Interim Deficiency Rept Re Failure of Type L2 Auxiliary Switch Assembly in 4.16 Kv Switchgear.Switch Assembly Returned to Equipment Supplier,Gould Electric Sys,For Analysis.Resolution Expected by 800228
ML19290B686
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 11/01/1979
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-79-120, NUDOCS 7912130524
Download: ML19290B686 (1)


Text

.

j MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O . B O X 164 0. J A C K S C N MIS SIS SIP PI 39205 e.

P4CDUCTION OC8&MTMENT Office of Inspection and Enforcement November 1, 1979 U. S. Nuclear Regulatory Cocnission Region II 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303 ATTENTION: Mr. J. P. O Reilly, Director Gentlemen: *

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/0498/15525 Interim Report for Potential Reportable Deficiency No. 79-06 as Defined in 10 CFR 50.55(e)

AECM-79/120 On March 2, 1979, Mr. J. K. Rausch of your office was notified of a potential reportable deficiency at the Grand Gulf Nuclear Station con-struction site concerning the failure of a Type L2 Auxiliary Switch As-sembly installed in the 4.16 KV switchgear.

The failed switch assembly and a switch assembly with a crack in the end molding were returned to the equipment supplier, Gould Electric Systems Group, for analysis. The equipment supplier's analysis for Unit I switch-gear and our examination of the Unit 2 switchgear have not been completed.

We now estimate that the question of reportability will be resolved by February 28, 1980.

Yours truly,

.n 'c en

/ L. F. Dale

[ Nuclear Project Manager JRF/JDR:mic cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner 3O/7 Mr. Victor Stello, Jr., Director s2

  • Division of Inspection & Enforcement U. S. Nuclear Regulatory Cornission /!C Washington, D. C. 20555 1553 327 Pic.qq]
u. .

Member Middle South Utilities System 7912130 g2p