ML19219A076
ML19219A076 | |
Person / Time | |
---|---|
Issue date: | 08/02/2019 |
From: | NRC/OCIO |
To: | |
Shared Package | |
ML19219A087 | List: |
References | |
FOIA, NRC-2017-000292 | |
Download: ML19219A076 (93) | |
Text
From: Spencer, M ichael Sent: Thursday. June 23. 2016 11:18 AM To: Scarbrough, Thomas; Holahan. Gary; West, Steven; Clark, Theresa
Subject:
RE: Backfit Appeal Panel I am available any time this afternoon (including 3 PM) and Monday at 3 PM.
From: Scarbrough, Thomas Sent: Thursday, June 23, 2016 11:11 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
RE: Backfit Appeal Panel I am available today at 3 pm , but I am not available Monday afternoon.
Thanks.
Tom From: Holahan, Gary Sent: Thursday, June 23, 2016 11:01 AM To: Spencer, Michael <Michael.Spencer@nrc.gov>; West, Steven <~teve11.Wesl@!!.rc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Clark, Theresa <!'heresa.Clark@nrc.gov>
Subject:
RE: Backfit Appeal Panel Does 2pm or 3pm Monday work better for panel members?
I can be available for either.
Gary From: Spencer, Michael Sent: Thursday, June 23, 2016 10:59 AM To: Holahan, Gary <Garv.Ho lahan@nrc.gov>
Subject:
RE: Backfit Appeal Panel Gary, I have a conflict. I have been asked to attend another meeting on Monday from 1 to 2:30. Is another time available on Monday?
Michael
Original Appointment---**
From: Holahan, Gary
Sent: Thursday, June 23, 2016 10:57 AM To: West, Steven; Spencer, Michael; Scarbrough, Thomas; Clark, Theresa
Subject:
Backfit Appeal Panel When: Monday, June 27, 20161:00 PM-2:00 PM (UTC-05:00) Eastern Time (US & Canada).
Where: O 17 H 14 2
Subject:
Backfit Appeal Panel Location: 0 17 H 14 Start: Thu 06/23/ 2016 3:00 PM End: Thu 06/23/ 2016 4:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Holahan, Gary Required Attendees: West, Steven; Spencer, M ichael; Scarbrough, Thomas; Clark, Theresa
From: HOLAHAN, GARY M Sent: Friday, June 24. 2016 11:11 AM To: CLARK, THERESA V; WEST, Steven S; SCARBROUGH, THOMAS G; SPENCER, MICHAEL A
Subject:
Re: backfit appeal panel Thanks Theresa, I need to he out of the office 7/7 and 7/8 so one meeting the week of July 4 is Ok.
Gary On: 24 June 2016 11 :04, "CLARK, THERESA V <Theresa.Clark@nrc.gov> wrote:
Note that Tom is !<b)(6) !but others appear to be OK for this one.
[FYI didn't schedule for 7/7 as there wasn't a good time for all.I
Subject:
Backfit Panel Meeting Location: 017 H 14 Start: Tue 06/ 28/ 2016 3:00 PM End: Tue 06/28/ 2016 4:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Holahan, Gary Required Attendees: West, Steven; Scarbrough, Thomas; Spencer, Michael; Clark, Theresa
Subject:
backfit appeal panel location: 0-16B2 Start: Thu 06/30/ 2016 10:00 AM End: Thu 06/30/2016 11:00 AM Recurrence: (none)
Meeting Status: Accepted Organizer: CLARK, THERESA V Required Attendees: HOLAHAN, GARY M; WEST, Steven S; SCARBROUGH, THOMAS G; SPENCER, MICHAE L A This time looked OK if Steve can get out of his standing meeting. Pl ease note thal the room labeling is messed up right now, but I have 0 -1602 reserved (I think) as noted in the subject line.
- Thanks, Theresa
From: Scarbrough, Thomas Sent: Thursday, July 07, 2016 9:57 AM To: Holahan, Gary; West. Steven; Clark, Theresa; Spencer, Michael
Subject:
RE: Memorandum From: V. McCree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GDC 15, GDC 21, GDC 29, and the Licensing Basis OK with me.
Thanks.
Tom From: Holahan, Gary Sent: Thursday, July 07, 2016 9:55 AM To: West, St even <Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject; Fwd: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(6), GDC 15, GDC 21, GDC 29, and t he Licensing Basis How about inviting Rich to a panel meeting next week?
Gary From: "West, Steven" <Stevcn.West@nrc.gov>
Subject:
RE: Memorandum From: V. McCree to G. Holahan re; Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), G DC 15. GDC 21 , GDC 29, and the Licensing Basis Date: 07 July 2016 09: 12 To: "Correia, Richard" <Richard.Corrcia(d ,nrc.gov>
Cc: "Holahan, Gary" <Gary.HolahanC<"Z:nrc.gov>
The appeal panel is still in the discovery p hase. It's h ighly likely that we'll a sk for RES assistance as summarized in my original email, below, but we are not quite ready yet.
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrcgov
From: Correia, Richard Sent: Thursday, July 07, 2016 7:07 AM To: West, Steven <Steven.West@nrc.gov>
Subject:
RE: Memorandum From: V. McCree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GDC 15, GDC 21, GDC 29, and the Licensing Basis Good morning Steve.
Any updates on this appeal and whether you still want our technical assistance?
Best Richard P. Correia, P.r..
Diredor, Oivisio11 o! Risk Analysis Office of l\iuclcar Reenlatory Research U.S. '.'IRC From: Correia, Richard Sent: Friday, June 24, 2016 6:38 AM To: West, Steven <Steven.West@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; Case, Michael
<Michael.Case@nrc.gov>; Webber, Kimberly <Kimberly.Webber@nrc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>;
Hackett, Edwin <Edwin.Hackett@nrc.gov>
Subject:
RE: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GOC 15, GOC 21, GDC 29, and the Licensing Basis
- Steve, We will be ready to support your request and look forward to working with you and Gary on this matter.
Best Richard P. Correia, P.E.
Director, Division of Risk AnahJsis OHico al :"J°udear Roaula tonJ Research U.S.NRC From: West, Steven Sent: Thursday, June 23, 2016 6:13 PM To: Correia, Richard <Richard.Correia@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; Case, Michael
<Michael.Case@nrc.gov>; Webber, Kimberly <Kimberly.Webber@nrc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>
2
Subject:
FW: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(0), GDC 15, GDC 21, GDC 29, and the Licensing Basis
- Rich, Following (and attached) is the information on the backfit appeal I am working on. I appreciate your commitment to support the panel's effort to better understand and characterize the safety and risk significance of the plant configuration. Gary Holahan or I will be in touch after we gather our thoughts and have a better idea about specific objectives and needs. As I mentioned to you. we will probably be looking for some transient analyses and risk assessments (using SPAR models).
Steve Steven West. Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven. West@nrc.gov From: Holahan, Gary Sent: Thursday, June 23, 2016 10:44 AM To: West, Steven <5teven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Spencer, Michael
<Michael.Spencer@nrc.gov>
Cc: Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
FW: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GDC 15, GDC 21. GDC 29, and the Licensing Basis
- Steve, Tom,
- Michael, As you can see, the EDO has signed the Backfit Appeal Panel Charter. It calls for a final report and recommendation by August 29. 2016. Although t do not expect this task to require anyone's dedicated. full-time attention, I do plan to meet frequently, especially during the planning stage. I suggest meeting this afternoon (3 pm?) or on Monday and Wednesday next week. I suggest that we establishing a regular pattern of meetings for the following weeks. There will also be the need to schedule meetings/discussions with NRR staff and management, Exelon. perhaps NEI (which sent a supporting letter last week). other stakeholders. and perhaps CRGR.
I have identified more than 20 relevant documents (electronic copies of a few attached, including a list of all);
and I am having paper copies made. Copies should be available on Monday. The most immediately relevant documents are: the charter, the Exelon appeal letters of 12/8/15 (to NRR) and 6/2/16 (to EDO), and the staff letter of 5/3/16. I have identified numerous issues that I think we may need to pursue, but that can wait for our first meeting.
I will send scheduler requests to check your availability today and next week.
Thanks in advance for your support, Gary 3
From: Royer, Deanna Sent: Thursday, June 23, 2016 10:01 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Cc: AidsNroMailCenter Resource <RidsNroMailCenter.Resource@nrc.gov>; RidsNrrOd Resource
<RidsN rrOd.Resource@nrc.gov>; RidsRgn3 Ma ilCenter Resource <RidsRgn3Ma ilCenter.Resource@nrc.gov>;
RidsOgcMailCenter Resource <RidsOgcMailCenter.Resource@nrc.gov>; RidsEdoMailCenter Resource
<RidsEdoMailCenter.Resource@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
Memorandum from: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR S0.34(B), GDC 15, GDC 21. GDC 29, and the Licensing Basis Dated: J unc 22, 2016 From: V. \1cCrec Publicly Available in ADAMS View ADA\lfS P8 J>ropt=rties MLI 6 I 73A3 I!
Open ADA\lfS P8 Docui:ncnt (Charter fo r Backlit Appeal Review P,~ncl Associated With Byron and Braidwood Compl_ian_<;:c with 10_CFR 50.34<8}, GDC 15, GD(.21., GDC 29, and the Liccn_sing Basis)
- Thanks, Deanna Royl!r Administrative /\ssistanl lo Fred M:illcr, Al!ting Dirl!.;tor Samuel I.cc, Acting Deputy Dirc-.:tor Division of Program M:anu~cmcnt.
Pohl!)' Development and Analysis (301)415-1207 T-06/1-" 11 Mailstop: T-06/Fl 5 4
From: Holahan, Gary Sent: Thursday, July 07, 2016 12:40 PM To: Clark. Theresa; West. Steven; Scarbrough, Thomas; Spencer, Michael
Subject:
Re: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(9), GDC 15, GDC 21. GDC 29. and the Licensing Basis Thanks, Steve and Theresa On: 07 July 2016 l 0: 19. "Clark. Theresa" <Theresa.Clark(!."iJnrc.gov> wrote:
I'll add him to the appointment later today. Thanks!
On: 07 July20l6 l0:1 8, "West. Steven" <Steven.West(£i nrc.gm*> wrote:
- Gary, I am on travel next week. but suggest you invite Rich. even if it is for a preliminary discussion about what the panel is dealing with and the type and level of support we might need to complete our review. This would allow Rich to develop a feel for the RES resources and time needed. Also, our request to RES may also require coordination with/assistance for Mike Case*s division. Rich can help with this as well.
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov From: Holahan, Gary Sent: Thursday, July 07, 2016 9:55 AM To: West. Steven <Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
Fwd: Memorandum From: V. M ccree t o G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(9), GOC 15, GOC 21, GOC 29, and the Licensing Basis How about inviting Rich to a panel meeting next week'?
Gary
From: "West, Steven" <Stevcn.West@nrc.gov>
Subject:
RE: Memorandum From: V. McCrce to G. Holahan re: Charter for Back fit Appeal Review Panel Associated with Byron and Braidwood Compliance with IO CFR S0.34(B), GDC 15, GDC 21, GDC 29, and the Licensing Basis Date: 07 July 2016 09: 12 To: "Correia. Richard <Richard.Correia(c,. nrc.gov>
Cc: "Holahan, Gary" <Gary.Holahan(t'l'nrc.gov>
The appeal panel is still in the discovery phase. It's highly likely that we'll ask for RES assistance as summarized in my original email, below. but we are not quite ready yet.
Steve Steven West. Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov From: Correia, Richard Sent: Thursday, July 07, 2016 7:07 AM To: West, Steven <Steven.West@nrc.gov>
Subject:
RE: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(B), GDC 15, GDC 21, GDC 29, and the Licensing Basis Good morning Steve, Any updates on this appeal and whether you still want our technical assistance?
Best Richard P. Correia, P.E..
Director, Division oi Risk Analqsis OHiceol Nuclear Resulatory Research U.S.NRC From: Correia, Richard Sent: Friday, June 24, 2016 6:38 AM To: West, Steven <Steven.West@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; Case, Michael
<Michael.Case@nrc.gov>; Webber, Kimberly <Kimberly.Webber@nrc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>;
Hackett, Edwin <Edwin.Hackett@nrc.gov>
Subject:
RE: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(0), GDC 15, GDC 21, GDC 29, and the Licensing Basis 2
- Steve, Tom,
- Michael, As you can see. the EDO has signed the Backfit Appeal Panel Charter. It calls for a final report and recommendation by August 29, 2016. Although I do not expect this task to require anyone*s dedicated, full-time attention, l do plan to meet frequently, especially during the planning stage. I suggest meeting this afternoon (3 pm?) or on Monday and Wednesday next week. I suggest that we establishing a regular pattern of meetings for the following weeks. There will also be the need to schedule meetings/discussions with NRR staff and managemen1, Exelon , perhaps NEI (which sent a supporting letter last week), other stakeholders, and perhaps CRGR.
I have identified more than 20 relevant documents {electronic copies of a few attached, including a list of all):
and I am having paper copies made. Copies should be available on Monday. The most immediately relevant documents are: the charter, the Exelon appeal letters of 12/8/ 15 (to NRR ) and 6/2/16 (to EDO), and the staff letter of 5/3/16. I have identified numerous issues that I think we may need to pursue, but that can wait for our first meeting.
