Category:Letter
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22083A1072022-03-30030 March 2022 Presubmittal Licensee Presentation for SR 3.8.1.16 Proposed License Amendment Request (EPID L-2022-LRM-0021) (Slides) ML21155A2132021-08-26026 August 2021 Plant ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20058E8992020-06-18018 June 2020 Issuance of Amendment No. 267 Regarding Change to Surveillance Requirement 3.8.2.1 ML19205A2892019-09-24024 September 2019 Issuance of Amendment No. 266 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19158A3072019-08-15015 August 2019 Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b RA-18-0245, License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.12019-06-0404 June 2019 License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1 ML18288A1392019-04-29029 April 2019 Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18200A0422018-08-16016 August 2018 Issuance of Amendment No. 260 Regarding Request to Revise Technical Specification Reactor Coolant System Pressure and Temperature Limits to Reflect 24-Month Fuel Cycles ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18115A1502018-05-25025 May 2018 Issuance of Amendment 258 Regarding Request to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (CAC No. MF9544; EPID L-2017-LLA-0206) ML18060A4012018-04-10010 April 2018 Redacted Issuance of Amendments Revising TSs for Methodology Reports DPC-NE-3008-P, Revision 0, and DPC-NE-3009-P, Revision 0) (CAC Nos. MF8439 and MF8440; EPID L-2016-LLA-0012) ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17102A9232017-05-18018 May 2017 Nonproprietary Issuance of Amendments Revising Technical Specifications for Methodology Reports DPC Ne 1008 P Revision 0, DPC Nf 2010 Revision 3 and DPC Ne 2011 P Revision 2 (CAC Nos. MF6648, MF6649, MF7693/MF7694) ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17039A1532017-03-23023 March 2017 H.B. Robinson, Unit 2 - Issuance of Amendment 250 to Adopt Technical Specification Task Force (TSTF) Change Traveler TSTF-339, Revision 2, "Relocate TS Parameters to the COLR," Consistent with WCAP-14483 (CAC No. MF7615) ML16337A2642017-02-0303 February 2017 Issuance of Amendments Regarding National Fire Protection Association Standard 805 ML16201A1952016-10-11011 October 2016 Issuance of Amendment to Extend Containment Leakage Test Frequencies ML16217A1182016-09-13013 September 2016 Steam Electric Plants, Shearon Harris Nuclear Power Plant,Unit 1 -Issuance of Amendments 271, 299, 152 and 246 Re Change in Corporate Form of Duke Energy Progress, Inc ML16061A4722016-04-28028 April 2016 Issuance of Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML16049A6302016-03-0808 March 2016 Issuance of Amendments Revising Technical Specifications for Methodology Report DPC-NE-2005-P Revision 5, Thermal-Hydraulic Statistical Core Design Methodology ML15222B1752015-09-0808 September 2015 Issuance of Amendment to Modify Technical Specification 3.8.1, Diesel Generator Testing Requirements ML14318A9292014-12-19019 December 2014 H. B. Robinson; Shearon Harris Nuclear Power Plant; and Crystal River, Unit 3 - Issuance of License Amendments Regarding Revision to Cyber Security Plan Implementation Schedule Completion Date (TAC Nos. MF3263 - MF3267) ML13267A2932013-10-21021 October 2013 Issuance of Amendments 263, 291, 142 and 236 Re Name Change (TAC Nos, MF1463-MF1466) ML13198A3672013-08-29029 August 2013 Issuance of an Amendment to Revise the Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) ML13114A7142013-05-29029 May 2013 Issuance of an Amendment to Eliminate Steam Generator Water Level-Low Coincident with Steam Flow/Feedwater Flow Mismatch Function from TS Table 3.1.1-1. Reactor Protection System Instrumentation (ME9516) ML13101A3692013-05-16016 May 2013 Issuance of an Amendment on Technical Specification Changes Regarding an Additional of a Note to Limiting Conditions for Operation 3.1.4 and 3.1.7 Allowing 1-Hour Soak Time ML13017A3812013-02-26026 February 2013 Issuance of Amendments Technical Specification Change to Add Limiting Condition of Operation 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML13014A6412013-02-13013 