ML18012A802

From kanterella
Jump to navigation Jump to search
LER 97-023-02:on 961114,design Deficiency Was Identified in Emergency DG Protection Circuitry.Caused by Inadequate Plant Design.Revised Surveillance Test Procedures OST-1013 & OST-1073.W/970606 Ltr
ML18012A802
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/06/1997
From: Donahue J, Johnny Eads
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-127, LER-97-023, LER-97-23, NUDOCS 9706170003
Download: ML18012A802 (10)


Text

CATEGORY REGULATOZ INFORMATION DZSTRIBUTZO YSTEM (RZDS)

C4 ACCESSION NBR:9706170003 DOC.DATE: 97/06/06 NOTARIZED: NO DOCKET FACIL:50-z)00 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH:NAME AUTHOR AFFILIATION EADS,J. Carolina Power & Light Co.

DONAHUE,J.W. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION h

SUBJECT:

LER 97-023-02:on 961114,design deficiency was identified in emergency DG protection circuitry. Caused by inadequate plant C design. Revised surveillance test procedures OST-1013 &

OST-1073.W/970606 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES 0 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEYEV 1 1 R INTERNAL: ACRS 1 1 2 2 AEOD/SPD/RRAB 1 1 Z 1 1 NRR/DE/ECGB 1 1 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB . 1 1 NRR/DSSA/SRXB 1 1 RES/DET/EIB 1 1 RGN2 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE,J H 1 1 NOAC POOREiW. 1 1 NOAC QUEENER,DS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 I FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

Carolina Power R Light Company Harris Nuclear Plant PO 8ox 165 New Hill NC 27562 JUN -6 1997 U.S. Nuclear Regulatory Commission Serial: HNP-97-127 ATTN: NRC Document Control Desk 10CFR50.73 Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 LICENSEE EVENT REPORT 96-023-02 Sir or Madam:

In accordance with Title 10 to the Code of. Federal Regulations, the enclosed revision to Licensee Event Report 96-023 is submitted. This revision provides additional information related to the design deficiency identified in the Emergency Diesel Generator protection circuitry.

Sincerely, J. W. Donahue Director of Site Operations Harris Plant JHE Enclosure Mr. J. B. Brady (HNP Senior NRC Resident)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. N. B. Le (NRC - NRR Project Manager)

'7706i70003 970606 PDR ADQCK 05000400 S PDR llllllllllllllllllllllllllllllllllilllll State Road 1134 New Hill NC

0 U. S. Nuclear Regulatory Commission Document Control Desk / HNP-97-127 Page 2 of 2 CC: Mr. T. C. Bell Mr. H. K. Chernoff (RNP)

Mr. B. H. Clark Mr. G. W. Davis Ms. J. P. Gawron (BNP)

Mr. H. W. Habermeyer Mr. W. J. Hindman Ms. C. W. Hobbs (HEEC)

Mr. W. D. Johnson Mr. R. M. Krich Mr. M. B. Keef (HEEC)

Ms. W. C. Langston Mr. C. W. Martin (BNP)

Mr. R. D. Martin Mr. J. W. McKay Mr. P. M. Odom (RNP)

Mx. W. R. Robinson Mr. G. A. Rolfson Mr. R. F. Saunders Mr. C. N. Sweely Mr. D. L. Tibbitts Mr. M. A. Turkal (BNP)

Mr. T. D. Walt Mr. R. L. Warden (RNP)

HNP Real Time Training INPO Harris Licensing File Nuclear Records

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 (4OSI EXPIRES 04/30/96 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THLS MANDATORY INfORMATION COllECTION REQUEST: 5LO HRS. REPORTED LESSONS lEARNED ARE LICENSEE EVENT REPORT (LER) UICORPORATEO UITO THE UCENSING PROCESS AND fEO BACK TO UIOUSTRY.

FORWARD COMMENTS REGAROLIG BURDEN ESTIMATE TO THE INfORMATION AND RECORDS MANAGEMENT BRANCH IT B f33l US. NUCIEAR REGUIATORT COMMSQOIL (See reverse for required number of WASHUIGTOIL OC 205550001, ANO TD THE PAPERWORK REDUCTION PROJECT (3150.

digits/characters for each block) OI04l, Off)CE OF MANAGEMENT ANO BUDGET, WASHUIGTON, OC 205IXL FAGIUTY NAME lt) DOCKET NUMOER I2) PAGE I3)

Harris Nuclear Plant Unit-1 50-400 1 OF3 TITLE (4)

Design deficiency in Emergency Diesel Generator protection circuitry.

