SYSTEMATIC EVALUATION PROGRAM REVIEW OF NRC SAFETY TOPIC VII-2 ASSOCIATED WITH THE ELECTRICAL, INSTRUMENTATION, AND CONTROL PORTIONS OF THE ESF SYSTEM CONTROL LOGIC AND DESIGN FOR THE GINNA NUCLEAR POWER PLANT By Donald H. Laudenbach*
July 1980 ROUGH DRAFT
- EG8G, Inc., Energy Measurements Group, San Ramon Operations 800'F300'Q@
TABLE OF CONTENTS Page
- l. INTRODUCTION ~ ~ 1
- 2. CURRENT LICENSING CRITERIA. ~ ~ ~ ~ 2
- 3. REVIEW GUIDELINES. ~ ~
- 4. SYSTEM DESCRIPTION ~ ~ 5 4.1 Containment Pressure. ~ ~ 5 4.1.1 Channel .I (Loop Al) 5 4.1.2 Channel II (Loop A2) . 6 4.1.3 Channel III (Loop A3). 6 4.1.4 Channel II (Loop Bl) . 7 4.1.5 Channel III (Loop B2). 7 4.1.6 Channel IV (Loop B3) 8 4.2 Reactor Coolant Flow. ~ ~ 9 4.2.1 Channel I (Loop Al) 9 4.2.2 Channel II (Loop A2) . 9 4.2.3 Channel III (Loop A3). 10 4.2.4 Channel II (Loop Bl) 10 4.2.5 4.2.6 Channel Channel III (Loop B2).
IV (Loop B3) .
ll 11 4.3 Coolant Temperature (Tavg).
4.3.1 Loop Al 12 4.3.2 Loop A2 12 4.3.3 Loop Bl 13 4.3.4 Loop B2 13
- 5. EVALUATION AND CONCLUSIONS. ~ ~ 15
- 6.
SUMMARY
. 16 REFERENCES. 17 APPENDIX A NRC SAFETY TOPICS RELATED TO THIS REPORT A-1
- 1. INTRODUCTION The Engineered Safety Features Actuated Systems (ESFAS) of both PWRs and BWRs may have design features that raise questions about the electrical independence of redundant channels and isolation between ESF channels or trains.
Non-safety systems generally receive control signals from the ESF sensor current loops. The 'non-safety circuits are required to have isola-tion devices to insure electrical independence from the ESF channels. The safety objective is to verify J
that operting reactors have ESF designs which provide'effective and qualified isolation between ESF channels, and between ESFs and non-safety systems.
This report reviews the plant's ESF EISC design features to insurh that the non-safety systems electrically connected to the ESFs are properly isolated from the ESFs. This report also reviews the plant's ESFs to insure that there is proper isolation between redundant ESF channels or trains, and that the isolation devices or techniques meet the current
'icensing criteria detailed in Section 2 of this report. The qualification of safety-related equipment is not within the scope of this report and is discussed in NRC Safety Topic III-12 and NUREG-0458.
~ ~ ~I
- 2. CURRENT LICENSING CRITERIA GDC 22, entitled "Protection System Independence," states that:
The protection system shall be designed to assure that the effects of natural phenomena and of normal operating, main-tenance, testing, and postulated accident conditions on redundant channels do not result in loss of the protection function, or that they shall be demonstrated to be accept-able on some other defined basis. Design techniques, such as functional diversity or diversity in component design and principles of operation, shall be used to the extent prac-tical to prevent loss of the protection function.
GDC 24, entitled "Separation of Protection and Control Systems,"
states that:
The protection system shall be separated from control systems to the extent that failure of any single control system component or channel, or failure or removal from service of any single protection system component or channel which is common to the control and protection system leave
.intact a system satisfying all reliability, redundancy, and independence requirements of the protection system. Inter-connection of the protection and control systems shall be limited ingg so as to assure that safety is not significantly impaired.
IEEE Std-279-l973., entitled "Criteria for Protection Systems for Nuclear Power Generating Stations," states in Section 4.7.2 that:
The transmission of signals from protection system equipment for control system use shall be through isolation devices which shall be classified as part of the protection system and shall meet all the requirements of this document. No credible failure at the output of an isolation device shall prevent the associated protection system, channel from meet-the minimum performance requirements specified in the design bases.
~ ~
0 Examples of credible failures include short circuits, open circuits, grounds, and the application of the maximum credible a-c or d-c potential. A failure in an isolation device is evaluated in the same manner as a failure of other equipment in the protection system.
