IR 05000445/2016404

From kanterella
(Redirected from ML16190A269)
Jump to navigation Jump to search
NRC Security Inspection Report 05000445/2016404 and 05000446/2016404
ML16190A269
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/08/2016
From: Mark Haire
Plant Support Branch-1
To: Peters K
Luminant Generation Co
References
IR 2016404
Download: ML16190A269 (4)


Text

uly 8, 2016

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000445/2016404 AND 05000446/2016404

Dear Mr. Peters:

On May 26, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Comanche Peak Nuclear Power Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. T. McCool, Site Vice President, and other members of the licensee staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. In addition, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating these violations as a non-cited violations consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of the non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspectors at the Comanche Peak Nuclear Power Plant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA David A. Holman Acting for/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Nonpublic Enclosure:

Inspection Report 05000445/2016404, 05000446/2016404 w/Attachment: Supplemental Information cc w/o encl: Electronic Distribution