I will send scheduler requests to check your availability today and next week.
Thanks in advance for your support.
Gary From: Royer, Deanna Sent: Thursday, June 23, 2016 10:01 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spence r@nrc.gov>
Cc: RidsNroMailCenter Resource <RidsNroMailCenter.Resource@nrc.gov>; RidsNrrOd Resource
<RidsNrrOd.Resource@nrc.gov>; RidsRgn3Mai1Center Resource <Rid sRgn3Mai1Center.Resource@nrc.gov>;
RidsOgcMailCent er Resource <RidsOgcMai1Center.Resource@nrc.gov>; RidsEdoMailCenter Resource
<RidsEdoMailCenter.Resource@nrc.gov>; Clark. Theresa <Theresa.Clark@nrc.gov>
Subject:
Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GDC 15, GDC 21, GDC 29, and the Licensing Basis Dated: June 22. 2016 From: V. Mccree E Available in ADAMS View AQA\1S P8 Properties MU 6 I 73A3 I I Qpcn ADA\1S J>8 Document (Ch.irter for Back fit Appeal Review P~mcl Assodatt:d _Wi t.h Byron and Braidwood Compliance _with 10 C FR 50.34(8). GDC 15. GDC 21, Gl)C ;!.9. and the Licensi.ng Basis)
Thanks.
Deann.i Royer Administrntive Assistant to Fred Miller. Acting Director Samuel Lee, Acting Deputy Director Division of Program Management.
Policy Development and Analysis 4
- Steve, We will be ready to support your request and look forward to working with you and Gary on this matter.
Best Richard P. Correia, P.E Director, Division al Risk Ana.hJsis OHice 0£ Nuclear RegulatonJ Research U.S.NRC From: West, Steven Sent: Thursday, June 23, 2016 6:13 PM To: Correia, Richard <Richard.Correia@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; Case, Michael
<Michael.Case@nrc.gov>; Webber, Kimberly <Kimberly.Webber@nrc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>
Subject:
FW: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GOC 15, GOC 21, GDC 29, and the licensing Basis
- Rich, Following (and attached) is the information on the backfit appeal I am working on. I appreciate your commitment to support the panel's effort to better understand and characterize the safety and risk significance of the plant configuration. Gary Holahan or I will be in touch after we gather our thoughts and have a better idea about specific objectives and needs. As I mentioned to you, we will probably be looking for some transient analyses and risk assessments (using SPAR models).
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov From: Holahan, Gary Sent: Thursday, June 23, 2016 10:44 AM To: West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Sea rbrough@nre.gov>; Spencer, Michael
<M ichael.Spencer@nrc.gov>
Cc: Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
FW: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8). GDC 15, GDC 21, GDC 29, and the Licensing Basis 3
(301) 415-1207 T-06/Fll Mailstop: T-06/FI5 5
Subject:
backfit appeal panel Location: 0 -16B6 Start: Tue 07/ 12/2016 1:00 PM End: Tue 07/12/ 2016 2:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: CLARK, THERESA V Required Attendees: HOLAHAN. GARY M; WEST. Steven S; SCARBROUGH, THOMAS G; SPENCER, MICHAEL A Note that Tom is~ , but others appear to be OK for this one.
[FYI didn't schedule for 7/7 as there wasn't a good lime for alLJ
From: Correia, Richard Sent: Thursday, July 07, 2016 12:42 PM To: Clark, Theresa; Holahan, Gary; West. Steven; Scarbrough, Thomas: Spencer, Michael
Subject:
RE: backfit appeal panel Don't worry about my schedule Theresa. I can easily adjust.
Richard P. Correia., P.E.
Director, Division o1 Risk AuahJsis OHice ol Nuclear Reeulatory Research U.S.NRC
Original Appointment-----
From: Clark, Theresa Sent: Thursday, July 07, 201612:18 PM To: Holahan, Gary; West, Steven; Scarbrough, Thomas; Spencer, M ichael; Correia, Richard
Subject:
backfit appeal panel When: Thursday, July 14, 2016 10:30 AM-11:30 AM (UTC-05:00) Eastern Time [US & Canada).
Where: 0 -1662 Note that Steve will be on travel, but looks good for the rest. I shifted by half an hour so that Rich can join us for the second part (I think he has a meeting till 11).
From: Holahan, Gary Sent: Wednesday, July 13, 2016 7:37 AM To: Clark, Theresa; West, Steven Cc: Scarbrough. Thomas; Spencer. Michael
Subject:
RE: CRGR Time Slot With CRGR members only. We will talk to NRR separately. Best not to get involved in the normal CRGR business with NRR on a specific issue.
Gary From: Clark, Theresa Sent: Tuesday, July 12, 2016 6:27 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>
Cc: Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
Re: CRGR Time Slot M eeting is with CRGR only or with the staff who would have come to talk about the RIS? I got confused by the "the staff" below. Either is probably fine (and both may be needed eventually) but different topics.
On: 12 July 2016 18:19, "Holahan, Gary" <Gary.Holahan@nrc.gov> wrote:
Yes, I think it would be good to keep CRGR informed of our efforts and early insights.
Gary From: West, Steven Sent: Tuesday, July 12, 2016 6:13 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>
Subject:
Fwd: CRGR Time Slot
- Gary, Want to meet with the staff?
Steve
Original Message --------
From: "Hackett, Edwin" <Edwin.H~ckett~nrc.qov>
Date: Tue, July 12, 2016 1 :45 PM -0500 To: "West, Steven" <~teven.West(a:n~c..9.QY>
CC: "Cupidon, Les" < Les.Cupidon@nrc.gov>, "Difrancesco, Nicholas" <t.Jicholas.DiFrancesco@nrc.gov>
Subject:
CRGR Time Slot Hi Steve,
Per your previous email, are you and Gary still potentially interested in using the time slot we originally reserved for the CRGR meeting on Rev. 1 of RIS-2005-29? (July 21, 3-5 p.m.)
Ed From: West, Steven Sent: Thursday, June 23, 2016 6:00 PM To: Hackett, Edwin <Edwin.Hackett@nrc.gov>; DiFrancesco, Nicholas <Nicholas.DiFrancesco@nrc.gov>
Cc: Cupidon, Les <Les.Cupidon@nrc.gov>; Moore, Scott <Scott.Moore@nrc.gov>; McDermott, Brian
<Brian.McDermott@nrc.gov>; Williamson, Edward <Edward.Williamson@nrc.gov>; Ordaz, Vanna
<Vonn~.Ordaz@nrc.gov>; Munday, Joel <Joel.Munday@nrc.gov>; Wert, Leonard <Leof!ard.Wert@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
RE: FYI* Backfit Panel Being Formed by OEDO Importance: High Ed, If you haven't heard, l also "volunteered" to serve on the backfit appeal panel. I did not weigh in on your question about the CRGR meeting with the staff pending the appeal panel's kickoff meeting. We met this afternoon.
The panel will also be reviewing the proposed revision to the RIS_ During our kickoff meeting, among other things, we discussed coordination of the paners review with CRGRs review. In the short time available, we did not decide on any specific course of action. but agree that it was worthy of further discussion. Before you change the CRGR's plans or cancel you meeting with the staff, I suggest you touch base with Gary and perhaps, if Gary agrees, come to one of our panel meetings to discuss with the entire appeal panel. One idea floated was that the appeal panel could take the CRGR's time slot with the staff.
Steve Steven West. Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov Edwin M Hackett Deputy Director, Office of Nuclear Regulatory Research U5NRC 301-415-1904 edwin.hackett@nrc.qov 2
Subject:
backfit appeal panel Location: 0- 1602 Start: Thu 07/ 14/2016 10:30 AM End: Thu 07/ 14/2016 11:30 AM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark, Theresa Required Attendees: HOLAHAN, GARY M; WEST, Steven S; SCARBROUGH, THOMAS G; SPENCER, MICHAEL A; Correia, Richard Note that Steve will be on travel. but looks good for the rest. I shifted by half an hour so that Rich can join us for the second part (I think he has a meeting till 11).
Subject:
Exelon backfit discussion Location: HQ-OWFN-16806-12p Start: Mon 07/18/ 2016 12:30 PM End: Mon 07/ 18/2016 1:30 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark, Theresa Required Attendees: McGinty, Tim; DSSCAL Resource; Holahan, Gary; West, Steven; Scarbrough, Thomas; Spencer, Michael Hi Tim, Thanks for being willing to meet with the EOO' s appeal panel for the Exelon backfit. As we discussed on the phone, you can bring staff if you would like to. However, you may not feel the need at this point-we are intending for this to be a casual conversation about the technical issues that led to the backfit and aren' t sending any preparatory materials/questions. If we need further discussions (e.g., with particular staff) after this we can certainly do that.
Also-I know this isn't a great time (and Steve has a potential conflict) bu t getting another time in the next two weeks was nigh on impossible. Let me know if it is really bad timing for you. Thanks!
Background
References:
- Appeal panel charter: ML16173A311
- 6/16/16 NEI letter supporting Exelon backfit appeal to EOO: [attached, not yet in ADAMS) 2d item is ML16208A008, which
- 6/2/16 Exelon backfit appeal to EDO: ML161S4A2S4 is publicly available in ADAMS
- 5/3/16 NRR backfit appeal decision: ML1609SA204
- 12/8/2015 Exelon backfit appeal to NRR: ML1S342A112
- 10/9/2015 NRC backfit letter: ML1422SA871
- 8/26/04 pressurizer safety valve setpoint safety evaluation: ML0422S0531
- 5/4/01 stretch power uprate safety evaluation: M L033040016 All documents listed are publicly available in ADAMS 1
From: Spencer. Michael Sent: Monday. July 18, 2016 2:42 PM To: West. Steven
Subject:
Thursday Backfit Panel M eeting Steve, you mentioned a meeting on Thursday, but no such meeting is on my calendar. If the Thursday meeting is for the backfit panel, could you forward that to me?
Michael
Subject:
Exelon backfit appeal w/ GSM Location: EOO-OWFN-16B02-12p Start: Tue 07/ 19/ 2016 1:00 PM End: Tue 07/ 19/2016 2:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark, Theresa Required Attendees: HOLAHAN, GARY M; SCARBROUGH, THOMAS G; WEST, Steven S; SPENCER, MICHAEL A; Mizuno, Geary Good morning!
As discussed between Margie and Gary, the backf it appeal panel for the Byron/ Braidwood PSV/PORV backflt would like to discuss the initial backfit review process with Geary Mizuno. This looks like the only t ime in the near-term that will work for most. (Steve, I know you have a meeting but am hoping you might be able to reschedule or have Brian cover it.)
I don't believe any prep/ questions/ materials are needed Oust a chat) but others on the panel can correct me.
- Thanks, Theresa 1
From: Clark, Theresa Sent: Thursday, July 14, 2016 4:58 PM To: Holahan, Gary; West. Steven; Scarbrough, Thomas; Spencer. Michael
Subject:
RE: Meeting with NRR agree From: Holahan, Gary Sent: Thursday, July 14, 2016 4:57 PM To: Clark, Theresa <Theresa.Clark@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: Meeting with NRR No, that might look too demanding ...
From: Clark, Theresa Sent: Thursday, July 14, 2016 4:55 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: Meeting with NRR Thanks, do you want me to include them in the appointment / share with him?
From: Holahan, Gary Sent: Thursday, July 14, 2016 4:52 PM To: Clark, Theresa <Theresa.Clark@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: Meeting with NRR Yes, please set up the meeting. I read Tom's questions and think a discussion around them (not a formal "please respond to the following ... ") will be good.
Gary From: Clark, Theresa Sent: Thursday, July 14, 2016 4:50 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc_gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: Meeting with NRR Not yet-I was about to schedule but was going to ask if you wanted me to do that before we had the list of questions settled.
From: Holahan, Gary Sent: Thursday, July 14, 2016 4:49 PM To: West, Steven <Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough @nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
Meeting with NRR 1
- All, Do we have a meeting NRR (Tim McGinty) set up yet? I don't want our CRGR discussion to get too far ahead of an NRR meeting.
Gary 2
From: Holahan, Gary Sent: Tuesday. July 19, 2016 3:33 PM To: Spencer, Michael Cc: West, Steven; Clark, Theresa; Scarbrough. Thomas Subject RE: Exelon Backfit Appeal Yes, I'm about to add it to the references also ...
From: Spencer, Michael Sent: Tuesday, July 19, 2016 3:30 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>
Cc: W est, Steven <Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>
Subject:
RE: Exelon Backfit Appeal Gary, could you forward this to us? Michael From: Holahan, Gary Sent: Tuesday, July 19, 2016 3:27 PM To: Gody, Tony <Tony.Gody@nrc.gov>
Cc: West, Steven <Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc .gov>; Spencer, Michael <M ichael.Spencer@nrc.gov>
Subject:
RE: Exelon Backfit Appeal
- Tony, Thanks for the document. .. very relevant to the backfit appeal panel effort. Although the panel has not made any final decisions yet, we did meet with NRR management yesterday and asked the *'why did NRR not pursue a generic issue resolution?" question.
We'll keep you informed of the recommendation we forward to the EDO.