- 3. REVIEM GUIDELINES The following NRC guidelines were used for this review:
Verify that the signals used for ESF functions are isolated from redundant ESF trains or channels. Review the schematic diagrams to assure that the wiring satisfies the functional logic diagrams in the FSAR or its equivalent (GDC 22).
Verify that qualified electrical isolation devices are utilized when redundant ESF trains or channels share safety signals. Identify and describe the type of isolation device employed (GDC 22).
Verify that the safety signals used for ESF functions are isolated from control or non-safety systems. Identify and describe the type of isolation device employed (GDC 24, IEEE Std-279-1971, Section 4.7.2) .
Verify that the logic does not contain sneak paths that could cause false operation or prevent required action as the result of operation of plant controls.
Identify the related NRC Safety Topics in an appendix to the report.
- 4. SYSTEM DESCRIPTION 4.1 CONTAINMENT PRESSURE The FSAR states in Section 7 .5.2 that the containment pressure is the variable required for post-accident monitoring. Six transmitters are installed outside the containment to prevent potential missile damage. The pressure is indicated and recorded (all six channels) on the main control board. The six channels monitoring containment reflect the effectiveness of engineered safety features. High pressure indicates high temperature and reduced pressure indicates reduced temperatures.
Loop A containment pressure is monitored by pressure transmitters PT-945, PT-946 and PT-947 . Loop B containment pressur e is monitored by pressure transmitters PT-948, PT-949 and PT-950.
4.1.1 Channel I (Loo Al) decontrol Containment Pressure Channel I, Loop A1 (designated RED) origi-nates at pressure transmitter PT-945 and provides isolated output to the system via Foxboro isolation device, Model M/66BR-OH, circuit symbol PM-945 (Foxboro drawing BD-12). The control system provides signals to'he computer and control board indicators (Foxboro drawing BD-14).
PT-945 provides an unisolated signal to Foxboro pressure controller, Model M/635-BR-OEHA, circuit symbol PC-945 A/B (Foxboro drawing BD-12). The "A" section output of PC-945 A/B provides one of the inputs to the two-out-of-three (2/3) containment pressure safeguards actuation logic; the other two inputs are from PC-947A and PC-949A. The 2/3 containment pressure logic output provides enabling signals to feedwater isolation, containment isolation, reactor trip, containment ventilation isolation and safeguards sequence logic. The "B" section output of PC-945 A/B provides one of the
inputs to the 2/3 containment pressure safeguards actuation logic; the other two inputs are from PC-9478 and PC-9498. The 2/3 containment pres-sure logic output provides enabling signals to containment spray actuation logic (Westinghouse drawing 882D612, sheet 6).
Channel II (Loo A2)
Containment Pressure Channel I I, Loop A2 (desi gnated WHITE) originates at pressure transmitter PT-946 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol PM-946 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing 80-14).
PT-946 provides an unisolated signal to Foxboro pressure controller, Model M/635-8R-OEHA, circuit symbol PC-946 A/8 (Foxboro drawing BD-12). The "A" section output of PC-946 A/8 provides one of the inputs to the two-out-of-three (2/3) containment pressure safeguards actuation logic; the other two inputs are from PC-948A and PC-95OA. The 2/3 containment pressure logic output provides enabling signals to Loop A steam line isolation and Loop 8 steam line isolation. The "8" section output of PC-946 A/8 provides one of the inputs to the 2/3 containment pressure safeguards actuation logic; the other two inputs are from PC-9488 and PC-9508. The 2/3 containment pres-sure'ogic output provides enabling signals to containment spray actuation logic (Westinghouse drawing 882D612, sheet 6).
~
4.1.3 Channel III (Loop A3)
Containment Pressure Channel III, Loop A3 (designated BLUE) originates at pressure transmitter PT-947 and provides isolated output to the control system via Foxboro isolation device, Model M/668R-OH, circuit symbol PM-947 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing 80-14).
PT-947 provides an unisolated signal to Foxboro pressure controller, Model M/635-BR-OEHA, circuit symbol PC-947 A/8 (Foxboro drawing BD-12). The "A" section output of PC-947 A/8 provides one of the inputs to the two-out-of-three (2/3) containment pressure safeguards actuation logic; the other two inputs are from PC-945A and PC-949A. The 2/3 containment pressure logic output provides enabling signals to feedwater isolation, containment isolation, reactor trip, containment ventilation isolation and safeguards sequence logic. The "B" section output of PC-947 A/B provides one of the inputs to the 2/3 containment pressure safeguards actuation logic; the other two inputs are from PC-945B and PC-949B. The 2/3 containment pres-sure logic output provides enabling signals to containment spray actuation logic (Westinghouse drawing 882D612, sheet 6).