EVENT DATE l5) LER NUMBER (6) REPORT DATE (7) OTHER FACILITIES INVOLVED (8)

FACIUTY NAME DOCKETNUMBER SEQUENTIAL REYISION MONTH DAY MONTH DAY NUMBER NUMBER 05000 FACIUTY NAME DOCKET NUMBER 11 14 96 96 023 02 06 06 97 05000 OPERATING THIS REPORT IS SUBMITTED PUR SUANT TO THE REQUIREMENTS OF 10 CFR %: (Check one or morel (11)

MODE (9) 20.2201 (b) 20.2203(a)(2) (v) 50.73(a)(2) (i) 50.73(a)(2) (viii)

POWER 20.2203la)(l) 20.2203(a) (3)(i) 50.73la)(2) lii) 50.73(a) (2)(x)

LEVEL (10) 100% 20.2203(a)(2) (i) 20.2203(a) (3)(o) 50.73(a)(2)(iii) 73.71 20.2203(a) (2)(ii) 20.2203(a) (4) 50.73(a) (2) (iv) OTHER 20.2203(a) (2) (iii) 50.36(c) (1) 50.73(a) (2) (v) Specify in Abstract below or in NAC Form 3BBA 20.2203(a) (2) (iv) 50.36(c) (2) 50.73(a) (2) (vii)

LICENSEE CONTACT FOR THIS LER (12)

TELEPHONE NVM8ER Oodude Ates Code)

Johnny Eads Project Engineer - Licensing (919) 362-2646 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DES CRIBED IN THIS REPORT (13)

REPORTABLE REPORTABLE CAUSE SYSTEM COMPONENT MANUFACTURER CAUSE SYSTEM COMPONENT MANUFACTURER TO NPRDS TO NPRDS SUPPLEMENTAL REPORT EXPECTED (14) EXPECTED MONTH DAY YEAR YES SUBMISSION (If yos, complete EXPECTED SUBMISSION DATE). X NO DATE (15)

ABSTRACT (Limit to 1400 spaces, l.o., approximately 15 single.spaced typewritten lines) (16)

On November 14, 1996, with the plant operating in Mode-1 at 100% power, a design deficiency was identified in the protection circuitry for the safety-related Emergency Diesel Generators (EDG). Section 8.3.1.1.2.14.g of the Harris Plant Final Safety Analysis Report (FSAR) states that "Protection is provided for the diesel generator and the safety related electrical system during periodic testing of the diesel generator coincident with a loss of off-site power by the voltage restrained over-current relay (51V) at the diesel generator feeder. This relay senses over-current due to overloading of the diesel generator in conjunction with reduction of voltage. The relay is arranged to trip the feeder breaker to the diesel generator."

During an engineering review resulting from NRC Generic Letter 96-01, the ability of the 51V relay to provide the described protection during a loss of off-site power (LOOP) event was questioned. Subsequent investigation concluded on December 4, 1996, that the relay would not provide this protection.

As a result of this condition, if a LOOP had occurred while the EDG was synchronized to the off-site electrical grid during periodic testing, the undervoltage relays for the safety-related 6.9 kV bus may not have actuated and the associated emergency sequencer would not have recognized the LOOP condition and sequenced the safety bus loads as required.

This condition was reported to the NRC on December 4, 1996 per 10 CFR 50.72 via the emergency notification system as operation outside the design basis of the plant. Immediate corrective actions included revising the applicable EDG test procedures to verify that stable grid voltage exists prior to paralleling and declaring the EDG inoperable during this testing. Additional corrective action included the design and installation of a modification to the EDG protection circuitry to return the system to its original functional design basis. The initial 10 CFR 50.73 LER was submitted on December 16, 1996. This revision provides additional information related to the deficient 51V relay configuration.

pc NRC FORM 366A US. NUCEEAR REGUIATORT COMMIssIOII H.96)

LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION FACIUTT NAME )I) OOCNET LER NUMRBI {6) PAGE g)

SEQUENTIAL RENSION TEAR NUMRER NUM8ER Shearon Harris Nuclear Plant - Unit ¹1 50400 2 OF 3 9S - 023 - 02 TEXT lip owo opooo N foqodod, oso oddaj'oool ropes of PVRC Pow 3RQ) (I 1)

EVENT DESCRIPTION:

On November 14, 1996, with the plant operating in Mode-1 at 100% power, a design deficiency was identified in the protection circuitry for the safety-related Emergency Diesel Generators (EDG). Section 8.3.1.1.2.14.g of the Harris Plant Final Safety Analysis Report (FSAR) states that "Protection is provided for the diesel generator and the safety related electrical system during periodic testing of the diesel generator coincident with a loss of off-site power by the voltage restrained over-current relay (51V) at the diesel generator feeder. This relay senses over-current due to overloading of the diesel generator in conjunction with reduction'of voltage. The relay is arranged to trip the feeder breaker to the diesel generator."

During an engineering review resulting from NRC Generic Letter 96-01, the ability of the 51V relay to provide the described protection during a loss of off-site power (LOOP) event was questioned. Subsequent investigation concluded on December 4, 1996, that the relay would not provide this protection. To simplify the discussion, the concern will be described for Division A of the onsite power system but is also applicable to Division B. To perform required Technical Specification surveillance testing of'the EDGs, it is necessary to connect an EDG in parallel with the off-site power system.

This is accomplished by connecting a running EDG to its associated safety bus (closing EDG output breaker 106) while the safety bus remains connected to its associated non-safety bus through the two tie breakers (104 and 105). The non-safety bus is connected to the off-site power system via either the Start-up Transformer or the Unit Auxiliary Transformer. This electrical distribution system configuration allows the EDG to assume the additional load required for testing.

