LER 87-015-00:on 870325,noble Gas Grab Sample Not Taken. Caused by Personnel Error.Grab Sample Taken on 870326.Event Reviewed W/Staff & Personnel counseled.W/870417 Ltr
ML18004B780
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/17/1987
From: Hudson O, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-870409-(O), LER-87-015, LER-87-15, NUDOCS 8704280378
Download: ML18004B780 (6)


Text

REGUL> RY INFORMATION DISTR IBUTI SYSTEM> (R IDS>

ACCESSION NBR 8704280378, DOC. DATE: 87/04/17 NOTARY ZED: NO DOCKET FAC IL: 50-400 Shearon Harris Nuclear Power Plant> Unit 1 ~ Carolina 05000400 AUTH. NAt",E AU t HOR AFF ILI AT IO>N HUDSON> O. N. Carolina Power 8c Light Co.

WATSON> R. A. Carolina Powel h Light Co.

RECIP. NAME RECIPIENT AFFILIATIGN

SUBJECT:

LER 87-015-00: on 870325> noble gas grab sample not taken.

Caused bg personnel error. Grab sample taken on 870326. Event reviewed w/staff 8< personnel counseled. W/870417 ltr.

DISTRIBUTION CODE: IESSD COPIES RECEIVED: LTR TITLE: 50. 73 Licensee Event Report (LER) Incident Rpt> etc.

g ENCL J SIZE:

NOTES: Application for permit renewal filed. 05000400 RECIP IENT COPIES REC IP I ENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAl'1E LTTR ENCL PD2-1 LA 1 PD2-1 PD 1 1 BUCl(LEY> B 1 1 INTERNAL: ACRS MICHELSON 1 *CRS MOELLER 1 1 AEOD/DOA 1 AFOD/DSP/ROAB 2 2 AEOD/DSP/TPAB . 1 l'!RR/DEST/ADE 0 NRR/DEST/ADS 0 NRR/DEST/CEB 1 1 NRR/DEST/ELB 1 t!RR /DEST/ I CSB 1 1 t!RR/DEBT/MEB 1 ERR/DEST/MTB 1 NRR/DEST/PSB 1 NRR/DEST/RSB 1 1 NRR/DEST/SGB 1 t-RR/DLPQ/HFB 1 1 NRR/DLPQ/QAB 1 1 t!RR/DOEA/EAB 1 1 NRR/DREP/EPB 1 NRR/DREP/RAB 1 NRR/DREP/RPB 2 2

  • LRB 1 1 NRR/PMAS/PTSB 1 1 EG L 0 1 1 RES SPEIS T 1 1 R: ~ FILE 01 1 1 EXTERNAL: &GAG GROH> M 5 5 H ST LOBBY WARD 1 LPDR 1 t.!RC PDR 1 NSI C HARB IS J 1 1 NSIC MAYS> G 1 1 TOTAL NUI'1BER OF COPIES REQUIRED: LTTR 41 ENCL 3V

I NRC Form 206 UA. NUCLEAR REGULATORY COMMISSION (8 53)

APPROVED OMB NO. 3160410l LICENSEE EVENT REPORT ILER) EXPIRES: 8/31/88 FACILITY NAME (I) DOCKET NUMBER (2) PA E 3 SHEARON HARRIS PLANT UNIT 1 0 5 0 0 0 4 O O 1 OF O 3 TITLE (l)

TURBINE BUILDING VENT STACK RADIATION MONITOR MISSED SAMPLE EVENT DATE (SI LER NUMBER (6) REPORT DATE (7) OTHER FACILITIES INVOLVED (8)

MONTH OAY YEAR YEAR SEQUENTIAL REVISION OAY YEAR FACILITY NAMES DOCKET NUMBER(S)

NUMBER NUMSEII MONTH 0 5 0 0 0 0 3 25 87 87 015 0 0 0 4 1 7 8 7 0 5 0 0 0 OPERATINO THIS REPORT IS SUBMITTED PURSUANT T0 THE REQUIREMENTS OF 10 CFR ((I fChech one or more ol the follovffnp) (11)

MODE (8) 3 20A02(EI 20AOS(c) 60.73(al(2) (iv) 73.71(E)

POWER 20AOS( ~ )(1)(il SOM(e) (1) 50.73(e I (2 I (el 73.71(c)

LEVEL (10) 20AOS(e) (1)OI) 50.36(e) l2) 50.73(e I (2) (vN) OTHER (Specify ln Atrttrect helow end ln Text, NRC Form 20AOS( ~ ) (1((iiil 50.73(el(2)(i) 50.73( ~ l(2)(riii)(A) 366AJ 20AOS(a)(l)(iv) 50.73( ~ l(2)(ii) 50.73( ~ l(2)(r(E) (Bl 20AOS(a)(1)(v) 50.73(el l2) (iii) 60.73( ~ )(2)(xl LICENSEE CONTACT FOR THIS LER (12I NAME TELEPHONE NUMBER AREA CODE

0. N. HUDSON, SENIOR ENGINEER REGULATORY COMPLIANCE 919 362 -2 363 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

CAUSE SYSTEM COMPONENT MANUFAC.

TVRER EPORTABLE TO NPRDS g@$

gg

~yy '

CAUSE SYSTEM COMPONFNT MANUFAG TURER EPORTABLE TO NPRDS M%4

%C~.6~M . <44.....:

SUPPLEMENTAL REPORT EXPECTED (1l) MONTH DAY YEAR EXPECTED SV 8 MISS ION DATE (16)

YES (if yer, complete EXPECTED $ (fBMISSION DATE/ NO ABSTRACT fLlmlt to le00 tpecer, l.e., epproxlmetery fifteen tlnpreepece typewritten lintel (16)

Abstract On March 23, 1987, the radiation effluent monitor on the Turbine Building vent:

stack at the Shearon Harris Nuclear Power Plant was declared inoperable. On March 25, while the plant was in Mode 3, a Technical Specification compensatory action, a noble gas grab sample, was not taken due to an incorrect log entry. A grab sample was taken after discovery of the error and the monitor was declared operable on March 26, 1987.