Thanks again, Gary From: Gady, Tony Sent: Tuesday, July 19, 2016 8:51 AM To: Holahan, Gary <Gary.Holahan@ nrc.gov >
Subject:
Exelon Backfit Appeal
- Gary, I understand that this email is unsolicited and you do not have to act on the attached information. I am providing this memorandum to you for your consideration if you deem it appropriate.
Tony Gody, Director Division of Reactor Safety Region II
(404) 997-4600
""'~. U.S.NR C 2
From: West, Steven Sent: Tuesday, July 19. 2016 5:36 PM To: Holahan, Gary; Clark, Theresa; Scarbrough, Thomas; Spencer, Michael
Subject:
RE: Exelon Backtit Appeal I'd say this is definitely relevant information and germane to our review.
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov From: Holahan, Gary Sent: Tuesday, July 19, 2016 3:34 PM To: West, Steven <Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
FW: Exelon Backfit Appeal From: Gody, Tony Sent: Tuesday, July 19, 2016 8:51 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>
Subject:
Exelon Backfit Appeal
- Gary, I understand that this email is unsolicited and you do not have to act on the attached information. I am providing this memorandum to you for your consideration if you deem it appropriate.
Tony Gody, Director Division of Reactor Safety Region II (404) 997-4600
- t U.S.NRC
Subject:
Exelon backfit appeal discussion with NRR/DE location: 0-1682 Start: Wed 07/20/2016 12:30 PM End: Wed 07/ 20/2016 1:30 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark, Theresa Required Attendees: Holahan, Gary; West, Steven; Scarbrough, Thomas; Spencer, M ichael; Lubinski. John; Alley, David; Billerbeck. John Hi all, As noted by email, following their meeting with DSS earlier today, the EDO-level appeal panel for the Exelon backfit (Byron/Braidwood PORV/PSV) would like to meet with OE management/staff for an informal discussion of your review role in t he 2015 back fit letter and associated input s.
I know this isn't a perfect time for everyone so I appreciate your patience and willingness to meet. Thanks so much!
The resa
Subject:
Canceled: backfit appeal panel Location: 0-1682 Start: Wed 07/20/ 2016 1:00 PM End: Wed 07/ 20/ 2016 2:00 PM Show Time As: Free Recurrence: (none)
Meeting Status: Not yet responded Organizer: Clark, Theresa Importance: High
.,. cancelling just the old appointment - NRR/ DE appointment stands, and we'll have the room till 2 if we need it**
Subject:
Confirmed: CRGR Formal Review of Review of RIS 2005-29, Rev. l "Anticipated Transients That Could Develop Into More Serious Events" Location: HQ-TWFN 02B0 1-ACRS Room Start: Thu 07/21/ 2016 3:00 PM End: Thu 07/21/2016 5:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Cupidon. Les Required Attendees: Cupidon. Les: Munday. Joel; Mcdermott, Brian; Williamson. Edward; Wert., Leonard; Ordaz. Vanna: West. Steven; Hackett. Edwin; Mensah. Tanya; Whitman, Jennifer; Oesterle, Eric; Stuchell. Sheldon; Garmoe, Alex; Difrancesco. Nicholas; Mcginty, Tim; Taylor. Robert Optional Attendees: Borromeo, Joshua; DSSCAL Resource; Spencer. Michael; Clark, Theresa When: Thu, Jul 21, 2016, 3:00 PM Where: T-2B1 (ACRS Room)
I have cancelled the June 16th dale. We will meet in the ACRS conference room T2B1.
~.
From: Spencer. Michael Sent: Thursday. July 21. 2016 4:13 PM To: Holahan, Gary; Clark, Theresa
Subject:
Our records do no t show an SRM for SECY-77-4 39. NFM Michael
From: Scarbrough, Thomas Sent: Monday, July 25. 2016 3:00 PM To: Holahan. Gary; West. Steven; Clark, Theresa; Spencer, Michael
Subject:
RE: safety valves I will be there.
Thanks.
Tom From: Holahan, Gary Sent: Monday, July 25, 2016 2:36 PM To: Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: safety valves We should talk ... tomorrow at 2pm From: Scarbrough, Thomas Sent: Monday, July 25, 2016 12:56 PM To: Holahan, Gary <Gary,.Holahan@nrc .gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: safety valves If the NRC staff accepts the justification provided by a licensee that a safety valve will not stick open, then the a stuck-open safety vafve would be counted as the single failure in the accident analysis. Therefore, the licensee would not be required to assume another failure (such as losing one ECCS train). This was the result of the staff position for the Byron/Braidwood Stretch Power Uprate that the safety valve would not stick open based on the EPRI test data.
In the back.fit decision, the staff is taking the position that a stuck-open safety valve can only be counted as the single failure if the valve is qualified per the ASME BPV Code (which would include liquid service certification). Otherwise, the safety valve is assumed to stick open as a consequential failure caused by water relief.
In answer to your question, the capability of a safety valve to reseat under liquid service needs to be justified by the licensee for a stuck-open safety valve to be counted as the single failure in the accident analysis.
Thanks.
Tom From: Holahan, Gary Sent; Monday, July 25, 2016 12:18 PM To: Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; West, Steven <Steven.West@nrc.go~>; Clark, Theresa
<Theresa .Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: safety valves Thanks. Tom. Closer, understand that the ..could.. means **would have to be considered as a single failure (not a consequential failure)". Are you also saying that a stuck-open SV "is a legitimate single failure" or ~would l
need to be justified as a single failure** or **1s not usually assumed as a single failure** or "there's no standard assumption"?
I think the answer will gets very close to a final position, Gary From: Scarbrough, Thomas Sent: Monday, July 25, 2016 11:18 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.goJ!>i Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: safety valves
- Gary, I used the phrase "could be considered a single failure" because the NRC staff made this finding (at least implicitly) as part of its review of the Byron/Braidwood Stretch Power Uprate. The staff at that time assumed that the safety valves would reseat with liquid service. Therefore, the staff would have considered the failure of a safety valve to reseat to be the single failure in an accident analysis.
Thanks.
Tom From: Holahan, Gary Sent: Monday, July 25, 2016 11:01 AM To: Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa.Ctark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: safety valves Thanks Tom. Very helpful.
One sentence confused me [3'd sentence of the last paragraph]:
"In the case of a safety valve, I believe that the failure to reclose could be considered a single fal1ure if the NRC staff accepted the justification provided by the licensee that the valve will reliably reseat."
I understand the rest of the paragraph and the "Therefore ... ", but the "could be considered a single failure" has me confused.
Gary From: Scarbrough, Thomas Sent: Monday, July 25, 2016 10:16 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: safety valves
- Gary, I agree that the vendor and ASME documents do not provide specific discussion regarding the potential for safety valves to stick open. However, the design and qualification of a safety valve must include its ability to reliably reclose. For example. the Crosby Engineering Handbook includes specific references to reclosing and 2
A passive failure in a fluid system means a breach in the fluid pressure boundary or a mechanical failure which adversely affects a flow path. Examples include the failure of a simple check valve to move to its correct position when required, the leakage of fluid from failed components, such as pipes and valves--
particularly through a failed seal at a valve or pump--or line blockage. Motor-operated valves which have the source of power locked out are allowed to be treated as passive components.
In the study of passive failures it is current practice to assume fluid leakage owing to gross failure of a pump or valve seal during the long term cooling mode following a LOCA (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or greater after the event) but not pipe breaks. No other passive failures are required to be assumed because it is judged that compounding of probabilities associated with other types of passive failures. following the pipe break associated with a LOCA, results in probabilities sufficiently small that they can be reasonably discounted without substantially affecting overall systems reliability.
It should be noted that components important to safety are designed to withstand hazardous events such as earthquakes. Nevertheless. in keeping with the defense in depth approach, the staff does consider the effects of certain passive failures (e.g., check valve failure. medium or high energy pipe failure, valve stem or bonnet failure) as potential accident initiating events.
Thus, the NRG staff allows check valves to be assumed to be passive components in certain instances under the Single Failure Criterion described in SECY-77-439.
With respect to squib valves, the NRC staff raised concerns during AP1000 vendor inspections regarding the potential for squib valves to open inadvertently. In response, Westinghouse has included blocking features to avoid inadvertent opening of squib valves. AP1000 DCD Tier 2, Section 15.6.1 includes inadvertent opening of Stage 1 ADS valves (MOVs), but not Stage 4 ADS valves (squib valves). Therefore, the inadvertent opening of the ADS squib valves would be an example where this potential would be considered a single failure.
In summary, the NRC staff allows some components to be assumed to be passive in evaluating single failures as described in SECY-77-439. I believe that the reference to "under development" in 10 CFR Part 50, Appendix A, allows the NRC staff to make a case*by-case decision for a single failure assumption for a passive fluid component, and whether a "known and established standard" can be considered to exist regarding the performance of that component. In the case of a safety valve, I believe that the failure to reclose could be considered a single failure if the NRC staff accepted the justification provided by the licensee that the valve will reliably reseat. The staff accepted the EPRI testing program for this justification for Byron and Braidwood during the Stretch Power Uprate review based on its evaluation of the EPRI test data without mandating that the safety valves be certified for liquid service by ASME and the National Board. Further, we have found a wide range of justification accepted by the NRC staff for the ~qualification" of safety and relief valves for liquid service in license amendments for other nuclear power plants. Therefore, I do not consider a specific "known and established standard" has been applied by the NRC staff in evaluating the acceptability of safety and relief valves to perform with liquid service. Nevertheless, I believe that licensees should avoid water relief through safety valves because they were not originally intended for this service, and the testing program performed by EPRI was limited in the sample size of valves tested and their range of service conditions.
Thanks.
Tom From: Holahan, Gary Sent: Thursday, July 21, 2016 10:54 AM To: Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<!~eresa.Clark@nrc.gov>; Spencer, Michael <Michaef.Spencer@nrc.gov>
Subject:
safety valves
- Tom, 4
reseating of its pressure relief valves. In addition, ASME Standard QME-1-2007 as accepted in RG 1.100 (Revision 3) defines a pressure relief assembly as follows:
pressure relief valve assembly: a valve assembly that is designed to open to prevent a rise of internal fluid pressure, in excess of a specified value, and re-close.
Mandatory Appendix I, "Qualification Specification for Active Valves," in ASME QME-1-2007 in Section OV-18000 states in item (h) that the specification must incfude blowdown (difference between set point pressure and reseating pressure).
Section QV-7660, "Functional Qualification," for safety and relief valves in ASME QME-1-2007 states that functional qualification for pressure relief valve assemblies shall be as delineated in ASME BPV Code, Section Ill, Subsections NB, NC, or ND 7000.
Subsection NB-7000 in ASME BPV Code (2007 Edition) addresses the reclosing of safety valves in various paragraphs. For example, item (k) in NB-7220. "Content of Report," in NB-7200, "Overpressure Protection Report," requires that the report shall include consideration of set pressure and blowdown limitations, taking into account opening pressure tolerances and overpressure of the pressure relief device. In addition, NB-7512.3, "Blowdown," for safety valve operating requirements specifies that the safety valves shall be adjusted to close after blowing down to a pressure not lower than 95% of the set pressure unless a different percentage is specified in the design specification and the basis is covered in the Overpressure Protection Report.
Therefore, the design and qualification of a safety valve include its ability to reclose reliably to be able to satisfy its blowdown requirements.
Until the TMl-2 accident, I do not believe that there was much concern regarding safety and relief valves sticking open. It was assumed that the simple spring-loaded design of safety valves provided reasonable assurance that this valve design was not subject to a significant concern regarding failure to reclose. In response to the TMl-2 accident. NUREG-0737 included Mqualification" requirements to provide confidence that safety and relief valves would not stick open under various steam and liquid conditions. However, NUREG~
0737 did not require that safety and relief valves be "certified'" for all service conditions. The EPRI testing program in response to NUREG-0737 was limited in its extent of testing. but did confirm that a generic problem did not exist regarding safety and relief valves sticking open under various conditions.
SRP Section 15.6.1 (2007), "Inadvertent Opening of a PWR Pressurizer Pressure Relief Valve or a BWR Pressure Relief Valve," provides a requirement to evaluate an inadvertent opening of a PWR safety valve. SRP 15.6.1 states that a pressure relief valve, as defined in ANSI 895.1-1972, is a device designed to reclose and prevent further fluid flow after normal conditions are restored. The SRP section does not provide details regarding the assumption for the safety valve to stick open. However, AP1000 OCO Tier 2, Section 15.6.1, states that the "inadvertent opening of a pressurizer safety valve can only be postulated due to a mechanical failure." The AP1000 accident analysis assumes that the safety valve remains open throughout the event.
Check valves are considered passive components in some instances (such as system design) and active components in other instances (such as the 1ST Program). NUREG-1482 (Revision 2) states in Section 4.1 that SECY-77-439, Single Failure Criterion," dakd August 17, 1977, which was referenced in several plants' licensing bases, discusses thc failure 0f a check \'alvc t0 1110\'e to its correct ()(lsition as a passive failure; however, this docs not c<1rrespond to the i.s.sue of "active** versus .. passive for the purpose of 1ST.