In the original design, if an EDG was in the test mode,and a LOOP event occurred, the logic would have held the tie breakers between the non-safety bus (1D) and safety bus (1A-SA) closed with the objective of producing an overload condition on the safety bus while dragging the voltage down to allow operation of the bus undervoltage relay or the voltage controlled overcurrent relay (51V). The 51V is operational in the test mode only. The original EDG logic used the safety-related 6.9 kV bus undervoltage relays to detect a LOOP. The premise of the logic was that if the off-site power source was lost then the load on the diesel from connected loads would exceed of the EDG capacity and cause an undervoltage condition. To ensure that the connected load was large enough, the original logic inhibited, if the EDG was in the test configuration, the tripping of the 105 breaker by a LOOP detection relay (CRI/1748). However, if the available loading on the safety bus and non-safety bus did not exceed the capacity of the EDG, the UV on the safety bus (or the 51V) would not actuate and the sequencer would not receive a signal to perform its LOOP program. In summary, the evaluation of possible loading conditions revealed that the EDG would not respond as described in the FSAR when distribution system load was insufficient to actuate the 51V or UV relays.

During the root cause investigation of this event, documents were found which indicate that this condition was previously identified in September, 1986. However, no documentation of the final resolution of this condition could be located.

This condition was reported to the NRC on December 4, 1996 per 10 CFR 50.72 via the emergency notification system as operation outside the design basis of the plant. This condition was then reported in LER 96-023, dated December 16, 1996. Corrective actions identified at that time included declaring the EDG inoperable during periodic testing and entering the appropriate Technical Specification Action Statements. In addition, the EDG protection circuitry was modif)ed to provide protection from a LOOP during EDG load testing.

The EDG circuitry modification returns the onsite power system to its original functional design basis and minimizes the need for operator action if a LOOP occurs during EDG testing. This change also eliminates the need to declare the EDG inoperable during periodic testing. However, the modification required deviations from existing licensing commitments.

Specifically, the deviations included:

1) The use of non-class 1E equipment to provide inputs to a Class IE device in support of a safety function. The modification design takes credit for the response of the LOOP relay and its supporting power supply and inputs; and
2) The use of operator action as a contingency response in case the non-class 1E equipment fails to provide the automatic action.

NRC FORM 366A US. NUCtEAR REGUIATORT COMMISSION I4.9SI LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION FACIUTT NAME Il) OOCXET tER NUMBER (6) PACE gl SEOUENTIAt REVISION NUMBER NUMBER Si...". gellis Nuclear Plant ~ Unit ¹1 50400 3 OF 3 86 - 023 - 02 tEXT PY mvr st N neu<<E est <<RF6ml cop~ p/PIRC &m 3$ 64I till EVENT DESCRIPTION: (cont.)

Because of these deviations, the EDG protection circuitry modification was determined to be an Unreviewed Safety Question. The proposed change was submitted to the NRC in accordance with 10 CFR 50.59(c) and 10 CFR 50.90 on April 18, 1997. On May 8, 1997, the NRC issued HNP License Amendment No. 72 approving the changes to the EDG protection circuitry.

CAUSE:

This condition was caused by inadequate original plant design.

SAFETY SIGNIFICANCE:

There were no actual safety consequences associated with this event. However, the HNP Probabilistic Safety Assessment (PSA) was used to estimate the increase in core damage risk if the EDGs are assumed to be unavailable when operated in parallel with off-site power. The model includes events representing the EDG being unavailable.

The probability of the EDGs being unavailable was increased to account for an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per year per EDG.

The increase in annual core damage frequency was found to be less than one percent, which is not considered,to be risk significant in accordance with the EPRI PSA Applications Guide.

The HNP PSA model includes initiating events for a number of transients, such as reactor trip, turbine trip, loss of off-site power, and inadvertent safety injection. The model also includes various loss of coolant accidents, steam generator tube rupture, and ATWS scenarios. The calculated increase in annual core damage frequency of less than one percent represents the increased risk from the greater number of hours of the EDGs being unavailable. Operator action to return the EDG being tested to service is not credited. The change in core damage frequency includes the relative importance of the EDGs in mitigating the effects of the various scenarios included in the PSA.

This condition is being reported in accordance with 10 CFR 50.73.a.2.ii(B) as a condition that was outside the design basis of the plant.

PREVIOUS SIMILAR EVENTS:

There have been no previous deficiencies reported related to the design of EDG protection circuitry.

CORRECTIVE ACTIONS COMPLETED:

1. Surveillance test procedure OST-1013 (1A-SA EDG Operability Test - Monthly Interval) was revised on December 4, 1996.
2. Surveillance test procedure OST-1073 (1B-SB EDG Operability Test - Monthly Interval) was revised on february 17, 1997.
3. A modification to the EDG protection circuitry to return the system to its original functional design basis was installed and turnover completed on May 26, 1997 during Refueling Outage 7. Implementation of this modification included appropriate revisions to testing procedures and the Final Safety Analysis Report.

CORRECTIVE ACTIONS PLANNED:

None.