8704280378 870417 PDR ADOCK 05000400 S PDR NRC Form 366 (903)

NRC Form 366A U.S. NUCLEAR REGULATORY COMMISSION (94)3)

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVEO OMB NO. 3150&)04 EXPIRES: 8/31/88 FACILITYNAME nl OOCKET NUMBER (11 LER NUMBER 16) PAGE (3)

YEAR NW SSOVENTIAL ~'A'rEV<<ION SHEARON HARRIS PLANT UNIT 1 k4 NUMBER CaN NUMSsrr 0 5 0 0 0 4 Q 0 8 7 0 1 5 0 0 0 20F 0 3 TEXT /R rrroro <<roco /4 n /rrlrrL rrso ed/3/Oo/4/HRC Form 3664'4/ (17)

Descri tion of Event On March 23, 1987, the radiation effluent monitor on the Turbine Building (TB) vent stack at the Shearon Harris Nuclear Power Plant was declared inoperable due to communication problems and water in the monitor. Technical Specification compensatory actions were implemented as required to: (1) estimate flow rates, (2) take grab samples for noble gas activity and (3) collect continuous samples for iodine and particulates.

On the morning of March 25, 1987, while the plant was in Mode 3, an entry was made in the Chemistry Log Book stating that the TB monitor was operable and the auxiliary sampling equipment needed to be removed. In fact, the TB monitor was still inoperable. A different monitor had been returned to operable status the previous day and it is believed that this led to the incorrect log entry. As a result, the Environmental'&'Chemistry (E & C) shift "turnover log on the morning of the 25th stated that the TB monitor was operable and the auxiliary sampler needed to be removed. However, the E & C turnover log also stated that a gross gas sample on the TB stack needed to be,.

taken at 1300, and the Daily Chemistry Report noted that TB stack monitor as inoperable. The day shift receiving turnover noticed the discrepancy and acted in accordance with the information in the E & C shift turnover log stating that the TB stack monitor was now operable. Therefore, the noble gas grab sample required by the Technical Specifications was not taken at 1300.

The previous sample had been taken at 0100 on March 25 and the Technical Specifications require samples every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The auxiliary sampler, however, was still in place and operating continuously. All other Technical Specification compensatory actions were maintained throughout the event.

At 0100 on March 26, the E & C shift recognized that the discrepancy existed, and the monitor was still inoperable. A noble gas sample was then collected as required. The TB stack monitor was declared operable later on March 26.

Cause The cause of this event was personnel error. An incorrect log entry was made stating that the monitor was operable. In addition, the on-coming shift did not thoroughly investigate the discrepancy in the logs.

~Anal sis This event is reportable per 10CFR 50.73(a)(2)(i)(B) since a Technical Specification compensatory action was not taken (noble gas grab sample). All other Technical Specification compensatory actions were taken as required throughout the event.

WRC FORM 366A *U.S.GPO.")966-0-624 638/455 (94)3)

NRC Form.SSSA V.S. NUCLEAR REOULATORY COMMISSION (94)3)

LICENSE EVENT REPORT {LER) TEXT CONTIN ATION APPROVEO OMB NO. 3150&104 EXPIRES: 8/31/88 FACILITY NAME (1) OOCKET NUMBER (2) LER NUMBER (5) PAOE (3)

YEAR SEOUSNTIAL REVISION SHEARON HARRIS PLANT UNIT 1 NUMSSR NUMSSR 0 5 0 0 0 4 Q Q 8 7 015 0 0 OF 0 3 TEXT /8'mors 4Pscs JF rsSIISsd, I>>c /r/rrr>>/HRC Fc/m 3//SA'4) (17)

~Anal sis (continued)

The grab samples taken at 0100 on March 25 and 0100 on March 26 both showed no activity present. The average flow from the stack during the period in question was 2.62 x 10 cfm. The plant was in Mode 3. No safety systems or components were affected in this event. Thus, there were no safety consequences or implications.

Similar events are described in LERs 86-001-00,86-010"00, and 87-016-00.

Corrective Actions The event was reviewed with E & C staff and they were counseled to prevent recurrence.

2 ~ A new procedure is being developed to specifically address inoperable monitors and the approoriate E & C responses. The procedure will provide administrative control concerning the status of relevant effluent monitors and their operability.

NRC FORM SSSA *U.S.GPO:1988.0.524 538/455 (943)

Carolina Power & Light Company HARRIS NUCLEAR PROJECT P.O. Box 165 New Hill, NC 27562 April 17, 1987 File Number.'HF/10-13510C Letter Number'HO-870409 (0)

U.S. Nuclear Regulatory Commission ATTN: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50"400 LICENSE NO. NPF-63 LICENSEE EVENT REPORT 87-015-00 Gentlemen:

In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted. This report fulfills the requirement for a written report within thirty (30)

'ays of a reportable occurrence and is in accordance with the format set forth in NUREG-1022, September, 1983.

Very truly yours, R. A. Watson Vice President Harris Nuclear Project RAW:skm Enclosure cc: Dr. J. Nelson Grace (NRC RII)

Mr. B. Buckley (NRR)

Mr. G. Maxwell (NRC SHNPP) gS MEM/HO-8704090/PAGE 1/Osl