MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 2024-02-02
[Table view] |
Text
September 15, 2016 J. Bradley Fewell Senior Vice President Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RESPONSE TO APPEAL OF BACKFIT IMPOSED ON BRAIDWOOD AND BYRON STATIONS REGARDING COMPLIANCE WITH 10 CFR 50.34(b),
GDC 15, GDC 21, GDC 29, AND THE LICENSING BASIS
Dear Mr. Fewell:
This letter responds to your June 2, 2016, letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16154A254). In that letter, you requested a second-level appeal of the subject backfit, which was issued by the U.S. Nuclear Regulatory Commission (NRC) staff in a letter dated October 9, 2015 (ADAMS Accession No. ML14225A871).
In response to your request and in accordance with the NRCs Management Directive 8.4, Management of Facility-specific Backfitting and Information Collection, I appointed several senior NRC staff and managers to constitute a Backfit Appeal Review Panel to review your appeal of the staffs determination that a backfit was necessary at Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, as well as the staffs application of the compliance backfit exception provided in Title 10 of the Code of Federal Regulations (10 CFR), Section 50.109 (the Backfit Rule).
The panel undertook a detailed review of the relevant information at issue, that is, information pertinent to the performance of pressurizer safety valves and their treatment during accident analyses which support licensing decisions. The panel also reviewed the compliance exception to the Backfit Rule and re-affirmed that the compliance exception is intended to address failures to meet known and established Commission standards because of omission or mistake of fact.
New or modified interpretations of what constitutes compliance therefore do not fall within the exception. The panel documented its review and evaluation of the technical and legal issues in a report enclosed with its memorandum to me. The panels memorandum and report are publicly available via ADAMS Accession Nos. ML16236A202 and ML16236A208, respectively.
I have reviewed the panels report, their recommendations, and their response to questions I posed when establishing the panel. In addition, I met with the panel and Office of Nuclear Reactor Regulation management to assure that this issue has been given thorough, technically sound, and legally well-founded consideration.
J. Fewell Based on my review and discussions, I agree with the panels conclusion that positions taken by the NRC staff in the 2015 backfit decision represent new and different staff views on how to address pressurizer safety valve performance following water discharge. Although these staff positions are conservative approaches that could provide additional safety margin, they do not provide an appropriate basis for a compliance backfit. In the absence of an assumed failure of the pressurizer safety valve to reseat, the concerns articulated in the backfit related to event classification, event escalation, and compliance with 10 CFR 50.34(b) and General Design Criteria 15, 21, and 29 are no longer at issue.
Sincerely,
/RA/
Victor M. McCree Executive Director for Operations Docket Nos. STN 50-456, STN 50-457, STN 50-454, and STN 50-455 cc: Listserv
J. Fewell Based on my review and discussions, I agree with the panels conclusion that positions taken by the NRC staff in the 2015 backfit decision represent new and different staff views on how to address pressurizer safety valve performance following water discharge. Although these staff positions are conservative approaches that could provide additional safety margin, they do not provide an appropriate basis for a compliance backfit. In the absence of an assumed failure of the pressurizer safety valve to reseat, the concerns articulated in the backfit related to event classification, event escalation, and compliance with 10 CFR 50.34(b) and General Design Criteria 15, 21, and 29 are no longer at issue.
Sincerely,
/RA/
Victor M. McCree Executive Director for Operations Docket Nos. STN 50-456, STN 50-457, STN 50-454, and STN 50-455 cc: Listserv DISTRIBUTION: OEDO-16-00585 PUBLIC RidsNrrPMBraidwood AGendelman, OGC RidsNrrMailCenter RidsNrrDss GMizuno, OGC RidsOgcMailCenter RidsNrrDe RCorreia, RES RidsResMailCenter RidsNrrDpr KSWest, NSIR RidsNroMailCenter RidsNrrDorl MBailey, NSIR RidsRgn3MailCenter AGarmoe, NRR TScarbrough, NRO RidsNrrDorlLpl3-2 TKeene, NRR MASpencer, OGC RidsNrrPMByron AGody, Region II TClark, OEDO ADAMS Accession No.: ML16243A067 *via e-mail OFFICE OEDO OGC OEDO OEDO NAME GHolahan MZobler (NLO) MJohnson VMcCree DATE 08/31/16 09/12/16 08/31/16 09/ 15 /16 OFFICAL RECORD COPY