In Section 2, SECY-77-439 (ADA~S No. ML060260236) states the following:
D. Passive Failure in a Fluid System 3
This is your area ... but I did check the Byron and Braidwood UFSAR and the Crosby Engineering Handbook (both added to the References). Neither speaks to safety valve re-closure as a "protection function" or even as a requirement (for either liquid or stream relief). Safety valves are clearly designed to re-close {as opposed to rupture disks and other "non-rec/osure" devices), but the Code and designer requirements seem to be limited to set-points and capacities.
Could it be that "failure to close" for a simple spring-loaded safety valve to considered a "passive failure" like pipe ruptures (or a valve bonnet rupture)? ... and therefore not required or addressed in safety analyses? Are there other components or functions that we just don't address as potential single failures or consequential failures because they are considered so unlikely? Check valves?
The introduction says {in a footnote),
Single failures of passive components in electric systems should be assumed in designing against a single failure. The conditions under which a single failure of a passive component in a fluid svstem should be considered in designing the system against o single failure are under development.
Does "under development" sound like a "known and established standard of the Commission?"
Could the answer be related to definition of and practice on "consequential failures"? Is "not designed for" or "not certified to" the standard? Or is "not expected to function" or "not assured to function" or "not demonstrated to" the standard? Or is there no standard?
Maybe the Panel shouldn't need to be working on such fundamental issues, but there doesn't seem to be an answers for such questions ...
Gary 5
Subject:
Exelon backfit appeal w/ FMA Location: T-6F34 Start: Tue 07/26/2016 2:00 PM End: Tue 07/26/ 2016 3:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark. Theresa Required Attendees: Akstulewicz. Frank; Holahan. Gary; WEST. Steven S; SPENCER, MICHAEL A; SCARBROUGH. THOMAS G Hi all, As noted by email, the EDO-level appeal panel for the Exelon backfit (Byron/Braidwood PORV/PSV) would like to meet with Frank for an informal discussion of his recollection of the original 2001 stretch power uprate that is brought up in the context of the appeal.
I know this isn't a perfect time for everyone (I think it'll be Gary, M ichael, and me only with Frank) so I appreciate everyone's flexibility). Thanks so much I Theresa
Subject:
backfit appeal panel Location: 0-16B6 Start: Wed 07/27/2016 2:00 PM End: Wed 07/27/2016 3:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: CLARK, THERESA V Required Attendees: HOLAHAN, GARY M: WEST. Steven S; SCARBROUGH. THOMAS G; SPENCER, MICHAEL A I think Steve and Tom are both out, but blocking for Gary and Michael anyway.
[FYI, only meeting this week given two all-day Commission meetings on 7/ 26 and 7/ 28.[
From: Holahan, Gary Sent: Friday, July 29, 2016 3:00 PM To: Scarbrough, Thomas; Spencer, Michael: Clark. Theresa; West, Steven
Subject:
RE: A New attempt at "Crisp" Thank you . Tom From: Scarbrough, Thomas Sent: Friday, July 29, 2016 2:59 PM To: Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa <lheresa.Clark@nrc.gov>; Holahan, Gary
<Gary.Ho/ahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>
Subject:
RE: A New att empt at "Crisp" I am fine with the latest version.
Thanks.
Tom From: Spencer, Michael Sent: Friday, July 29, 2016 1:14 PM To: Clark, Theresa <Theresa.Clark@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: A New attempt at "Crisp" I'm happy with the document. No more comments.
From: Clark, Theresa Sent: Friday, July 29, 2016 1:09 PM To: Spencer, Michael <Michael.Spencer@nrc.gov>; Holahan, Gary <Garv.Holahan@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: A New attempt at "Crisp" I added that sentence in ...
From: Spencer, Michael Sent: Friday, July 29, 2016 12:16 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: A New attempt at "Crisp" I very much like the addition, but now I see some tension with the following sentence in the first paragraph: "The Panel concludes that in 2001 and 2004 there was no known and established standard of the Commission relating to the potential of pressurizer safety valves (PSVs) to fail following water discharge during Inadvertent Operation of Emergency Core Cooling System (ECCS) events."
Perhaps we could replace the sentence in the first paragraph with a sentence based on your addition, something like: ~The panel concludes that in 2001, 2004, and at present, the known and established standard of the Commission is that the probability of failure of pressurizer safety valves (PSVs) following water
discharge during Inadvertent Operation of Emergency Core Cooling System (ECCS) should be sufficiently small based on well-informed staff engineering judgment."
Michael From: Holahan, Gary Sent: Friday, July 29, 201611:52 AM To: Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: A New attempt at "Crisp" I agree. Re-formatting and recent comments all look very good. I accepted all and added one.
Please see the latest version in Report folder ... attempting to articulate current standard as:
... The panel concludes that the standard, for not assuming valve failure, in place in 2001, 2004 and at present is simply that the probability offailure of PS Vis sufficiently small, based on well-informed staff engineering judgement; and that the use of the word "qualified" or "qualification" implied only a general demonstration of capability, such as in the EPRI testing done in response to TM/ Action Plan.
From: Spencer, Michael Sent: Friday, July 29, 2016 10:49 AM To: Clark, Theresa <Theresa.Clark@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Holahan, Gary
<Gary. Holahan@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nre.gov>
Subject:
RE: A New attempt at "Crisp" Great job. I really like how the reformatting organizes the various points. My only comment is: on the last page there should be a space between the paragraph starting "Moreover"' and the paragraph starting "The panel concludes."
Michael From: Clark, Theresa Sent: Friday, July 29, 2016 10:37 AM To: West, Steven <5teven.West@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: A New attempt at "Crisp" I edited/reformatted somewhat and incorporated Steve's comments. I don't think I made any substantive changes (especially that Tom would have an issue with, since he is away from his computer for most of the day) but thought some formatting might help it read better.
You may wish to view the attached in "No Markup" mode on the "Review" tab so it doesn't look messy. I already accepted all of the formatting changes.
Gary, I know you are working a version too. This one is also in the S: drive.
From: West, Steven Sent: Friday, July 29, 201610:32 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Clark, Theresa 2
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subjett: RE: A New attempt at "Crisp"
- Gary, Nice! See my attached markup for a few corrections and suggestions.
We don't need to address it in the Crisp document, but I suggest we talk about if and how we should address the staffs apparent failure to treat this issue generically in accordance with its procedures.
Steve
Original Message --------
From: "Holahan, Gary" <Gary.Holahan(iilnrc.gov>
Date: Fri, July 29, 2016 8: 16 AM -0500 To: "Scarbrough, Thomas" <Thomas.Scarbrough@nrc.gov>, "West, Steven" <Steven.West{runrc.gov>, "Clark, Theresa"
<Theresa. Cla rk@nrc.gov >, "Spencer, Michael" < Michael.Spencer@' n re.gov>
Subject:
RE: A New attempt at "Crisp" Thanks Tom, got it.
From: Scarbrough, Thomas Sent: Friday, July 29, 2016 7:08 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steve!'lWest@nrc.gov>; Clark, Theresa
<The resa.Clark@nrc.gov>; Spencer, M ichae I < Michael.Spencer@nrc._go~>
Subject:
RE: A New attempt at "Crisp" I am fine with the crisp summary.
We could add another sentence at the end of the Beaver Valley 2006 paragraph to identify the wide-spread reference to the EPR1 program, such as:
In addition, the panel found general references to EPRI and vendor testing for the capability of SVs and PORVs in licem,e amendments for other nuclear power plants.
I see a few minor typographical edits (such as use of SV and PSV), but I am sure that Theresa will identify those items.
Thanks.
Tom From: Holahan, Gary Sent: Thursday, July 28, 2016 5:01 PM To: West, Steven <Steven.West@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@rJ!C.gov>
Subject:
A New attempt at "Crisp"
- Steve, Tom,
- Michael, Theresa, Please see attached. I have cut the 4-pager in half to make it a "crisp" summary of preliminary findings far OEDO, NRR, and OGC.
3
The longer write-ups look like good input to the final report.
Please review and comment.
Gary 4
From: Holahan. Gary Sent: Friday. July 29, 2016 3:5 1 PM To: West. Steven; Clark, Theresa; Scarbrough, Thomas; Spencer, Michael
Subject:
Preliminary Findings
- Panel, Thanks to all outstanding (preliminary) effort. I plan on delivering the 7/29/ 16 3pm version to Vic, Mike, and Glenn on Monday morning .
. . . And then deliver it to NRR and OGC on Tuesday, if we don't get OEDO comments.
Gary
From: Johnson, Michael Sent: Sunday, July 31, 2016 9:10 AM To: Holahan, Gary; Mccree, Victor; Tracy, Glenn; Dean. Bill; Lubinski, John; Mcginty. Tim; Akstulewicz, Frank; Doane. Margaret Cc: Hackett. Edwin; West. Steven; Clark, Theresa; Scarbrough, Thomas; Spencer, Michael; Evans. M ichele; Mcdermott. Brian; Williamson. Edward; M izuno, Geary; Shuaibi, Mohammed
Subject:
RE: Preliminary Findings of the Exelon Backftt Panel - ODO- Pr@-t1etisio11a1 Imel 11&+-
HRE ~se 01119 .
Thanks Gary.
From: Holahan, Gary Sent: Friday, July 29, 2016 1:58 PM To: Mccree, Victor <Victor.McCree@nrc.gov>; Johnson, Michael <M ichael.Johnson@nrc.gov>; Tracy, Glenn
<Glenn.Tracy@nrc.gov>; Dean, Bill <Bill.Dean@nrc.gov>; Lubinski, John <John.l ubinski@nrc.gov>; Mcginty, Tim
<Tim.McGinty@nrc.gov>; Akstulewicz, Frank <Frank.Akstulewicz@nrc.gov>; Doane, Margaret
<Margaret.Doane@nrc.gov>
Cc: Hackett, Edwin <Edwin.Hackett@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Spencer, Michael
<Michael.Spencer@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; Mcdermott, Brian
<Brian .M cDermott@nrc.gov>; Williamson, Edward <Edward.Williamson@nrc.gov>; Mizuno, Geary
<Geary.Mizuno@nrc .gov>; Shua ibi, Mohammed <Mohammed.5huaibi@nrc.gov>
Subject:
Preliminary Findings of the Exelon Backfit Panel * ~ ?. t decisional I.ate, 11&1 W'lC tlse-8~
Importance: High
- Vic, Margie,
- Mike, Glenn.
- Bill, John,
- Tim, Frank, Based on a review of more than 50 documents (covering a period from 1971 to the present), and discussions with OGC staff, NRR staff, former NRR staff. and the CRGR, the Exelon Backfit Panel has developed Preliminary findings that it believes should be shared with NRC internal stakeholders.
Here is the Exelon Backfit Panel's roll-out plan for completing its work:
8/1/16 Provide Preliminary Findings to OEDO for information and feedback on scope and depth-of-review and other expectations 8/2/16 Provide Preliminary Findings to NRR (and former NRR staff) and OGC for completeness and accuracy
.. ."fact checking" 8/9/16 Collect any comments 819/16 RES provides insights on risk and safety significance 8/19/ 16 Prepare Draft final Report with findings, response to questions, and recommendations.
8/29/16 Provide final Report to EDO The Panel will be available for discussion of any issues or concerns during the weeks of 8/1/16 and 8/8/16.
Gary 2
From: Holahan, Gary Sent: Thursday, August 04, 2016 4:07 PM To: Spencer, Michael; West. Steven; Scarbrough, Thomas; Clark, Theresa
Subject:
RE: Things to review Very good,
- Thanks, Yes we need RES for 05
- All, Please work hard while rm of tomorrow.
Gary From: Spencer, Michael Sent: Thursday, August 04, 2016 4:02 PM To: Holahan, Gary <Gary. Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thornas.Scarbrough@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
RE: Things to review I have provided comments on the cover memo, which is saved on the S:drive. I suggest that we include brief responses to the 5 questions the EDO asked us. I have copied the questions and suggested brief responses to the first four of them (based in large part on discussion already developed}. Presumably, we need to wait on RES to answer the 5th question.
Michael From: Holahan, Gary Sent: Wednesday, August 03, 2016 4:58 PM To: West, Steven <Steven .West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
Things to review
- Steve, Tom,
- Michael, Theresa, I have taken the Preliminary Findings document and incorporated it into a "Discussion" section . I added text to make it read like a report (no changes to findings or conclusions). Please review at Reports/ Backfit Appeal Report 2016 08 03 2pm.
Next I will start on the Enclosures (and the sections referring to them).
I have also drafted (first draft ... ) a memo to Vic presenting the report. Please review at Reports/ Cover memo Backfit Appeal Panel 2016 08 03 2pm.
Gary 1
P.S. I told Vic that I promoted you to team member, so he won't be surprise to see your name on the cover memo.
2
From: Holahan. Gary Sent: Monday, August 08, 2016 12:59 PM To: West. Steven; Spencer, Michael; Clark, Theresa; Scarbrough, Thomas
Subject:
RE: backfit appeal panel meeting I have not heard that NRR is ready to withdraw the backfit. I'm expecting technical comments.
I have not heard any requests for a meeting either.
If they do have comments. we should consider having a meeting with them (whether they ask or not).
Gary From; West, Steven Sent: Monday, August 08, 2016 12:45 PM To: Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Holahan, Gary
<Gary.Holahan@nrc .gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: backfit appeal panel meeting That's an interesting question . Presumably. if that were to happen. we would still document the results of our review? (I heard through the grapevine that NRR was preparing comments, but nothing about the nature of those comments.)
