LER 91-017-00:on 910827,tech Spec Violation Occurred Due to Missed Composite Sample During Release of Secondary Waste Sample Tank.Caused by Personnel Error.Verified That Effluent Stream Contained No radioactivity.W/910925 Ltr
ML18010A397
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/25/1991
From: Richey R, Verrilli M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-910137-(O), LER-91-017-01, LER-91-17-1, NUDOCS 9110010101
Download: ML18010A397 (5)


Text

ACCELERATED DIS RIBUTION DEMONS ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9110010101 DOC.DATE: 91/09/25 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION VERRILLI,M. Carolina Power & Light Co.

RICHEY,R.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 91-017-00:on 910827,tech spec violation occurred due to missed composite sample during release of secondary waste sample tank. Caused by personnel error. Verify effluent stream D contained no radioactivity.W/910925 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR J ENCL t SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Application for permit renewal filed. 05000400 A D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 LA 1 1 PD2-1 PD 1 1 MOZAFARI,B. 1 1 INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB10 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPBll 2 2 NRR/DST/SELB 8D 1 1 NRR/DST/SICB8H3 1 1 NRR/DS APJB8Dl 1 1 NRR/DST/SRXB 8E 1 1 REG -LE=~2 1 1 RES/DSIR/EIB 1 1 RGN2i ILE 01 1 1 EXTERNAL: EG&G BRYCE,J.H 3 3 L ST LOBBY NARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1 NSIC POORE,N. 1 1 NUDOCS FULL TXT 1 1 D

A NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOil P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33

Carolina Power & Light Company P.O. Box 165 ~ New Hill, N.C. 27562 R. B. RICHEY Vice President Harris Nuclear Project

'SEP 2 5 1991 Letter Number: HO-910137 (0)

U.S. Nuclear Regulatory Commission ATTN: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 LICENSEE EVENT REPORT 91-017-00 Gentlemen:

In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted. This report fulfills the requirement for a written report within thirty (30) days of a reportable occurrence and is in accordance with the format set forth in NUREG-1022, September 1983.

Very truly yours R. B. Richey Vice President Harris Nuclear Project RBR:dmw Enclosure cc: Mr. S. D. Ebneter (NRC - RII)

Ms. B. L. Mozafari (NRC - RII)

Mr. J. E. Tedrow (NRC - SHNPP)

MEM/LER91-017/1/OS1 9110010101 910925 PDR AOOCl: 05000400 S PDR

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPAOVEO OMB NO. 31504)104 (64)B)

EXPIRESI 4/30/02 ESTIMATED BURDEN PER 4ESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FO4WARD LICENSEE EVENT REPORT {LER) COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPOATS MANAGEMENT B4ANCH (P530), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT l31500104), OFFICE OF MANAGEMENTAND BUDGET, WASHINGTON, DC 20503.

FAG)LITY NAME lll DOCKFl'UMBER (2) PA E 3 Shearon Harris Nuclear Power Plant Unit (!1 0 5 0 0 0 400 10FO 3

'"""'echnical Specification violation due to missed composite sample during release of Secondar Waste Sam le Tank.

EVENT DATE (5l LFR NUNlBFR LS) REPORT DATE l7) OTHER FACILITIES INVOLVED (6)

YEAR SEOVENTIAL REVrSION DAY YEAR FACILITY NAMES DOCKET NUMBER(SI MONTH DAY YEAR NVMBER NUMBER MONTH 0 5 0 0 0 9 1 0 1 7 0 0 24 91 0 5 0 0 0 THIS AFPORT IS SUBMITTED PUASUANT 7 0 THE RLOUIREMENTS OF 10 CFA (): /Chess one or mors OI the Iopowinp/ l11 OPERATING MODE (5) 20.402 (6) 20.405(cl 60.73(el(2((irl 73.71(BI POWER 20.405(e)(1)(I) 50.36(cl(1) 60.73( ~ )(2)(rl 73.71(cl LF. EL 20.405(e)(1)(B) 50.36(c) l2) 60.73(e l(2) (rill DTHEA Ispsciry In Aottrect

'~':$xr'.c ~ ~oIrrrsr hslorr ~ Ix/ Irr Text, hiIIC Porrrr 20.406lellll(ill) X 50,73(e) (2((ll 60.73(el(2) (rill)(A) 3BBA/

20A05(el(1) (0) 50.73(e I (2) I )

4 50.73( ~ ll2) lrliil(BI 20.405(e) (1 l(r) 50.73(el(2) (ill) 60.73( ~ ) (2 I (s I LICENSEE CONTACT FOR THIS I.ER (12I NAME TELEPHONE NUMBER rfichael Verrilli Regulatory Compliance Specialist AREA CODE 9 193 62- 23 03 COMPLETE ONE LINE FOR EACH COMPONENT FAILU4E DESCRIBED IN THIS 4EPOAT (13)

CAUSE SYSTEM COMPONENT MANVFAC.