4.1.4 Channel II (Loop Bl)
Containment Pressure Channel II, Loop Bl (designated WHITE) originates at pressure transmitter PT-949 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol PM-949 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing BD-14).
PT-949 provides an unisolated signal to Foxboro pressure controller, Model M/635-BR-OEHA, circuit symbol PC-949 A/B (Foxboro drawing B0-12). The "A" section output of PC-949 A/B provides. one of the inputs to the two-out-of-three (2/3) containment pressure safeguards actuation logic; the other two inputs are from PC-945A and PC-947A. The 2/3 containment pressure logic output provides enabling signals to feedwater isolation, containment isola-tion, reactor trip, containment ventilation isolation and safeguards sequence logic. The "B" section output of PC-949 A/B provides one of the inputs to the 2/3 containment pressure safeguards actuation logic; the oth..r two inputs are from PC-945B and PC-947B. The 2/3 containment pres-sure logic output provides enabling signals to containment spray actuation logic (Westinghouse drawing 8820612, sheet 6).
4.1.5 Channel III (Loop B2)
Containment Pressure Channel III, Loop B2 (designated BLUE) origintes at pressure transmitter PT-948 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol PM-948 (foxboro drawing BD-12). The control system provides signals
~ ~
to the computer and control board indicators (Foxboro drawing BD-14).
PT-948 provides an unisolated signal to Foxboro pressure controller, Model N/635-BR-OEHA, circuit symbol PC-948 A/B (Foxboro drawing BD-12). The "A" section output of PC-948 A/B provides one of the inputs to the two-out-of-three (2/3) containment pressure safeguards actuation logic; the other two inputs are from PC-946A and PC-950A. The 2/3 containment pressure logic output provides enabling signals to Loop A steam line isolation and Loop B steam line isolation. The "B" section output of PC-948 A/B provides one of the inputs to the 2/3 containment pressure safeguards actuation logic; the other two inputs are from PC-946B and PC-950B. The 2/3 containment pres-sure logic output provides enabling signals to containment spray actuation logic (Westinghouse drawing 8820612, sheet 6).
4.1.6 Channel IV Loo B3)
Containment Pressure Channel IY, Loop B3 (designated YELLOW) originates at pressure transmitter PT-950 and provides isolated output to the control system via Foxboro isolation device, model N/66BR-OH, circuit symbol PN-950 (Foxboro drawing BD-12). The control system provides signals to the computer and control . board indicators (Foxboro drawing BD-14).
PT-950 provides an unisolated signal to Foxboro pressure controller, Model M/635-BR-OEHA, circuit symbol PC-950 A/B (Foxboro drawing BD-12). The "A" section output of PC-950 A/B provides one of the inputs to the two-out-of-three (2/3) containment pressure safeguards actuation logic; the other two
'nputs are from PC-946A and PC-948A. The 2/3 containment pressure logic output provides enabling signals to Loop A steam line isolation and Loop B steam line isolation. The "B" section output of PC-950 A/B provides one of the inputs to the 2/3 containment pressure safeguards actuation logic; the other two inputs are from PC-946B and PC-948B. The 2/3 containment pres-sure logic output provides enabling signals to containment spray actuation logic (Westinghouse drawing 882D612, sheet 6).
It
~ ~
4.2 REACTOR COOLANT FLOW Six Reactor Coolant Flow channels are used for monitoring the RCS flow of the two-loop configuration. Isolated output signals from these channels are used for computer input and control board indication. Loop A coolant flow is monitored by flow transmitters FT-411, FT-412 and FT-413.
Loop B coolant flow is monitored by flow transmitters FT-414, FT-415 and FT-416.
4.2.1 Channel I (Loop A1)
Reactor Coolant Flow Channel I, Loop Al (designated RED) orig-inates at flow transmitter FT-411 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol FM-411 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing BD-15).