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov From: Spencer, Michael Sent: Monday, August 08, 2016 12:42 PM To: Clark, Theresa <Theresa.C1ark@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven
<St even.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE : backfit appeal panel meeting Is there any hint as to whether NRR will withdraw the baci<fit?
From: Clark, Theresa Sent: Monday, August 08, 2016 12:33 PM To: Spencer, Michael <Michael.Spencer@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: backfit appeal panel meeting I'll see what I can find. August 10 was looking messy when l checked over the weekend.
I think there might be a few items from the report to discuss even in the absence of comments. NRR said this morning we'd have them tomorrow or Wednesday.
From: Spencer, Michael Sent: Monday, August 08, 2016 12:31 PM To: Clark, Theresa <Theresa.Clark@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: backfit appeal panel meeting We had requested comments by tomorrow. Unless we have already received NRRs comments, then it might be better to meet on August 10 so we could discuss any comments we receive tomorrow.
Michael
---*-Original Appointment-----
From: Clark, Theresa Sent: Saturday, August 06, 2016 11:23 PM To: Clark, Theresa; Holahan, Gary; West, Steven; Spencer, Michael; Scarbrough, Thomas
Subject:
backfit appeal panel meeting When: Tuesday, August 09, 2016 11:00 AM-12:00 PM (UTC-05:00) Eastern Time (US & Canada).
Where: HQ-OWFN-11B02-12p Just realized we didn't have any more meetings scheduled!
T 2
From: Holahan, Gary Sent: Monday. August 08, 2016 1:11 PM To: West, Steven; Clark, Theresa; Scarbrough, Thomas; Spencer, Michael
Subject:
RE: Things to review Now that there is a "clean" Saturday version to work from (thanks, Theresa), I think further review and comment is OK.
Gary From: West, Steven Sent: Monday, August 08, 2016 1:03 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: Things to review Would it be better for us to hold off commenting until after you complete your current review and revision?
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301 -287-3734 Steven.West@nrc.gov From: Holahan, Gary Sent: Monday, August 08, 2016 10:34 AM To: Clark, Theresa <Theresa.Clark@nrc.gov>; West, Steven <Steven.West @nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: Things to review
- Theresa, Thank you. The report looks great. I'm re-reading and fillig in the blanks and references as I go.
Gary From: Clark, Theresa Sent: Saturday, August 06, 201611:27 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <St even.West @nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
RE: Things to review 1
Note: The blackened out texxt actually is pink highlighting in the original. The highlighted Gentlemen, word s are "pink highlights."
We're really getting there. I took the files prepared to date (memo including Michael's comments, Gary's report file, and Tom's enclosures file) and created two clean files that have been formatted, edited, and otherwise prettified and such. I added some comments in the margin where I wasn't quite sure about things. Yellow highlights are for references that will need to (eventually) be put into a single format with a single list at the end-my next big project, I think. *
- are inserts for the future.
- S:\Backfit-Appeal\Report\cover memo (clean as of 2016 08 06 11pm).docx
- S:\Backfit -Appeal\Report\Backfit Appeal Panel Report {clean as of 2016 08 06 11pm).docx Just because it looks all nice doesn't mean it' s done (or that my edits were necessarily correct-note that we can do a compare to the last version if needed, since I accepted all of the messy changes). But, like I said, getting there. I just set up a meeting for Tuesday since we didn't have any more on the calendar, and I can set more thereafter as needed.
Thanks!
Theresa Valentine Clark Executive Technical Assistant (Reactors)
U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov I 301-41S-4048 I 0 -16E22 From: Holahan, Gary Sent: Wednesday, August 03, 2016 4:58 PM To: West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
Things to review
- Steve, Tom,
- Michael, Theresa, I have taken the Preliminary Findings document and incorporated it into a "Discusslon" section. I added text to make it read like a report (no changes to findings or conclusions). Please review at Reports/ Backfit Appeal Report 2016 08 03 2pm.
Next I will start on the Enclosures (and the sections referring to them).
I have also drafted (first draft. .. ) a memo to Vic presenting the report. Please review at Reports / Cover memo Backfit Appeal Panel 2016 08 03 2pm.
Gary 2
Subject:
backfit appeal panel meeting Location: HQ* OWFN-11B02-12p Start: Tue 08/09/2016 11:00 AM End: Tue 08/ 09/ 2016 12:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark, Theresa Required Attendees: Holahan, Gary; West, Steven; Spencer, Michael; Scarbrough, Thomas Just realized we didn't have any more meetings scheduled!
T
Subject:
backfit appeal panel Location: HQ-OWFN-16B06- l2p Start: Thu 08/ 11/2016 12:00 PM End: Thu 08/ 11/ 2016 1:00 PM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark, Theresa Required Attendees: Holahan, Gary; West, Steven; Scarbrough, Thomas; Spencer, Michael This is just a placeholder. I'm fully aware that meetings at noon are inhumane. I just don't see another option if we do want to meet Thursday. More to come © .
Theresa
From: Clark, Theresa Sent: Thursday, August 11. 2016 1:16 PM To: Holahan, Gary Cc: West, Steven; Scarbrough. Thomas; Spencer, Michael
Subject:
Re: REQUEST: backfit appeal panel meeting w/ Vic That was the intent of my "Mike may also wish to attend." He is free at the suggested time so I'll make sure Patti includes. Thanks!
On: 11 August 2016 13:14, "Holahan, Gary" <Gary.Holahan@nrc.g<w> wrote:
How about inviting Mike Johnson?
From: Clark, Theresa Sent: Thursday, August 11, 2016 1:04 PM To: Sprogeris, Patricia <Patricia.Sprogeris@nrc.gov>
Cc: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Sp encer@nrc.gov>
Subject:
REQUEST: backfit appeal panel meeting w/ Vic
- Patti, Can you please arrange a meeting for the backfit appeal panel {Gary Holahan, Steve West, Tom Scarbrough, and Michael Spencer) with Vic? Mike may also wish to attend. The week of August 22 would be ideal, perhaps 11am 8/24 for half an hour if Gary and Steve can make that work (others are free). Otherwise, please work your magic to find a time. Thanks!
Theresa Valentine Clark Executive Technical Assistant (Reactors)
U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov j 301-415-4048 I 0 -16E22
From: West. Steven Sent: Thursday. August 11. 2016 624 PM To: Holahan. Gary; Correia, Richard; Scarbrough. Thomas; Spencer, Michael; Clark, Theresa Cc: Weber. Michael; Hackett. Edwin; Thaggard, Mark; Coyne, Kevin
Subject:
RE: Memorandum From: V. McCree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 5034{8), GDC 15, GDC 21. GDC 29, and the Licensing Basis Looks like good airplane reading for me next week!
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301 -287-3734 Steven.West@nrc .gov From: Holahan, Gary Sent: Thursday, August 11, 2016 6:21 PM To: West, Steven <Steven.West@nrc.gov>; Correia, Richard <Richard.Correia@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Hackett, Edwin <Edwin.Hackett@nrc.gov>; Thaggard, Mark
<Mark.Thaggard @nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>
Subject:
RE: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8). GDC 15, GOC 21, GDC 29, and the Licensing Basis Thanks from me also. Rich.
Looks like we will be studying the report for a while.
Gary From: W est, Steven Sent: Thursday, August 11, 2016 6:12 PM To: Correia, Richard <Richard.Correia@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa
<Theresa. Cla rk@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Hackett , Edwin <Edwin.Hackett@nrc.gov>; Thaggard, Mark
<Mark.Thaggard@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>
Subject:
RE: Memorandum From : V. Mccree to G. Holahan re; Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR S0.34(B), GDC 15, GOC 21, GDC 29, and the Licensing Basis
Thanks, Rich. This helps answer an important question and will be very helpful to the panel. Please pass on my sincere thanks to all of the contributors.
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov From: Correia, Richard Sent: Thursday, August 11, 2016 5:54 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, M ichael <Michael.Spencer@nrc.gov>; Clark, Theresa
<Theresa.C1ark@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Hackett, Edwin <Edwin.Hackett@nrc.gov>; Thaggard, Mark
<Mark.Thaggard@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>
Subject:
Memorandum From: V. M ccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GDC 15, GDC 21, GDC 29, and the Licensing Basis Importance: High Gary et al.,
The attached risk assessment report addresses the Byron/ Braidwood backit issue. The conclusion is that the maximum benefit from a potential backfit remedy would provide a very small reduction in risk (i.e., less than 1E-06/year). It should be noted that the analysis contained in the report was narrowly focused on the backfit question under review by the Appeal Review Board and is intended to provide additional context and insights to the Board. As such, other applications of this information may not be appropriate unless this limitation is recognized.
Please let me know if you need any additional information or if you would like a briefing.
Regards Richard P. Correia, P.E Director, Divisioll ol Risk A11ah1sis Office a£ Nuclear Re5ul...itonJ Research 0
U.S.NRC 2
From: Correia, Richard Sent: Friday, August 12, 2016 9:33 AM To: West. Steven; Holahan, Gary; Scarbrough, Thomas; Spencer. Michael; Clark, Theresa Cc: Weber, Michael; Hackett. Edwin; Thaggard. Mark; Coyne. Kevin
Subject:
Re: Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GDC 15, GDC 21. GDC 29, and the Licensing Basis You are most welcome Steve and thanks for the opportunity. Very interesting analysis. We need to do more to support decisions like this. I will pass on thanks to all.best Rich Richard Correia, P.E.
Director, Division of Risk Analysis Office of Nuclear Regulatory Research USNRC On: 11 August 2016 I 8:11 , "West, Steven" <Steven.West@nrc.gov> wrote:
Thanks, Rich. This helps answer an important question and will be very helpful to the panel. Please pass on my sincere thanks to all of the contributors.
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 30'1-287-3734 Steven.W est@nrc.gov From: Correia, Richard Sent: Thursday, August 11, 2016 5 :54 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Hackett, Edwin <Edwin.Hackett@nrc.gov>; Thaggard, Mark
<Mark.Thaggard@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>
Subject:
Memorandum From: V. Mccree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Complia nce with 10 CFR 50.34(8), GDC 15, GDC 21, GDC 29, and the Licensing Basis Importance: High Gary et al..
The attached risk assessment report addresses the Byron/Braidwood backit issue. The conclusion is that the maximum benefit from a potential backfit remedy would provide a very small reduction in risk (i.e., less than 1E-06/year). It should be noted that the analysis contained in the report was narrowly focused on the backfil question under review by the Appeal Review Board and is intended to provide additional context and insights to the Board. As such, other applications of this information may not be appropriate unless this limitation is recognized.
Please let me know if you need any additional information or if you would like a briefing.
Regards Richard P. Correia, P.E Director, Division a{ Risk Anah1sis Of£ice al Nuclear Regula.tonJ Research U.S.NRC 2
From: Correia. Richard Sent: Friday. August 12, 2016 9:34 AM To: Holahan. Gary; West. Steven; Scarbrough. Thomas; Spencer. Michael; Clark, Theresa Cc: Weber, M ichael; Hackett. Edwin; Thaggard, Mark; Coyne. Kevin
Subject:
Re: Memorandum From: V. McCree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR 50.34(8), GDC 15, GDC 21, GDC 29, and the Licensing Basis Your welcome Gary and please let us know if we can support in any way Rich Richard Correia, P.E.
Director, Division of Risk Analysi s Office of Nuclear Regulatory Research US !\RC On: 11 August 2016 18:20, "H~llahan. Gary" <Gary .HolahanQL}nn.:.gov> wrote:
Thanks from me also. Rich.
Looks like we will be studying the report for a w hile.
Gary From: West, Steven Sent: Thursday, August 11, 2016 6 :12 PM To: Correia, Richard <Richard .Correia@nrc.gov>; Holahan, Gary <Gary.Ho lahan@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Hackett, Edwin <Edwin.Hackett @nrc.gov>; Thaggard, Mark
<Mark.Thaggard@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>
Subject:
RE: Memorandum From: V. McCree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Co mpliance with 10 CFR 50.34(8), GDC 15, GDC 21, GDC 29, and the Licensing Basis Thanks. Rich . This he!ps answer an important question and w ill be very helpful to the panel. Please pass on my sincere thanks to all of the contributors.
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U .S. Nuclear Regula tory Commission 301-287-3734 Steven.West@nrc .gov
From: Correia, Richard Sent: Thursday, August 11, 2016 5:54 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>
Cc: Weber, Michael <Michael.Weber@nrc.gov>; Hackett, Edwin <Edwin.Hackett@nrc.gov>; Thaggard, Mark
<Mark.Thaggard@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>
Subject:
Memorandum From: V. McCree to G. Holahan re: Charter for Backfit Appeal Review Panel Associated with Byron and Braidwood Compliance with 10 CFR S0.34(B), GDC 1S, GDC 21, GDC 29, and the Licensing Basis Importance: High Gary et al.,
The attached risk assessment report addresses the Byron/Braidwood backit issue. The conclusion is that the maximum benefit from a potential backfit remedy would provide a very small reduction in risk (Le .. less than 1E-06/year). It should be noted that the analysis contained in the report was narrowly focused on the backfit question under review by the Appeal Review Board and is intended to provide additional context and insights to the Board. As such, other applications of this information may not be appropriate unless this limitation is recognized.
