ML17262A368
| ML17262A368 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/15/1991 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | |
| Shared Package | |
| ML17262A369 | List: |
| References | |
| NUDOCS 9102200125 | |
| Download: ML17262A368 (2) | |
Text
ENCLOSURE A NtIC FORM 674 110 861 10CFR g55 ~5ib).
55.a ~iio 55 5 SIMULATION FACILITY CERTIFICATION U.S. NUCLEAR REGULATORY COMMISSION Apptome by OMa Ltweslatm NSTRUCTIONS. This form is to be filed for initial certification, recertification (if required), and for any change to a simulation facility performance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.
FACILITY R. E. GINNA. NUCLEAR HXrKR PLAN1'ICENSEE ROCHESTER GAS AND EUKKUC CORPORATION DOCKET NUMBER 5O. 244 DATE 15 M3 1991 Thh is to ceiuty msu 1. the ebiwe riemeo tscent kceiisee is ining ~ skiNi4teh fecsny coiiueing so4fy of s pram feiehceo simv4toi ther meets the reive'smmenu of 10 crR ~ 66aa: 2. this i'mv4fich meets the gvkfsiice contsxwom ANsf/ANs 3s, 1985. es eiukxsao by Nile Regv4toiy Guide I.tag; end 3. oocumentstionis ovai454 for NRc imewfinnsccoit4ncewith 10 cFII 65albf ~ ffthais sis shy
~*ceotxxis to the cenecatan ot nem 2 above, check here P snd oescnb>> fusy on sooaanst osgee es necessary.
NAME (or other ident ilicationi AND LOCATIONOF SIMULATIONFACILITY GINNA TRAINING CENTER SIMULMQR BUILDING X slMULATIQNFAGILITYpERFDRMANGE TEsT ABsTRAGTs ATTAcHED,(For perfornunce tests conductedin the period ending with the date ol this cartificationi DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Anach additional page(sl as necessary, andidentily theitem description being continued(
SEE PERH)BMANCE 'IKST ABSTKKTS IN ATTACHMENT 4 r
SIMULATIONFACILITYPERFORMANCE TESTING SCHEDULE ATTACHED.(For rhe conducr ol approx(mate(y 2515 olperformance tests psr yaer for the four year period X commencin with the date ol this certificationd DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED lArtach additional page(si as necessary, andidentify theitem description beingcontinuedi SEE PERK)HMANCE 'lKST SCHEDULE IN ATTACHMENT 4 PERFORMANCE TESTING PLAN CHANGE, (For any modification ro a pen'ormance testing plan submitted on a prey(ous can(((cation(
DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Attach additional page(sl as necessary andidentify theitem description being continuedl R EGEATIFIGATIQN(Describe corrective actions taaeni attach results ol completed performance testing in accordance with 10 cFR Q 55 a5(b((5((id.
Attach additional rl as necessa andidentil theitem descn tion bei continued.l 9i02200i25 5'10215 I
PDR ADOCK OS000244 P:,
PDR l
Any retie statement or omi Mien in this document, incfvding attachments. may be tubiect to ciw1 and curn inal sanctions, I certify vndei penalty ot peifuiy that the information in the document and ana ments is tive and coiiect.
GNATUREi ORIZED PRE NTATIVE VICE PRESIDENT GINNA NUCLEAR PRODUCTION DATE 15 PKS 1991 In accordance with 10 CF R b 55.5, Communicag', this form shall be submitted to the NRC as follows:
BY MAILADDRESSED TO: director, Office of Nuclear Reactor Regulation BY DELIVERYIN PERSON
'.S. Nuclear Regulatory Commission TO THE NRC OF F ICE AT:
7920 Norfolk Avenue Washington, DC 20555 Bethesda, MD
0
~
~