TURER REPORTABLE TO NPADS Q~+~PS CAUSE SYSTFM COMPONENT MANVFAC TVRER EPORTABLE TO NPAOS

)NOPE:MI MA% hxi~%&S(s>!:

$j+gk)IIm57L4 SUPPLEMENTAL RFPORT EXPECTFD (14) MONTH DAY YEAR EXPECTED SU 6 MISSION DATE (15)

YES III ysr, complrrs EXPECTED SVBMISSIOII DATE/ NO ABsTRAGT ILImlt to tc(IO tpecst, I.s., spproximsrely tilresn tlnpls.specs typewritten h'nsr/ (16)

At 1607 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.114635e-4 months <br /> on 8/27/91, a continuous release from the Secondary Waste Sample Tank (SWST) was initiated. Technical Specifications 3.11.1.1 Table 4.11-1 Action 2.b requires a continuous composite sample proportional to the discharge flow rate from the SWST while conducting a continuous release. Site Chemistry personnel were notified at this time to start the composite sampler and adjust the flow rate corresponding to the release rate. The Chemistry Technician responsible for this action became distracted with other shift duties and did not initiate the required sample. The release was secured at 2345 hours0.0271 days <br />0.651 hours <br />0.00388 weeks <br />8.922725e-4 months <br /> and was discovered at this time that the sampler had never been started.

it The cause of this event was personnel error on the part of the Chemistry Technician due to not initiating a composite sample. Immediate corrective actions vere to verify that the effluent stream contained no radioactivity. This was confirmed by the fact that the SWST radiation monitor, which was functioning properly during the release, did not detect any abnormal activity levels.

Results of an iso'topic analysis that had been performed on this water prior to being transferred to the SWST vere also reviewed. These results also indicated no abnormal activity levels. Additional corrective actions will include a procedure revision and a review of this incident with applicable personnel.

NRC Form 366 (64)B)

NRC FORM 366A UA. NUCLEAR REGULATORY COMMISSION (6<9) APPROVED OMB NO. 31504104 EXPIRES: 4/30/92 LICENSEE EVE REPORT ILER) ES ATEO BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS TEXT CONTINUATION AND REPORTS MANAGEMENT BRANCH (P-530). U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, OC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500104). OFFICE OF MANAGEMENTAND BUDGET, WASHINGTON, DC 20503.

FACILITYNAME (I) DOCKET NUMBER (2)

LER NUMBER (6) PAGE (3)

YEAR SEQUENTIAL REVISION Shearon Harris Nuclear Power Plant NUMBER NUMBER Unit Ill TEXT It/mora Bpeca ir ntrrtrrNL IIJB ~ ttta'arMt tVRC Farm 366r(3) 112) 0 5 0 0 0 4 p p 9 1 0 1 7 00 02 0 3 EVENT DESCRIPTION:

At 1607 on 8/27/91, with the plant operating at 100% power, Radwaste Operations personnel were making preparations for a continuous release of the Secondary Waste Sample Tank (SWST). Plant Operating Procedure OP-120.01 requires notification of Chemistry personnel so the ISCO composite sampler can be started and the flow rate adjusted to the corresponding release rate. This notification was performed, but the chemistry technician responsible for this action became distracted with other shift duties and did not start the ISCO composite sampler.

At 2345 hours0.0271 days <br />0.651 hours <br />0.00388 weeks <br />8.922725e-4 months <br />, upon completion of the release, Chemistry personnel discovered this problem when the sample was to be secured.

CAUSE The cause of this event was personnel error on the part of the chemistry technician. Proper notification was made by Radwaste Operations but the technician became distracted with other shift duties and failed to initiate the composite sample.

SAFETY SIGNIFICANCE There were no safety consequences as a result of this event. This is based on the fact that the SWST radiation monitor was functioning properly during the release and did not detect any radioactivity in the effluent stream. In addition, an isotopic analysis was performed on the water just prior to transferring was present.

it into the SWST. This analysis also verified that no radioactivity Technical Specifications 3.11.1.1 Table 4.11-1 Action 2.b requires a continuous composite sample proportional to the discharge flow rate from the SWST while conducting a continuous release. The sample for this particular release was not collected and is therefore being reported in accordance with 10CFR50.73 (a)(2)(i)(B) as a Technical Specification violation.

One event similar to this was reported in LER ¹89-012.

NRC Form 366A (669)

IC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION BS) APPAOVED OMB NO. 31504))04 EXPIRES: 4/30/92 LICENSEE EVEh REPORT (LER) ES ATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50A) HAS. FORWARD TEXT CONTINUATION COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (F430). U.S. NUCLEAR RE GULATOAY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (31500104), OFFICE OF MANAGEMENTAND BUDGET. WASHINGTON, DC 20503.

FACILITYNAME (1) DOCKET NUMBER (2)

LER NUMBER (6) PAGE (3)

Shearon Harris Nuclear Power Plant YEAR ~ SEOVENTIAL ~.JS( REVISION

&65 NUMBER + / NVMSER Unit f/1 TEXT /// IIXVS 4PSCe /4 ISSvirsd, II>> Sdd/SBn4/ HRC Form 36643/ (17) o s o o o 40 09 1 017 0 0 0 3 oFO 3 CORRECTIVE ACTIONS:

Immediate Corrective actions were to verify that no radioactivity was present in the SWST effluent stream. This was confirmed by the fact that the SWST radiation monitor was functioning properly during the release and did not detect any abnormal activity levels. The results of an isotopic analysis performed on the water prior to its transfer into the SWST were also reviewed. This analysis indicated that no activity was present in the water.

Revise Operating Procedure (OP-120.01.02) to include an additional step that requires a Chemistry Technician's signature, stating that the composite sampler has been started and/or properly adjusted for the appropriate flow rate and that Radwaste Operations has been informed of this action.

The individual responsible for the error has been counseled. This event will also be reviewed with applicable Chemistry and Radwaste personnel to stress the importance of the composite sample and to inform them of the procedure revision described above.

EIIS CODE INFORMATION: N/A NR C Form 366A (6419)