Please let me know if you need any additional information or if you would like a briefing.
Regards Richard P. Correid, P.E Director. Division of Risk AndhJsis OH ice 0£ Nuclear Rc5\.1Iaton1 Research U.S.NRC 2
Subject:
backfit appeal panel meeting location: EDO-OWFN-17Hl4-14p Start: Wed 08/ 17/2016 8:30 AM End: Wed 08/ 17/ 201610:00 AM Recurrence: (none)
Meeting Status: Accepted Organizer: Clark, Theresa Required Attendees: Holahan, Gary; West, Steven; Scarbrough. Thomas; Spencer, Michael Steve's conference session is Tuesday, 10:30- 12:00, so I' m hoping this t ime will work out well. Steve, if you give me a number, we can call you .
I'm guessing this meeting will focus on comment response, discussion of the RES input, and other final items.
- Thanks, Theresa
From: Holahan. Gary Sent: Wednesday, August 17, 2016 1:42 PM To: West, Steven; Clark, Theresa Cc: Scarbrough. Thomas; Spencer. M ichael
Subject:
RE: Panel report comments Thanks, Steve.
Original Message-----
From: West, Steven Sent: Wednesday, August 17, 2016 11 :47 AM To: Clark. Theresa <Theresa.Clark@nrc.gov>
Cc: Holahan, Gary <Gary.Holahan@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>;
Spencer, Michael <Michael.Spencer@nrc.gov>; West, Steven <Steven.West@nrc.gov>
Subject:
Panel report comments I'm going to send my comments in chunks. Here are my comments on section 1 and a proposal for a new section 2.
Steve
From: Holahan, Gary Sent: Wednesday. August 17. 2016 2:45 PM To: Clarie, Theresa; Spencer. Michael; West. Steven; Scarbrough. Thomas
Subject:
RE: Containment Contamination Argument Excellent stuff From: Clark, Theresa Sent: Wednesday, August 17, 2016 2:01 PM To: Spencer, Michael <Michael.Spencer@nrc.gov>; Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven
<Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: Containment Contamination Argument Search of FSAR stuff. .. see red for most interesting. Sorry this is sort of stream of consciousness at the moment.
Re standard conformance:
Braidwood 2004 FSAR submittal, but most pages dated December 2002: ML051660219
- P. 15.5-3, Section 15.5.1.2 on IOECCS: "American Nuclear Society standard 51.1/Nl8.2-1973 (Reference 2) describes example 15 of a condition II event as a "minor reactor coolant system leak which would not prevent orderly reactor shutdown and cooldown assuming makeup is provided by normal makeup systems only." In Reference 2, normal makeup systems are defined as those systems normally used to maintain reactor coolant inventory under respective conditions of startup, hot standby, power operation, or cooldown, using onsite power. Since the cause of the water relief is the ECCS flow, the magnitude of the leak will be less than or equivalent to that of the ECCS (i.e., operation of the ECCS maintains RCS inventory during the postulated event and establishes the magnitude of the subject leak). Therefore, the above example of a Condition II event is met."
- P. Al.77-1 (dated December 1992): N18.2 is mentioned in a discussion of RG 1.77 and control rod ejection accidents (that they are a faulted condition as defined in N18.2 ).
- P. 15.0-13, Section 15.0.8 on plant systems and components for accident mitigation: "In determining which systems are necessary to mitigate t he effects of these postulated events, the classification system of ANS1-N18.2-1973 is utilized."
- P. 15.4-13, Section 15.4.3.l on RCCA misoperation: "Thus, consistent with the philosophy and format of ANSI N18.2, the event is classified as a Condit ion Ill event. By definition "Condition 111 occurrences include incidents, any one of which may occur during the lifetime of a particular plant," and "shall not cause more than a small fraction of fuel elements in the reactor to be damaged ... ""
Braidwood 2000 FSAR is only on CD in the File Center. so I can go get it.
Re 50.59s:
Braidwood 2002 50.59 report (ML023610638) - publicly available
- Part 1 of 2, p.129* 130 of PDF, effective date 7/11/00: UFSAR change package #DRP 8-190 to the Byron/Braidwood UFSAR revised the description in Chapter 15, Section 15.5.1 "Inadvertent Operation of Emergency Core Cooling System During Power Operations" to remove statements that operator action will be taken to manually open the Pressurizer Power Operated Relief Valves (PORVs). The transient description will be revised to indicate that if the Pressurizer PORVs are not available, the Pressurizer Safety Relief Valves ( PS RVs) will lift to relieve pressure initially releasing steam followed by subcooJed water. The existing discussion of the Pressurizer Overfill case will be deleted.
- Part 2 of 2, p.105-106 of PDF, dated 2002: UFSAR Change Package #DRP 9-075 revises the evaluation methodology for the Loss Of Offsite Power (LOOP) event (UFSAR Section 15.2.6) to incorporate water relief through the Pressurizer Safety Valves. This DRP is applicable to Byron and Braidwood Stations Units 1 and 2 ....
An additional evaluation was performed that concluded the Safety Valves will not be damaged by the water relief (Westinghouse letter LTR-SEE-01-287) .... This activity is not considered a departure from a method of evaluation described in the UFSAR because the new methodology (Water relief through the Pressurizer Safety Valves) has been approved by the NRC for a similar event for Byron and Braidwood Stations as part of the Power Uprate Safety Evaluation Report.
Parallel Byron 2003 50.59 report (ML031631016) -publicly available
- p.120-121, effective date 12/22/00: This purpose of this UFSAR change was to revise the description in Chapter 15 Section 15.5.1, "Inadvertent Operation of Emergency Core Cooling System During Power Operations", to remove statements that operator action will be taken to manually open the pressurizer power operated relief valves (PORVs). The transient description is revised to indicate that if the pressurizer PORVs are not available to open to relieve pressure then the pressurizer safety relief valves {PSRVs) will lift to relieve pressure initially releasing steam followed by subcooled water to mitigate the pressurizer overfill portion of the transient. The effect of the proposed activity will be an updated licensing basis and an updated operations procedure that will reflect the updated licensing basis .... Utilizing the relief valves may result in some degradation and the possibility that the valves may not fully reseat. The probability of the relief valves failing open due to water service application was previously evaluated in the SER for NUREG-073 7, Item 11.D. l. Thus, the change is bounded by the previously evaluated SER and does not increase the probability of occurrence or the consequences of an accident or a malfunction of equipment important to safety .... For analysis purposes, the PORVs are assumed to not be available for mitigation of the inadvertent operation of ECCS during power operation accident. However, current Technical Specifications requires that "Each PORV and associated block valve shall be OPERABLE" during Modes 1, 2, and 3 (LCD 3.4.11)."
- p.136-137, effective date 7/ 11/00: same topic as 1§! Braidwood item
- p.161-162, dated in 2002: same topic as 2"d Braidwood item My earlier notes from 50.59s on microfiche- I can go print - these were from the timeframe when PORVs were going to be credited.
- 3/18/94 - (78728:302) change M6-1/2-88-003 - safety-related power to safety-related relays for PORVs to enable manual control during a loss of offsite power
- 3/31/97 (92355:157) - draft revision package 6-013 - reanalysis of IOECCS, conservative analysis of overfill scenario, remains isolable when ECCS terminated, PORVs allow relief and prevent pressurizer from filling ( 1 PORV adequate); DNB limits met; water through safeties precluded by relief through PORVs
- 3/31/99 - (A7530:247) change GG-98-0167 - changes to TRM Section 3.4 on Reactor Coolant Systems, justification for automatic PORV actuation to mitigate pressurizer overfill during spurious SI at power Other documents I came across:
- 2004 version ofTechnical Requirements Manual (similar format to TS but not part of license) has TLCO 3.4.d saying one PORV must be unisolated and capable of responding in automatic, or the plant must shut down in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. (ML051660238, p.151 of PDF)- Same in 2014 submittal (ML14363A504)
- 2004 version of TS bases talks about PO RVs and PSVs in the discussion of pressurizer pressure limits (ML051660226, p.35-36), then says this on p.181: HThe Pressurizer Water level-High trip Function provides a backup signal for the Pressurizer Pressure-High trlp and also provides protection against water relief through the pressurizer safety valves. These valves are designed to pass steam in order to achieve their design energy removal rate. A reactor trip is actuated prior to the pressurizer becoming water solid." The pressurizer and PSV/PORV specific items start on p .385 of the PDF.
From: Spencer, Michael Sent: Wednesday, August 17, 201611:21 AM 2
To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <~teven.West@nrc.gov>; Scarbrough, Thomas
<Thomas. Sea rbrough@nrc.gov>; Clark, Theresa <Theresa. Cla rk@nrc.gov>
Subject:
Containment Contamination Argument
- All, Section 3.1.2.2 of the 2015 Backfit states:
The licensee has not addressed the questions of how long it would take to clean up a contaminated containment, and whether the time required for completing the cleanup effort and repairing or replacing any damaged PSVs could be long enough to delay the plant's return to operation beyond the short period that is implied in the UFSAR, Chapter 15.5.1.3, definition of Condition II events.
Therefore, the "short period" standard is "implied" in UFSAR Section 15.5.1.3. The Backfit doesn't mention any specific revision of the UFSAR, so I assume it is the current one. This makes sense because it is the current FSAR revision that is currently applicable to the licensee. The Backflt doesn't raise the issue of an inappropriate 50.59 change, and if there were such an inappropriate change, this would be an enforcement matter. not a backfit matter. Therefore. although we discussed the 2000 FSAR, I looked at the 2015 FSAR.
I looked at the 2015 UFSAR for Byron and Braidwood. We talked about the 2000 version, but on further reflection, I think the 2015 version is the one to examine because the ANS standard is not a requirement and could only be a current applicable standard for Byron and Braidwood to the extent discussed in the latest FSAR. The existing or appropriateness of previous 50.59 changes is a separate matter.
looking at the 2015 FSAR, I found no evidence in Chapter 1 (which has an incorporated by reference (IBR) section) or in Chapter 15 that the ANS standard is IBR'd. Even so, it is possible that somewhere in the 758 page Chapter 15. there is a statement along the lines of "Activity X is accomplished in accordance with the ANS standard," which would import the portions of the ANS standard applicable to Activity X. Still. the Backfit doesn't reference the ANBS standard directly, but instead references FSAR Section 15.5.1.3. That FSAR section in its entirety is as follows:
15.5.1.3 Radiological Consequences There are only minimal radiological consequences associated with inadvertent ECCS operation. The reactor trip causes a turbine trip and heat is removed from the secondary system through the steam generator power relief valves or safety valves. Since no fuel damage is postulated to occur for this transient. the radiological consequences associated with an atmospheric steam release from this event would be less severe than the steamline break event analyzed in Subsection 15.1.5.3.
Water relief from the pressurizer PORVs and safeties may result in overpressurization of the pressurizer relief tank (PRT), breaching the rupture disk and spilling contaminated fluid into containment. The radiological releases (offsite doses) resulting from breaking the PRT rupture disk are limited by isolation of the containment.
Maybe engineers can read more into this than I can, but I see nothing implied here that implies a short period for the plant's return to operation.
Michael Michael Spencer Senior Attorney U.S. Nuclear Regulatory Commission Office of the General Counsel Office: 015-A18 3
Mail Stop: 016-F3 Washington, DC 20555-0001 Phone: 301-287-9115 Fax: 301-415-3725 Michael. $pencer@nrc.gov 4
From: Scarbrough. Thomas Sent: Thursday, August 18, 2016 11:15 AM To: Holahan. Gary Cc: West, Steven; Spencer, Michael; Clark, Theresa
Subject:
RE: THE REPORT
- Gary, This afternoon, 1plan to send to the Panel a markup o f the report incorporating my assignments from yesterday's meeting.
Thanks.
Tom From: Holahan, Gary Sent: Thursday, August 18, 201611:11 AM To: Clark, Theresa <Theresa.Clark@nrc.gov>
Cc: West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Spencer, Michael
<Michael.5pencer @nrc .gov>
Subject:
THE REPORT
- Theresa, I'm OK with Steve*s edits.
Can we discuss exactly what pieces are needed to get to a final-final report?
Gary
From: Clark, Theresa Sent: Thursday. August 18, 2016 6:37 PM To: Spencer, Michael
Subject:
Re: 2016 Backfit Panel Tom discussion of NRR issues 2016 08 18 Gary MAS.docx Thanks, I'll feed them in tomorrow.
On: 18 August 2016 18:30, "Spencer, Michael" <Michael.Spencer@nrc.gov> wrote:
My comments on top of Gary's.
From: Clark, Theresa Sent: Friday. August 19. 2016 12:44 PM To: Spencer, M ichael
Subject:
RE: I'm out of the document Thankst I'm headed back in ...