FT-411 provides an unisolated signal to Foxboro flow controller, Model M/635-AR-OAHA, circuit symbol FC-411 (Foxboro drawing BD-12). The output of FC-411 provides one of the inputs .to the two-out-of-three (2/3) Loop A RCS trip logic; the other two inputs are from FC-412 and FC-413. The 2/3 Loop A RCS trip logic output provides'nabling signals to Loop B RCS trip logic and reactor trip logic (Westinghouse drawing 882D612, sheet 14).
4.2.2 Channel II (Loop A2)
Reactor Coolant Flow Channel II, Loop A2 (designated WHITE) originates at flow transmitter FT-412 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol FM-412 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing BD-15).
FT-412 provides an unisolated signal to Foxboro flow controller, Model M/635-AR-OAHA, circuit symbol FC-412 (Foxboro drawing BD-12). The output of FC-411 provides one of the inputs to the two-out-of-three (2/3) Loop A
RCS trip logic; the other two inputs are from FC-411 and FC-413. The 2/3 Loop A RCS trip logic output pr ovi des enabling si gnal s to Loop B RCS tri p logic and reactor trip logic (Westinghouse drawing 882D612, sheet 14).
4.2.3 Channel III (Loo A3)
Reactor Coolant Flow Channel III, Loop A3 (designated BLUE) originates at flow transmitter FT-413 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol FM-413 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing BD-15).
FT-413 provides an unisolated signal to Foxboro flow controller, Model M/635-AR-OAHA, circuit symbol FC-413 (Foxboro drawing BD-12)., The output of FC-413 provides one of the inputs to the two-out-of-three (2/3) Loop A RCS trip logic; the other two inputs are from FC-411 and FC-412. The 2/3 Loop A RCS trip logic output provides enabling signals to Loop B RCS trip logic and reactor trip logic (Westinghouse drawing 882D612, sheet 14).
4.2.4 Channel II (Loop Bl)
Reactor Coolant Flow Channel II, Loop B1 (designated WHITE) originates at flow transmitter FT-414 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol FM-414 (Foxboro drawing BD-12) . The control system provides signals
~ to the computer and control board indicators (Foxboro drawing BD-15).
FT-414 provides an unisolated signal to Foxboro flow controller, Model M/635-AR-OAHA, circuit symbol FC-414 (Foxboro drawing BD-12). The output of FC-414 provi des one of the inputs to the two-out-of-three (2/3) Loop B RCS trip logic; the other two inputs are from FC-415 and FC-416. The 2/3 Loop B RCS trip logic output provides enabling signals to Loop A RCS trip logic and reactor trip logic (Westinghouse drawing 882D612, sheet 14).
I a 4.2.5 Channel III (Loo B2)
Reactor Coolant Flow Channel III, Loop B2 (designated BLUE) originates at flow transmitter FT-415 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol FM-415 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing BD-15).
FT-415 provides an unisolated signal to Foxboro flow controller, Model M/635-AR-OAHA, circuit symbol FC-415 (Foxboro drawing BD-12). The output of FC-415 provides one of the inputs to the two-out-of-three (2/3) Loop B RCS trip logic; the other two inputs are from FC-414 and FC-416. The 2/3 Loop B RCS trip logic output provides enabling signals to Loop A RCS trip logic and reactor trip logic (Mestinghouse drawing 8820612, sheet 14).
4.2.6 Channel IV (Loo B3)
Reactor Coolant Flow Channel IV, Loop'3 (designated YELLOW) originates at flow transmitter FT-416 and provides isolated output to the control system via Foxboro isolation device, Model M/66BR-OH, circuit symbol FM-416 (Foxboro drawing BD-12). The control system provides signals to the computer and control board indicators (Foxboro drawing BD-15).
FT-416 provides an unisolated signal to Foxboro flow controller, Model M/635-AR-OAHA, circuit symbol FC-416 (Foxboro drawing BD-12). The output of FC-416 provides one of the inputs to the two-out-of-three (2/3) Loop B
.RCS trip logic; the other two inputs are from FC-414 and FC-415. The 2/3 Loop B RCS trip logic output provides enabling signals to Loop A RCS trip logic and reactor trip logic (Westinghouse drawing 882D612, sheet 14).
4.3 COOLANT TEMPERATURE T Four T channels are used for overtemperature-overpower avg protection. Isolated output signals for all four channels are averaged for automatic control rod regulation of power and temperature. Unisolated output signals provi de input enables to the safeguards actuation logic.
