Summarizes 790305 Meeting W/Util on Site to Discuss Fire Protection for Facility.Attendance List & Proposed Mods List Encl
ML20244A566
Person / Time
Site: Beaver Valley
Issue date: 03/26/1979
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-11111, TAC-6405, NUDOCS 7904100034
Download: ML20244A566 (5)


Text

. _ - _ _ _ _ . - - _ _

w ,

UNIVED STATES gbi g/ NUCLEAR REGULATORY COMMISSION

s' t/ WASHINGTON. D. C. 20555
  • w /j '

March 26, 1979 MEMORANDUM FOR: A. Schwencer, Chief, Operating Reactors Branch 1, 00R FROM: D. L. Wigginton, Project Manager, Operating Reactors Branch 1, D0R

SUBJECT:

SUMMARY

OF MEETING HELD ON MARCH 5, 1979 TO DISCUSS FIRE PROTECTION FOR BEAV VALLEY DOCKET N0. 50 7 g On March 5, 1979, representatives of Duquesne Light Company met with NRC staff at the Beaver Valley Site. Attachment A lists attendees.

The draft fire protection Safety Evaluation, with special attention to proposed modifications was discussed with the licensee and corrected as appropriate. Changes and additions were made to the list of scheduled completion dates for proposed modifications. Attachment B lists proposed modifications.

An explanation was provided of requirements for quarterly training of fire brigade members to maintain proficiency.

The requirement that fire hose stored outside would be hydrostatically tested every 18 months was agreed to by the licensee.

All proposed modifications for the fire protection program are scheduled to be completed by the end of the 1981 refueling outage.

[D. L. Wigg1 Project Manager, Operating Reactors Branch 1 Attachments:

As stated O

s .

ATTACHMENT A LIST OF ATTENDEES John Mairacek Duquesne Light Company J. J. Carey Duquesne Light Company H. P. Williams Duquesne Light Company L. E. Wagner Duquesne Light Company N n. Tonet Duquesne Light Company Jim Vassello Duquesne Light Company Ingemar B. Asp Gage-Babcock & Associates (NRC Consultant)

R. T. Dodds Team Leader NRC C. H. Brown ATL NRC R. J. Paolina Region I NRC

r, s :#-

Appendix B (con't) 3.19 Control Room-Fire Suppression i 3.19.1- Detection in Verticle Panels June 30, 1979 )

3.19.2 Separation of Kitchen Area December 31, 1979 3.19.3 Portable Extinguishers March 31, 1979 3.20 Hydrogen Lines June 30, 1980 3.21 Battery Room Ventilation December 31, 1979 3.22 Smoke Ejectors December 31, 1979 3.23 Service Building-Intake Structures October 31, 1980 3.24 QA Program September 30, 1980 I

___.___.___m__ __________-- _---- -

' ~

Attachment B (con't) 3.11 Diesel Generator Rooms July 31, 1980 3.11.1 Drainage System 3.11.2 Oil Line Break 3.11.3 Curbing 3.11.4 Three-hour Fire Door 3.11.5 Fire Rating of Penetration 3.11.6 Sump 011 Level Detection 3.11.7 Manual Actuating Stations 3.12 Control of Unnecessary Combustibles 3.12.1 Flammable Liquids June 30 ,1979 3.12.2 Fire Retardant Wood December 31, 1579 3.12.3 Trash Containers June 30, 1979 3.12.4 Combustible Waste Storage October 31, 1980 3.12.5 Stai rwells Completed 3.12.6 Procedures December 31, 1979 3.13 Fire Rating of Penetrations and Barriers 3.13.1 Cable Fire Stops-Auxiliary Bldg. December 31, 1979 3.13.2 Ceiling-Cable Spreading Room Completed 3.13.3 Fire Wall Penetration (Switch / December 31, 1979 gear Rooms) 3.14 Charging Pump Cubicle December 31, 1979 3.15 Interior Fire Hoses 3.15.1 Booster Hoses July 31, 1980 3.15.2 Testing June 30, 1979 3.16 Gas Cylinder Storage January 31, 1979 3.17 Floor Panel lifter-Process Control Room June 30, 1979 3.18 Cable Spreading Room-Fire Suppression October 31, 1980

ATTACHMENT B IMPLEMENTATION DATES FOR PROPOSED MODIFICATIONS Position Schedule 3.1 Fire Brigade In effect 3.1-1 Training June 30, 1979 3.1-2 Equipment December 31, 1979 December 31, 1979 3.1-3 Procedures (Pre-fire Plans) 3.2 Instrument Air Supply June 31, 1980 3.3 Fire Suppression 3.3-1 Reactor Containment Cable 1981 Refueling Outage Penetration Area 3.3-2 Auxiliary Feedwater System October 31, 1980 3.3-3 Component Cooling Water Pumps October 31, 1980 3.3-4 RHR Pumps 1981 Refueling Outage 3.3-5 Cable Spreading Area October 31, 1980 3.3-6 Cable Tunnel October 31, 1980 3.3-7 Reactor Containment Hose 1981 Refueling Outage Stations 3.4 Exterior Hose Houses December 31, 1979 3.5 Hydrant and Post Indicator Valve Guard Posts October 31, 1980 3.6 Fire System Valve Supervision June 30, 1979  ;

3.7 Exterior Fire Hydrant Inspection June 30, 1979

3. 8 Welding, Cutting, Grinding and Open July 31, 1979 Flame Work Procedures I
3. 9 Maintenance of Fire Equipment Inventories June 30, 1979 3.10 Turbine Lube Oil Reservoir October 31, 1980 l

_ _ _ _ _ _ _ _ _ _ - _ _ -