From: Spencer. Michael Sent: Friday, August 19, 2016 12:40 PM To: Clark, The resa <lheresa.Clark@nrc.gov>
Subject:
I'm out of the document
From: Holahan, Gary Sent: Friday, August 19. 2016 4:36 PM To: Clark, Theresa; West, Steven; Scarbrough, Thomas; Spencer, Michael
Subject:
Re: current memo/ report files Thanks Theresa ... I'm following the edits. Looks like it getting\ cry close. I'm just seeing a few words I'd like to edit... or think about Gary On: 19 August 2016 15:29, "Clark. Theresa" <Thercsa.Clark~',nrc.gov> wrote:
Hi all - I'm still working through the report file (made it to the pink highlight on p.29) but I know Steve wanted to bring a copy on the plane so I'm sending them now just in case. Before you (likely) start work on Monday, you'll have updated versions of the files that should be good for final comments and informal concurrence. We'll do formal concurrence and signature next week.
These versions include everyone' s edits/comments. combined with my editing. The most significant cha nges I made were some restructuring in 3.12 (former 2.12) and the addition of a new short section 2 per Steve's suggestion. I didn't track them because the tracking was getting out of hand, and at this point we might do best to do a clean read anyway.
(I can construct compare files if anyone really wants them.)
Thanks! More to come!
Theresa Valentine Clark Executive Technical Assistant (Reactors)
U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov I 301-415-4048 I 0-16E22
From: Clark, Theresa Sent: Friday, August 19. 2016 5:22 PM To: Spencer, M ichael; Holahan, Gary; West Steven; Scarbrough, Thomas
Subject:
Re: Backfit Appeal Panel Report (MASTER) - 2016-08-19 MAS.docx Thanks much. I'll incorporate and resend.
On: l 9 August 2016 17: 16, "Spencer, Michael" < Michael.Spencer@nrc.gov> wrote:
I have some comments through appendix A on the latest version distributed this afternoon. I think we are getting pretty close.
Michael
From: Clark, Theresa Sent: Sunday, August 21, 2016 8:17 AM To: West, Steven; Holahan. Gary; Scarbrough. Thomas; Spencer. Michael
Subject:
Re: REVIEW: informal concurrence version of panel report Thanks much. Looking forward to your comments.
Agree that it'll probably be public... That's one of my remaining concerns. the few non-public documents we referenced. Wc can discuss next week.
When docs busi ness d ose on a Sunday?:)
On: 21 August 2016 07:20, "Wci;t. Steven" <Steven.Wcst(l£nrc.gov> \\.T Oie:
Thanks Theresa. J've been reviewing Friday's version. About 80 percent completed. I have some corrections and editorial suggestions. I expect to be done by COB today. I think I'll also have a recommended addition to the memo re RIS 2005*29 and it's revision. I'll send to all when completed.
Did we decide that we don't need to address why the previous appeal review panel got this wrong?
From the UWC and NSIAC meetings last week, there is heightened industry interest in where we are going to come out on this. We should plan on our report being made publicly available.
Steve
-*-*** ** Origi na I Message ********
From: "Clark, Theresa" <Theresa.Clark@nrc.gov>
Date: Sun, August 21 , 2016 12:06 AM *0400 To: "Holahan, Gary" <Gary.Holahan@nrc.gov> , "West, Steven" <Steven.West@nrc.gov>, "Scarbrough, Thomas"
<Thomas.Scarbrough@nrc.gov>, "Spencer, Michael" < Michael.Spencer@nrc.gov>
Subject:
REVIEW: informal concurrence version of panel report Hi all-attached are the cover memo (no change since the last version, I think) and report (both clean and with changes tracked to the last version I sent - not since the beginning). I incorporated the edits that Michael sent Friday.
I recommend that you guys read these and send any remaining edit s/comments by mid-day Tuesday-consider this informal concurrence. Then 1can give another look before we have the meeting with Vic. Shortly thereafter I assume w e would be able to sign an official copy. (Somewhere in t here I w ill ask Patti to make a concurrence package.)
Thanks!
Theresa Valentine Clark Executive Technical Assistant (Reactors)
U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov \ 301*4 15*4048 I 0 *16E22
From: Clark. Theresa Sent: Sunday, August 21. 2016 9:02 PM To: West Steven; Holahan, Gary Cc: Spencer, Michael; Scarbrough, Thomas
Subject:
Re: My comments on Friday's clean master I'll set something up in the morning (and incorporate your ~ommcnts). Tuesday should work.
On: 21 August 2016 19:35, "West, Steven" <Stcven.Wcst(!L.nrc.gov> wrot e:
Any thoughls on mce1ing again before Wed'.'
From: Holahan. Gary Sent: Monday. August 22. 2016 7:17 PM To: Spencer, M ichael; West, Steven: Scarbrough, Thomas; Clark, Theresa
Subject:
RE: Backfit Appeal Panel Report (MASTER)
- 2016-08-22 R2 - MAS I just added my comments to Tom*s.
Gary From: Spencer, Michael Sent: Monday, August 22, 2016 6:19 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
Backfit Appeal Panel Report (MASTER) - 2016-08-22 R2 - MAS Ari, attached are my comments on the document Theresa emailed out 20 minutes ago. I incorporated all of Steve's/Tom's/Theresa's edits, so any edits in the attached are mine.
Michael
From: Clark. Theresa Sent: Tuesday, August 23. 2016 7:04 AM To: Spencer. Michael; Holahan. Gary; West Steven; Scarbrough, Thomas
Subject:
RE: Bac\cfit Appeal Panel Report (MASTER)
- 2016-08-22 R2 - MAS Thanks-I got all of these in the master and will bring copies (including any other edits sent in the next couple of hours) to our meeting for discussion .
From: Spencer, Michael Sent: Monday, August 22, 2016 6:19 PM To: Holahan, Gary <Gary.Holahan@nrc .gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
Backfit Appeal Panel Report (MASTER) - 2016-08-22 R2
- MAS All, attached are my comments on the document Theresa emailed out 20 minutes ago. I incorporated all of Steve's/Tom's/Theresa's edits, so any edits in the attached are mine.
Michael
From: Clark, Theresa Sent: Tuesday, August 23, 2016 9:25 AM To: West, Steven Cc: Holahan, Gary; Scarbrough, Thomas; Spencer. Michael
Subject:
RE: Comments on NRR appeal review Thanks much-got these in, and working on another item just discussed with Gary {we'll talk about it at 10:00). Also finishing some cleanup items. I have the abbreviations done © .
From: West, Steven Sent: Tuesday, August 23, 2016 8:02 AM To: Clark, Theresa <Theresa.Clark@nrc.gov>
Cc: Holahan, Gary <Gary. Holahan@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Spencer, Michael
<Michael.Spencer@nrc.gov>
Subject:
Comments on NRR appeal review
- Theresa, This version includes the changes I added to try to address my comment about the NRR appeal review. These changes are on pages 2 through 5. What I don't know is if the NRR review panel's report is publically available or not. If not, we may not want to mention it in this report as I suggested. And, if we don't mention it, we would need to revise some of my language to only refer to the letter back to the licensee.
Steve Steven West, Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov
Subject:
backfit appeal panel meeting location: EDO-OWFN-l 7Hl4-14p Start: Tue 08/23/ 2016 10:00 AM End: Tue 08/ 23/2016 11:00 AM Recurrence: (none)
Meeting Status: Accept ed Organizer: Clark. Theresa Required Attendees: Holahan. Gary; West. Steven: Scarbrough. Thomas: Spencer, Michael As discussed via email, to prep for the meeting with Vic and understand any other remaining items.
From: Clark, Theresa Sent: Tuesday, August 23, 2016 1:05 PM To: Spencer. Michael
Subject:
Re: Spencer Comments on Backfit Appeal Report References 23-16.docx Thank you! I appreciate the extra set of eyes.
On: 23 Au!,'USt 2016 13:03. "Spencer, Michael" <Michacl.Spcncer(t~nrc.gov> wrote:
Theresa, I did a typo review of the references and abbreviations and have a few comments, attached, on the references.
Michael
Subject:
Backfit Appeal Panel Meeting Location: 0 - 1784 Start: Wed 08/ 24/ 2016 11:00 AM End: Wed 08/ 24/ 2016 11:30 AM Recurrence: (none)
Meeting Status: Accepted Organizer: Holahan, Gary Required Attendees: West, Steven; Scarbrough, Thomas; Spencer, Michael; Mccree, Victor; Clark, Theresa Optional Attendees: Johnson, Michael; ConferenceRoom01784 Resource Scheduled by Psprogeris 8/11 / 16 POC: Theresa Clark
_J REQUEST: bad:fit apptaJ panel ...
From: (\ark, Theresa Sent: Thursday, August 11, 2016 1:04 PM To: Sprogeris. Patricia Cc: Holahan, Gary; West. Steven: Scarbrough, Thomas; Spencer, Michael
Subject:
REQUEST: backfit appeal panel meeting w/ Vic
- Patti, Can you please arrange a meeting for the backfit appeal panel (Gary Holahan, Steve West, Torn Scarbrough, and Michael Spencer) with Vic? Mike may also wish to attend. The week of August 22 would be ideal, perhaps 11am 8/24 for half an hour if Gary and Steve can make that work (others are free). Otherwise, please work your magic to find a time. Thanks!
Theresa Valentine Clark Executive Technical Assistant (Reactors)
U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov I 301-415-4048 I 0-16E22
From: Sprogeris, Patricia Sent: Wednesday, August 24. 2016 1:43 PM Cc: Holahan. Gary; West. Steven; Scarbrough. Thomas; Spencer, Michael; Clark, Theresa
Subject:
FW: Backfit Appeal Review Panel Findings Associated with Byron & Braidwood I am so sorry, l forgot to put the cc's in hcforc hitting send. The package has been di spatched per hclow.
Thank you, Patti From: Sprogeris, Patricia Sent: Wednesday, August 24. 2016 1:41 PM To: RidsNrrOd Resource <RidsNrrOd.Resource@nrc.gov>; Correia, Richard <Richard.Correia@nrc.gov>; Mizuno, Geary
<Geary.Mizuno@nrc.gov>; l ewis, Robert <Robert.lewis@nrc.gov>; McGinty, Tim <Tim.McGinty@nrc.gov>; RidsNroOd Resource <RidsNroOd.Resource@nrc.gov>; Johnson, Michael <Michael.Johnson@nrc.gov>; Lubinski, John
<John.lubinski@nrc.gov>; Mayfield, M ichael <Michael.Mayfield@nrc.gov>; Tracy, Glenn <Glenn.Tracy@nrc.gov>;
RidsResOd Resource <Rid sResOd.Resource@nrc.gov>; RidsOgcMailCenter Resource
<RidsOgcMailCenter.Resource@nrc .gov>
Subject:
Backfit Appeal Review Panel Findings Associated with Byron & Braidwood Date: August 24. 2016 From: Gary \1. Holahan K. Steven West Thomas G. Scarhrough 7vtichacl A. Spcni.:cr Theresa Valentine Clark Yicw ADAMS P8 Properties \.1Ll92 36Al9~
Qnc11._ADA\i1~ P[J_>a~~a~Bi!c.:kfit Aiwcal Rc,*icw Pa,~l Findi1_1gs fJbT<.!.11 and B_raidwoo!l))
Thank you. Patti This package, and the five documents listed below, which are its contents, are publicly Patti Sprogeris available in ADAMS:
Assistant to Michael R. Johnson Office of the Executive Director for Operations ML16243A067 ML16236A202 301*41S-1713 ML16236A208 ML16214A199 ML16173A311
1 HES1 AVAILAHLE COPY From: Scarbrough, Thomas Sent: Thursday. September 08, 2016 6:27 AM To: Holahan, Gary; West. Steven; Clark, Theresa; Spencer, Michael ~
Subject:
RE: NRR Perspectives OEDO Bacldit Panel Findings.docx - Sent from L__J Thanks.
Tom From: Holahan, Gary Sent: Wednesday, September 07, 2016 11:11 PM To: West. Steven <Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Subject:
Fwd: NRR Perspectives OEDO Backfit Pane( Findings.docx - Sent from MaaS360 FYI let's wait for Vi<:'s direction heforc any further review or interaction with f',;RR .
I feel good ahout the review we did and the report too..
Gary From: "McCree. Victor" <.Yictor.;vlc('reclli_nrc.go\ > rbJ(6)
Subject:
Re: NRR Perspectives OEDO Backfit Panel Findings.docx - Sent from.__ _ ___.
Date: 07 September 2016 18:57 To: "Holahan, Gary" <Oary) loh.1haQ(!_{_nr~ o~:>
Thanks Gary. Please (re)encourage addressees to not share this response further. As you know, I did not solicit J\RR's most rt:ccnt response and. whi le I will acknowledge it in my final decision. I want to ensure we remain in process (to the extent practical)
Vic On: 07 September 2016 16:33, "Holahan, Gary" <Qa_Q.Hlllahanw nrc.go~> wrote:
Vic, You may find this useful.
Attached are Tom Scarborough 's written responses/answers to the latest NRR e-mail on the panel's report. They have only been shared with the panel. .. not NRR. Both Steve West and I agree that Tom has done a good Job in providing responses and context.
Although you have not asked the panel to review or respond to NRR's comments, and we have not done so formally, you may find Tom*s thoughts useful.
If we can provide any additional support to your review of the report. please Jet me know.
Gary
BK~1' AVAUABLE COPY From: Scarbrough, Thomas Sent: Wednesday, September 07, 2016 2:48 PM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa.Clark@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov> l(b)(S)
Subject:
RE: NRR Perspectives OEDO Backfit Panel Findings.docx - Sent from ._ __ __,
For your consideration, attached is my brief response to the specific items in the NRR Perspectives document.
