ML18004B899

From kanterella
Jump to navigation Jump to search
LER 87-040-00:on 870630,discovered That Surveillance Interval for Calorimetric Exceeded.Caused by Personnel Error.Night Order Issued Instructing Personnel on Importance of Performing surveillances.W/870730 Ltr
ML18004B899
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/30/1987
From: Schwabenbauer, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-870477(O), LER-87-040, LER-87-40, NUDOCS 8708040119
Download: ML18004B899 (7)


Text

UL RY INFOR! IATIQN DISTR JTI SYSTEi j (RIDS>

ACCESSION NB%,: 9708040119 DQC. DATE: 87/07/30 NOTARIZED: NQ DOCKET FACIL: 50-400 She-ron Hav ris Nucleav Power Planti Unit 1 Carolina 05000400 AUTH, NAME AUTHOR AFFILIATION SCHWABENBAUER'arol ina Powev 5 Light Co.

WATSON'. A. Carolina Power 5 Light Co.

REC IP. NAME RECIP IENT AFFILIATION SUB JECT; LER 87-040-00: on 870630i ex c eed ed time intev va'I f ov calorimet- ic. Caused bg human ev ror. Night ov'dev issued instructing licensed personnel of need to be cognizant of specific time requir ements oF suv veillances. W/870730 1tr.

DISTRIBUTION 'COD': IE22D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: 50. 73 Licensee Event Repov t (LER) i Incident Rpti etc.

NOTES:Application f or permit v enewal filed. 05000400 RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 PD2-1 PD 1 1 BUCKLEY'S B 1 lNTERNAL: ACRS MICH.".LSQ!3 ACRS MOELLER 2 2 AEQD/DQA 1 AEOD/DSP/NAS 1 AEOD/DSP/RQ*B 2 AEOD/DSP/TPAB 1 1 DEDRQ 1 1 NRR I DEST/ADE 1 0 NRR/DEST!ADS 0 NRR/DEBT/CEB 1 1 NRR/DEST/ELB 1 1 NRR/DEST/ ICSB 1 NRR/DEST/MEB 1 NRR/DEST/MTB 1 1 NRR/DEST/PSB 1 NRR/DEBT/RSB 1 1 NRR/DEST/SGB 1 1 NRR/DLPG/HFB 1 1 r NRR/DOE*/EAB NRR/Dt PG/GAB 1 1 NR R /DR EP! RAB NRR/DREP/RPB 2 2 N. AS,' LRB 1 NRR/PMAS/PTSB 1 EG F 02 1 1 RES DEPY GI 1, 1 RES TELFQRj:i J 1 RES/DE/E I B 1 RGN2 F ILE 01 1 H ST LOBBY WARD '

EXTERNAL: EGhG GRQH 1 LPDR NRC PDR 1 1 NS I C HARP. I Si J NSIC MAYSi G 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 45 ENCL 43

~ ~

r, NRC Form 305 US. NUCLEAR REGULATORY COMMISSION

/84)3) APPROVED OMB NO. 31600104 EXPIRES: 8/31/SS LICENSEE EVENT REPORT ILER)

DOCKET NUMBER (2) PAGE 3I FACILITY NAME (I)

SHEARON HARRIS PLANT UNIT 1 0 5 0 0 0 4 0 0 1 DF 0 3 TITLE (4I EXCEEDED TIME INTERVAL FOR CALORIMETRIC EVENT DATE (5) LER NUMBER (0) REPORT DATE (71 OTHER FACILITIES INVOLVED (8)

MONTH DAY YEAR YEAR sEQUENTIAL REVS~ MONTH DAY YEAR FACILITYNAMES DOCKET NUMBER(s)

NUMSER i~vN NVMSER o 5 0 0 0 0 6 308 7 8 7 0 4 0 0 0 7 3 0 8 7 0 5 0 0 0 THIS REPORT IS SUBMITTED PURSUANT T0 THE REQUIREMENTS OF 10 CFR ()t /Check onr or morr ol the foiioryinP/ (11 OPERATING MOPE (8) ~

1 20.402(8) 20A05(c) 60,73(sl(2) (Iv) 73.7((8)

POWER 20A05( ~ l(1)(i) SOW(cl(1) 50.73(sll2)(vl 73.7((c)

LEYEL OTHER /Spicily ln Ahstrrct 0 5 0 20.405 ( ~ ) (I ) (ii) 60.30(cl(2) 50.73( ~ ) I2) Ir8)

OelowendIn Trit, NRC Form 20.405( ~ l(l l(iiil 50.73( ~ l(2)(i) 50.73( ~ ) (2)(riiil (A) BSSA/

20A05( ~ ) (Il(iv) 50.73( ~ l(2)(ill 50.73(s) (21(riii)(8)

. ':P' i v~...r 9 >:

~ ~

c . nn~4. 20.405(s) (I ) (vl 60.7 3( ~ l(2) (IIB 50.73( ~ ) (2) (i)

LICENSEE CONTACT FOR THIS LER (12)

NAME TELEPHONE NUMBER AREA CODE R. SCHMABENBAUER REGULATORY COMPLIANCE 9 19 62- 26 69 COMPLETE ONE I.INE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

MANUFAC EPORTABLE CAUSE SYSTEM COMPONENT MANUFAC. EPORTABLE I ..

CAUSE SYSTEM COMPONENT TVRER TO NPRDS TVRER TO NPRDS 4 .:9i... 1. 3 y

7F~4 giM~Xic o

8 r ~ X.o.og zgr34CA

)ErW&k SVPPLEMENTAL REPORT EXPECTED (14) MONTH DAY YEAR EXPECTED SUBMISSION DATE (15)

YES /ll yrs, compirti EXPECTED SUBMISSIOhl DATE/ NO ABSTRAcT ILimlt to /400 specrs, I.r., epproilmetriy Ilftrrn slnpir.speci typrwriNrn lines/ (10)

ABSTRACT The plant was operating in Mode 1 at 50 percent Reactor power on June 30, 1987. General Procedure (GP)-005, Power Operation, requires a heat balance to be completed at 50 percent power prior to increasing power to 100 percent.