4..3.1 Loop A1 Loop Al T avg signal is generated by a Dual Current Source device, circuit symbol .TT-401, as a product of temperature element .TE-401A, TE-4018, TE-405A and TE-4058 inputs. The T signal is isolated from the avg control system by Foxboro isolation device Model N/66GR-Ol< circuit symbol TM-401C (Foxboro'rawing BD-2). The control system provides signals for control rod regulation and control board indication. In addition, the control system provides input to the computer through another stage of isolation, Foxboro isolation device Model M/668R-OH, circuit symbol TN-401M (Foxboro drawing BD-17). The control system also provides input to record-er TR-401 through another stage of isolation, Foxboro isolation device Model N/668R-OH, circuit symbol TM-401G (Foxboro drawing BD-15). The unisolated signal Low T avg is generated by Foxboro temperature controller, Model M/635-8R-OEHA, circuit symbol TC-401A (Foxboro drawing BD-2). The output of TC-401A provides one of the inputs to the two-out-of-four (2/4)
Loop A RCS trip logic; the other three inputs are from TC-402A, TC-403A and TC-404A,. The 2/4 Loop A RCS trip logic output provides enabling signals to Loop A steam line isolation and Loop 8 steam line isolation (Mestinghouse drawing 882D612, sheets 6 and 14).
4.3. 2 ~Lao A2 Loop A2 T signal is generated by a Dual Current Source device, circuit symbol TT-402, as a product of temperature element TE-402A, TE-4028, TE-406A and TE-4068 inputs. The T avg signal is isolated from the control system by Foxboro isolation device Model M/66GR-OM circuit symbol TM-402C (Foxboro drawing BD-3). The control system provides signals for control rod regulation and control board indication. In addition,'he control system provides i nput to the computer through another stage of isolation, Foxboro isolation device Model N/668R-OH, circuit symbol TM-402M (Foxboro drawing BD-17). The control system also provides input to r ecord-er TR-401 through another stage of isolation, Foxboro isolation device Model N/668R-OH, circuit symbol TM-401G (Foxboro drawing BD-15). The unisolated signal Low T is generated by Foxboro temperature controller, Model M/635-BR-OEHA, circuit symbol TC-402A (Foxboro drawing BD-3). The output of TC-402A provides one of the inputs to the two-out-of-four (2/4)
Loop A RCS trip logic; the other three inputs are from TC-401A, TC-403A and TC-404A. The 2/4 Loop A RCS trip logic output provides enabling signals to Loop A steam line isolation and Loop B steam line isolation (Westinghouse drawing 882D612, sheets 6 and 14).
4.3.3 ~Loo Bl Loop B1 T signal is generated by a Dual Current Source device, circuit symbol TT-403, as a product of temperature el ement TE-403A, TE-403B, TE-407A and TE-407B inputs. The T signal is isolated from the avg control system by Foxboro isolation device Model M/66GR-OW ci rcuit symbol TM-403C (Foxboro drawing BD-4). The control system provides signals for control rod regulation and control board indication. In addition, the control system provides input to the computer through another stage of isolation, Foxboro isolation device Model N/66BR-OH, circuit symbol TN-403W (Foxboro drawing BD-17) . The control system also provides input to record-er TR-401 through another stage of isolation, Foxboro isolation device Model
'I N/66BR-OH, circuit symbol TM-401G (Foxboro drawing BD-15). The unisolated signal Low T avg is generated by Foxboro temperature controller Model M/635-BR-OEHA, circuit symbol TC-403A (Foxboro drawing BD-4). The output of TC-403A provides one of the inputs to the two-out-of-four (2/4)
Loop B RCS trip logic; the other three inputs are from TC-401A, TC-402A and TC-404A. The 2/4 Loop B RCS trip logic output provides enabling signals to Loop A steam line isolation and Loop B steam line isolation (Westinghouse drawing 882D612, sheets 6 and 14).
4.3.4 Loop B2 Loop B2 T signal is generated by a Dual Current Source device, circuit symbol TT-404, as a product of temperature element TE-404A, TE-404B, TE-408A and TE-408B inputs. The T signal is isolated from the avg control system by Foxboro isolation device Model N/66GR-OW circuit symbol TM-404C (Foxboro drawing BD-5). The control system provides signals for control rod regulation and control board indication. In addition, the control system provides input to the computer through another stage of isolation, Foxboro isolation device Model M/66BR-OH, circuit symbol TM-404M (Foxboro .drawing BD-17). The control system also provides input to recorder TR-401 through another stage of isolation, Foxboro isolation device Model M/66BR-OH, circuit symbol TM-401G (Foxboro drawing BD-15).