Thanks.
Tom From: Holahan, Gary Sent: Tuesday, September 06, 2016 8:46 AM To: West, Steven <Steven .We..il@_nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@n
- * - - re .gov>;
- Spencer, .Michae I <Michael.Spencerln'lnrc~oH>
- * ~ (b)(6)
Subject:
RE: NRR Perspectives OEDO Backfit Panel Findings.docx - Sent from Thanks, Steve. We will keep you informed if anything happens. I do agree with you ... we don't need to be right about everything, NRR does!
From: West, Steven Sent: Tuesday, September 06, 2016 8:39 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough(a)nrc.gov>; Spencer, Michael <M ichael.Spencer nrc. v>
6 rml(b)(6)
Subject:
Re: NRR Perspectives OEDO Backfit Panel Findings.docx - Sent fro (bl( l
! and not available. Please proceed without me. I remain comfortable with our review, our conclusions and our recommendations. A few thoughts:
A surprisingly weak and uninspired defense of the backfit. An equally humdrum critique of the Panel's review and conclusions.
It may be better for Michael to address this, but it seems to me that one need find only one fatal flaw with the backfit to overturn it. The staffs argument that it considered numerous issues (as did the Panel) doesn't diminish the Panel's findings.
The staff and the panel seem to agree that not everything (guidance, interpretations, safety evaluations, etc.) has been clearly and consistently established and documented over time. We seem to differ on how new interpretations should be promulgated.
The backfit and the two staff responses to the Panel's review confirm the need for additional backfitting guidance and training.
Steve
Original Message --------
From: "Holahan, Gary" <GfilyJ:jolahan(ci)nre,gQY>
Date: Fri, September 02, 2016 12:04 PM -0500 To: "Clark, Theresa" <lheresa.Clark@nrc.g~>, "West, Steven~ <Steven. West,mnrc.gov>, "Scarbrough, Thomas"
<Ihomas.Scarbrough@nrc.gov>. "Spencer, Michael" <1".'tichael.S~ ncer~ nrc.gov>
CC: Michael Johnson l<bl(6) !'McCree, Victor" <Victor.McCree@nrc.gov>, "Tracy, Glenn"
<G/enn.Tracy@nrc.gov>
2
HES'I' AVAIIAlltE co1*v
~
Subject:
Re: NRR Perspectives OEDO Backfit Panel Flndings.docx
- Sent fromL___J I agree. [ think the ul timate decision is up to the EDO. Both the panel and ~ RR owe him a clear pit:turc of what agreeing with '.'JRR o r the panel means. Let's d iscuss early next week Gary On: 02 September 2016 12:06. "Clark. T heresa" <TI1crcsa.C~nrc.g0\ > wrote:
FY I. I believe most o f thi s was in the prc,*ious set o f comments. I do n't sec a lot related to the backlit standard an<l how these have been applied in the past or to B-'B.
Begin Forwarded Message:
From: "Dean Bill" < Bill.Dea1Va nrc.l!o,*>
Subject:
NRR Pcrspcdi ~s *OF.DO Back fit Panel Findings.docx - Sent from b)(6l EJ Date: 02 September 2016 11:20 To: "l'ic.\k(r.cct1inn.:,~,~" <V(c.\kCn.~~'a nn:.gov>. "Johnson. \i1ichacl"
<\1ichad .Johnson(a me.go,*>
Cc: "Holahan. <,ary" <~1;!fy. l lolal1_l11_1(cl nrc.g_l>\*>. "Clark. Theresa" <Then.::sa.C!ark~nrc.go,*>,
"McDc1111ou. Brian" < Brian.\1d)c11n\1tt(a nrc.gO\*>. "Evans. Mil.:hck"
<M!chc1',:.Evans(11 nrc.g~i,:>. "Lubinski. John" <John. Luh i1~ki.~c~~v>, "Ross-Lcc. \1aryJ ane"
<~arvJant:.Rtiss-Lcc!a nrc.gov>. "Taylor. Rohcrt" <Roht:rt.TaYlor1a nrc.gt~>
Vh.: ,md \1ikc Appreciate the opportunity to share with you NRR's pcrspcctin: related to the appeal panel's recommendations. Lnok forward to discussing with you after your vacation - hope it is an enjoyable one.
3
From: West. Steven Sent: Thursday. September 15. 2016 10:20 AM To: Clark. Theresa; Holahan. Gary; Scarbrough. Thomas; Spencer, Michael
Subject:
RE: backfit appeal documents signed Thank you for sharing , Theresa. Vic's safety and values messages in his memo to Bil! are especially nice.
Steve Steven West. Deputy Director Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission 301-287-3734 Steven.West@nrc.gov From: Clark, Theresa Sent: Thursday, September 15, 2016 10:00 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West @nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough @nrc.gov>; Spencer, Michael <Michael .Spencer@nrc.gov>
Subject:
FW: backfit appeal documents signed Good morning, all!
This morning, Vic signed the three documents associated with t he Byron/Braidwood backfit appeal. They are being processed now, and we eJ<pect that they (along with the panel documents referenced w ith in) will be made publicly available in ADAMS later today. Please let me know if you have any questions. Thanks!
- Letter responding to Exelon: ML16243A067
- Letter responding to NEI: M L1~246A1 50 Publicly Available in ADAMS
- Memo to NRR: ML16246A247 Theresa Valentine Clark EJ<ecutive Technical Assistant (React ors)
U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov I 301-415-4048 I 0 -16E22
From: Banks, Eleasah Sent: Friday. September 16. 2016 8:17 AM To: RidsNrrMailCenter Resource; RidsOgcMailCenter Resource; RidsNroMailCenter Resource: RidsResPmdaMail Resource; RidsResOd Resource; RidsNmssOd Resource; RidsRgnlMailCenter Resource; RidsRgn2MailCenter Resource; RidsRgn3Mai1Center Resource; RidsRgn4MailCenter Resource; RidsNrrDorlLpt3-2 Resource; RidsNrrPMByron Resource; RidsNrrPMBraidwood Resource; RidsNrrDss Resource; RidsNrrDe Resource; RidsNrrDpr Resource; RidsNrrDorl Resource; Garmoe, Alex; Keene. Todd; Gody, Tony; Gendelman, Adam; Mizuno. Beth; Correia, Richard; West, Khadijah; Bailey, Marissa; Scarbrough. Tho mas; Spencer. Michael; Clark, Theresa
Subject:
Appeal of Backfit Imposed in Braidwood and Byron Stations (To William Dean, From:
Victor McCree)
Da1e: September 15. 2016 Memorandum To: William M. Dean From: Victor M. McCree
Subject:
Appeal of Backfit Imposed in Braidwood and Byron Stations (To: William Dean, From: Victor McCree)
Publicly available in ADAMS View ADAMSP8 Properties \.1Ll6246A247 Qpcn ADAMS P8 OocumctH (Appeal of Bad.fit Imposed in Braidwood and Byron Stations (To: Willi'!m Dean.
[rom: Victor__,\_ 1crrcc_u
From: Banks, Eleasah Sent: Friday, September 16, 2016 9:07 AM To: RidsNrrMailCenter Resource; RidsOgcMailCenter Resource; RidsNroMailCenter Resource; RidsResPmdaMail Resource; RidsResOd Resource; RidsNmssOd Resource; RidsRgnlMailCenter Resource; RidsRgn2MailCenter Resource; RidsRgn3MailCenter Resource; RidsRgn4MailCenter Resource; RidsNrrDorlLpl3-2 Resource; RidsNrrPMByron Resource; RidsNrrPMBraidwood Resource; RidsNrrDss Resource; RidsNrrDe Resource; RidsNrrDpr Resource; RidsNrrDorl Resource; Garmoe, Alex; Keene, Todd; Gady, Tony; Gendelman, Adam; Mizuno, Beth; Correia, Richard; West, Khadijah; Bailey, Marissa; Scarbrough, Thomas; Spencer, Michael; Clark, Theresa
Subject:
Backfit Appeal Review Panel Findings (Byron and Braidwood)
Date: September 15, 2016 Memorandum To: J. Bradley From: Victor M. Mccree
Subject:
Backfit Appeal Review Panel Findings (Byron and Braidwood)
View ADAMS P8 Properties MLI 6236A 198 Open ADAMS PS Package (Backfit Appeal Review Panel Findings (Byron and Braidwood))
This package, and the following documents, which are its contents, are publicly available in ADAMS:
ML16243A067 ML16236A202 ML16236A208 ML16214A199 ML16173A311 1
from: Holahan, Gary Sent: Thursday. July 14. 2016 9:09 AM To: Spencer, Michael; Clark. Theresa Cc: West, Steven; Scarbrough. Thomas
Subject:
RE: Backfit panel Meeting Very good, thank you . I'm bringing a copy to the panel meeting!
from: Spencer, Michael Sent: Thursday, July 14, 2016 9:00 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Cc: West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>
Subject:
RE: Backfit panel Meeting Let me state this in writing to make it clearer and elaborate somewhat on my discussion with Theresa.
(b)(!l)
Michael From: Holahan, Gary Sent: Thursday, July 14, 2016 8:03 AM To: Clark, Theresa <Theresa.Clark@nrc.gov>; Spencer, M ichael <Michael.Spencer@nrc.gov>
Cc: West, Steven <Steven.West @nrc.gov>; Scarbrough, Thomas <Thomas.Scarbr ough@nrc.gov,>
Subject:
RE: Backfit pane! Meeting
excellent From: Clark, The resa Sent: Thursday, July 14, 2016 7:45 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; Spencer, Michael <Michael.Spencer@nrc.gov>
Cc: West, Steven <Steven .West@nrc.gov>; Scarbrough, Tho mas <Thomas.Scarbrough@nrc.gov>
Subject:
Re: Backfit panel Meeting Mkhael and I discussed this the other day so I know he's ready for il :).
On: 14 July 2016 07:42. " Holahan. Gary" <Gan .I lolahan 'm1 n:.gm > \.\Tote:
Michael, (b)(5)
Gary 2
From: Holahan, Gary Sent: Wednesday. August 10, 2016 10:59 AM To: Spencer. Michael; West, Steven; Scarbrough, Thomas; Clark, Theresa
Subject:
RE: Exelon Backfit Appeal Panel Preliminary Findings FOR COMMENT - ~
dt!t1Slu1\al - tnrernai rJRL Use Only -
OK, got it.
Thanks. Michael From: Spencer, Michael Sent: Wednesday, August 10, 2016 10:23 AM To: Holahan, Gary <Gary.Holahan@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Scarbrough, Thomas
<Thomas.Scarbrough@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
FW: Exelon Backfit Appeal Panel Preliminary Findings FOR COMMENT - 0 1:40 "On'IV"-
OGC's reactor and materials ruternaking {RMR) division has provided its input on the draft preliminary findings. See email below .
Michael From: Spencer, Mary Sent: Wednesday, August 10, 2016 10:19 AM To: Spencer, Michael <Michael.Spencer@nrc.gov>
Cc: Mizuno, Geary <Geary.Mizuno@nrc.gov>; Campbell, Tison <Tiso n.Campbell@nrc.gov>; Jones, Bradley
<Bradley.Jones@nrc.gov>; Benowitz, Howard <Howard.Benowitz@nrc.gov>; Gendelman. Adam
<Adam.Gendelman@nrc.gov>
Subject:
RE: Exelon Backfit Appeal Panel Preliminary Findings FOR COMMENT - 6 t1511'.e dccisio ..al l.. tc .. :al ~m 6i lsb!!
....Q.ali.;i.-
Michael.
(b)(5)
Thanks, Mary M ary B. Spencer Assistant General Counsel for Reactors and Materials Rulemakings Office of the General Counsel US Nuclear Regulatory Commission
From: Holahan, Gary Sent: Monday, August 01, 2016 5:57 PM To: Dean, Bill <Bill.Oean@nrc.gov>; Lubinski, John <John.Lubinski@nrc.gov>; Mcginty, Tim <Tim.McGinty@nrc.gov>;
Akstulewicz, Frank <Frank.Akstu/ewicz@nrc.gov>; Doane, Margaret <Margaret .Doane@nrc .gov>; M cdermott, Brian
<Brian. McDermott@nrc .gov>; Bailey, Marissa <Marissa.Bailey@nrc.gov>
Cc: Hackett, Edwin <Edwin.Hackett@nrc.gov>; West, Steven <Steven.West@nrc.gov>; Clark, Theresa
<Theresa .Clark@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Spencer, Michael
<Michael.Spencer@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; Williamson, Edward
<Edward.Williamson@nrc.gov>; Mizuno, Geary <Geary.Mizuno@nrc.gov>; Shuaibi, Mohammed
<Mohammed.Shuaibi@nrc.gov>; M ccree, Victor <Victo r.M cCree@nrc.gov>; Johnson, Michael
<Michael.Johnson@nrc.gov>; Tracy, Glenn <Glenn.Tracy@nrc.gov>; Gody, Tony <Tony.Gody@nrc.gov>
Subject:
Exelon Backfit Appeal Panel Preliminary Findings FOR COMMENT - 8 ~8f,e*detisi'7ftdl l11te. 11al 14" e l".lse Oilly (b)(5)
L
(b)(5)
J