interior Fire Hoses 3.15.1 Booster Hoses July 31, 1980 3.15.2 Testing June 30, 1979 3.16 Gas Cylinder Storage January 31, 1979 3.17 Floor Panel lifter-Process Control Room June 30, 1979 3.18 Cable Spreading Room-Fire Suppression October 31, 1980
ATTACHMENT B IMPLEMENTATION DATES FOR PROPOSED MODIFICATIONS Position Schedule 3.1 Fire Brigade In effect 3.1-1 Training June 30, 1979 3.1-2 Equipment December 31, 1979 3.1-3 Procedures (Pre-fire Plans)
December 31, 1979 3.2 Instrument Air Supply June 31, 1980 3.3 Fire Suppression 3.3-1 Reactor Containment Cable 1981 Refueling Outage Penetration Area 3.3-2 Auxiliary Feedwater System October 31, 1980 3.3-3 Component Cooling Water Pumps October 31, 1980 3.3-4 RHR Pumps 1981 Refueling Outage 3.3-5 Cable Spreading Area October 31, 1980 3.3-6 Cable Tunnel October 31, 1980 3.3-7 Reactor Containment Hose 1981 Refueling Outage Stations 3.4 Exterior Hose Houses December 31, 1979 3.5 Hydrant and Post Indicator Valve Guard Posts October 31, 1980 3.6 Fire System Valve Supervision June 30, 1979 3.7 Exterior Fire Hydrant Inspection June 30, 1979
- 3. 8 Welding, Cutting, Grinding and Open July 31, 1979 Flame Work Procedures I
- 3. 9 Maintenance of Fire Equipment Inventories June 30, 1979 3.10 Turbine Lube Oil Reservoir October 31, 1980 l
_ _ _ _ _ _ _ _ _ _ - _ _ -