The on-shift crew reviewed Operations Surveillance Test (OST)-1004, Power Range Heat Balance, which is to be performed every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, to see when the last calorimetric was performed. During the review, at 2120 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.0666e-4 months <br />, it was found a calorimetric had last been perfornied via OST-1004 on June 29 at 0750 hours0.00868 days <br />0.208 hours <br />0.00124 weeks <br />2.85375e-4 months <br />, and it was determined that the surveillance interval had been exceeded. A calorimetric was then immediately initiated and successfully completed at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />, exceeding the maximum time interval by approximately 8 hours.

No safety consequences resulted from this event as'he Nuclear Instrumentation agreed with the calorimetric when performed.

This event is being reported under 10CFR50.73(a)(2)(B) as a violation of Technical Specification 4.3.1.1 Table 4.3-1.

8708040ii9 870730 PDR ADOCK 05000400 8 PDR NRC Form 300

NRC Fond 366A V.S, NUCLEAR REGVLATOAY COMMISSION (94)3)

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVED OMB NO, 3) 50-0)04 EXPI A ES: 8/31/88 FACILITY NAME (ll OOCKET NUMBER (2) LER NUMBER (6) PAGE (3)

SEOVENTIAL:4gv I)EVISION YEAR gg NUMBEII +II<< NVMBEII SHEARON HARRIS PLANT UNIT 1 0 5 0 0 0 4 0 0 8 7 0 4 0 0 0 0 2 OF 0 3 TEXT //Fmd>> EPBce /4/Bduked, I/>> a//dd/M/NRC Fonrr 3%43) ()7)

DESCRIPTION:

The plant was operating in Mode 1 at SO percent reactor power on June 30, 1987. Plant operators were preparing to increase reactor power to 100 percent. General Procedure (GP)-005, Power Operation (Mode 2 to Mode 1),

requires a heat balance to be performed at approximately SO percent power prior to increasing power to 100 percent. The heat balance is required only if the turbine was shut down for longer than with 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The calorimetric data the power range nuclear from the heat balance is used for comparison instruments to ensure the accuracy of the power range instrumentation.

Technical. Specification 4.3.1.1 Table 4.3-1 requires a daily surveillance test be performed to compare power range nuclear instruments to a calorimetric.

This is completed per Operations Surveillance Test (OST)-1004, Power Range Heat Balance.

When operations personnel reached the step in GP-005 which requixes the calorimetric be performed, they began a review of OST-1004 to determine if one had been performed in the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; this would eliminate the need to perform another calorimetric for GP-005. During the review, it was found that the last performance of OST-1004 was on June 29 at 0750 hours0.00868 days <br />0.208 hours <br />0.00124 weeks <br />2.85375e-4 months <br />. At 2120 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.0666e-4 months <br />, it was determined that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance interval, including the 25 percent maximum allowable surveillance extension, had been exceeded. A calorimetric was then immediately initiated and successfully completed at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />, exceeding the maximum time interval by 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and 20 minutes.

CAUSE The cause of the event was human error. The control room staff inadvertently missed the daily required surveillance as they were waiting for the plant to stabilize in power prior to performing the test. It has been determined that the control room staff is well aware of their daily requirements and that this is an isolated incident.

ANALYSIS No safety consequences resulted from this event as the comparison of the calorimetric to the power range nuclear instruments showed they were within acceptable tolerance.

This event is being reported under 10CFR50.73(a)(2)(B) as a violation of Technical Specification 4.3.1.1 Table 4.3-1.

NRC'FORM 366A *V.S.GPO:IBBB.O 824 538/455 014)3)

NRC Form 306A U.S. NUCLEAR REGULATORY COMMISSION (84)3) 8 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVEO OMB NO. 3150-0104 EXPIRES: 8/31/88 FACILITY NAME (1) OOCKET NUMBER (2) LER NUMBER (6) PAGE (3)

SHEARON HARRIS PLANT

  • YE*R $ Q? SEQUENTIAL ?'@$

$ 8?IS NUMBER REVISION I'34( NUMBER UNIT l o s o o o4 00 87 04 0 00 0 3 QF 0 TEXT /// more <<>>o>> /4 /r//rker/ I/ee (SE/Oono/N/IC %%drm 3554'4/ (IT)

CORRECTIVE ACTION A Night Order has been issued instructing licensed shift personnel of the need to be cognizant of the specific time requirements of both daily and shift surveillances.

"NRC FORM 366A ~ U.S.OPO:1888.0 024 538/455 (843)

Carolina Power 8 Light Company HARRIS NUCLEAR PROJECT P.O. Box 165 New Hill, NC 27562 JUL 50 1987 File Number'SHF/10-13510C Letter Number'. HO-870477 (0)

U.S. Nuclear Regulatory Commission ATTN: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 LICENSEE EVENT REPORT 87-040-00 Gentlemen'.

In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted. This report fulfills the requirement for a written report within thirty (30) days of a reportable occurrence and is in accordance with the format set forth in NUREG-1022, September, 1983.

Very truly yours, R. A. Watson Vice President Harris Nuclear Project RAW:skm Enclosure cc: Dr. J. Nelson Grace (NRC RII)

Mr. B. Buckley (NRR)

Mr. G. Maxwell (NRC SHNPP)

MEM/HO-8704770/PAGE 1/OS1

~ ~