The unisolated signal Low T is generated by Foxboro temperature con-troller, Model M/635-BR-OEHA, circuit symbol TC-404A (Foxboro drawing BD-5). The output of TC-404A provides one of the inputs to the two-out-of-four (2/4) Loop B RCS trip logic; the other three inputs are from TC-401A, TC-402A and TC-403A. The 2/4 Loop B RCS trip logic output provides enabl-ing signals to Loop A steam line isolation and Loop B steam line isolation (Hestinghouse drawing 882D612, sheets 6 and 14).
- 5. EVALUATION AND CONCLUSIONS Based on a review of the Foxboro drawings [Ref. 23 and the Foxboro Technical Information Bulletins [Refs. 3, 4, and 5], we conclude that the ESF systems are adequately isolated from the control or non-safety systems, and that the isolation of the ESF systems from non-safety systems satisfies the requirements of GDC 24 and Section 4.7 .2 of IEEE Std-279-1971 detailed in Section 2 of this report.
Based on a review of Westinghouse drawings [Refs. 6 and 7] and Rochester Gas and Electric Corp. drawings [Ref. 83, we conclude that redundant ESF channels are NOT adequately isolated from one another and that the isolation of redundant ESF channels does NOT satisfy the require-ments of GDC 22 detailed in Section 2 of this report. The following ex-amples are specific areas of non-compliance to GDC 22:
The Loop A 2/3 Reactor Coolant Flow LOW output signal is used, without isolation, in the Loop B Reactor Coolant Flow Logic.
The Loop B 2/3 Reactor Coolant Flow LOW output signal is used, without isolation, in the Loop A Reactor Coolant Flow Logic.
The Loop A RCP Breaker OPEN signal is used, without isola-tion, in the Loop B Breaker Open Logic.
The Loop B RCP Breaker OPEN signal is used, without isola-tion, in the Loop A Breaker Open Logic.
Isolation between Loop A Steam Line Logic and Loop B Steam Line Logic is defeated by the 2/4 LOW T signal line that provides inputs to both loops in a see@ string arrange-ment.
Isolation between Loop A Steam Line Logic and Loop B Steam Line Logic is defeated by the 2/3 Pressurizer Pressure LOW signal line that provides inputs to both loops in a series string arrangement.
Isolation between Loop A Steam Line Isolation Logic and Loop B Steam Line Isolation Logic is defeated by the 2/3 Contain-ment Pressure HIGH signal line that provides inputs to both loops in a series string arrangement.
Based on a review of the documentation listed in the Reference section of this report, we conclude that the isolation of the ESF systems from non-safety systems satisfies the current licensing criteria detailed in Section 2 of this report.
Based on a review of the documentation listed in the Reference section of this report, we conclude that the isolation of redundant ESF channels does NOT satisfy, the cur rent licensing criteria detailed in Section 2 of this report.
REFERENCES
- 1. Rochester Gas and Electric Corp., Ginna Final Safety Analysis Report (FSAR) dated April 23, 1975.
- 2. Foxboro drawings; BD-2 through BD-19 for the Ginna Nuclear Power Station.
- 3. Foxboro Technical Information Bulletin 839-168b, dated March 30, 1965.
- 4. Foxboro Technical Information Bulletin 818-240, dated March 1965.
- 5. Foxboro Technical Information Bulletin 818-241, dated July 1965.
- 6. Westinghouse drawings 882D612 (sheets 1 through 15), for the Ginna Nuclear Power Station.
- 7. Mestinghouse drawings 110E074 (sheets 1 through 5) for the Ginna Nuclear Power Station.
- 8. Rochester Gas and Electric Corp., drawings E33013-660 through E33013-665.
APPENDIX A NRC SAFETY TOPICS RELATED TO THIS REPORT
- 1. Safety Topic III-1, "Classification of Structures, Systems and Components."
- 3. Safety Topic VI-10.B, "Shared ESFs, On-Site Emergency Power and Service Systems for Multiple Unit Facilities." /"
- 4. Safety Topic VII-3, "Systems Required for Safe Shutdown."
- 5. Safety Topic VII-4, "Effects of Fail ure in Non-Saf ety Rel ated Systems on Selected ESFs."
- 6. Safety Topic XVI, "Techni cal Speci fi cati ons. "
Ca thy 84/89/CEB/amr