February 2013 Issuance of an Amendment Request for Technical Specifications Change Regarding Corrections to Table 3.3.1 Note ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security ML12160A4092012-07-0606 July 2012 Issuance of an Amendment Regarding Technical Specifications Change for Missed Surveillances Requirements, Technical Specification Task Force (TSTF) - 358 Missed Surveillance Requirements ML11342A1652011-12-29029 December 2011 Issuance of an Amendment on Technical Specifications Related to Use of Areva'S M5 Advanced Alloy in Fuel Cladding and Fuel Assembly Components ML11193A0282011-07-29029 July 2011 Issuance of Amendments Approval of Cyber Security Plan ML1104700022011-03-0707 March 2011 Issuance of an Amendment Regarding 3.3.2 Engineered Safety Features Actuation System Instrumentation and Section 3.3.6 Containment Ventilation Isolation Instrumentation ML1009904052010-05-0707 May 2010 Issuance of Amendment Regarding Technical Specifications Changes Related to Steam Generator Alternate Repair Criteria ML1008303302010-03-25025 March 2010 Issuance of Amendment Regarding Technical Specifications Changes Related to the Chemical and Volume Control System ML1001200682010-03-17017 March 2010 Issuance of Amendment Regarding Changes to the Technical Specifications Related to the Turbine Trip Input to the Reactor Protection System ML0910302432009-05-0707 May 2009 Issuance of Amendment Regarding Elimination of Work Hour Controls to Support Compliance with Revised Part 26 of Title 10 of Code of Federal Regulations 2024-08-14
[Table view] Category:Safety Evaluation
MONTHYEARML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21259A0992021-11-0404 November 2021 Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21242A2982021-09-21021 September 2021 Proposed Alternative to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21155A2132021-08-26026 August 2021 Plant ML21214A2222021-08-10010 August 2021 Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21209A9962021-08-0202 August 2021 Proposed Alternative Request IST-RR-8 Related to the Inservice Testing Program ML21202A3982021-07-27027 July 2021 Relief Request Proposed Alternatives to American Society of Mechanical Engineers Operation and Maintenance Code Isolation Valve Seal Water System ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20097F0882020-06-19019 June 2020 Relief Request RA-19-0106 Regarding Proposed Alternative to ASME Code Case N-729-4 Volumetric or Surface Examination Requirements EPID-L-2019-LLR-0065) ML20058E8992020-06-18018 June 2020 Issuance of Amendment No. 267 Regarding Change to Surveillance Requirement 3.8.2.1 ML20021A0132020-02-19019 February 2020 Request for Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML19205A2892019-09-24024 September 2019 Issuance of Amendment No. 266 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19158A3072019-08-15015 August 2019 Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML19121A4822019-06-11011 June 2019 Staff Evaluation the 2017 Annual Report of Changes and Error Corrections Affecting the Large-Break Loss-of-Coolant Accident Analysis ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML18288A1392019-04-29029 April 2019 Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18200A0422018-08-16016 August 2018 Issuance of Amendment No. 260 Regarding Request to Revise Technical Specification Reactor Coolant System Pressure and Temperature Limits to Reflect 24-Month Fuel Cycles ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18115A1502018-05-25025 May 2018 Issuance of Amendment 258 Regarding Request to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (CAC No. MF9544; EPID L-2017-LLA-0206) ML18060A4012018-04-10010 April 2018 Redacted Issuance of Amendments Revising TSs for Methodology Reports DPC-NE-3008-P, Revision 0, and DPC-NE-3009-P, Revision 0) (CAC Nos. MF8439 and MF8440; EPID L-2016-LLA-0012) ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17102A9232017-05-18018 May 2017 Nonproprietary Issuance of Amendments Revising Technical Specifications for Methodology Reports DPC Ne 1008 P Revision 0, DPC Nf 2010 Revision 3 and DPC Ne 2011 P Revision 2 (CAC Nos. MF6648, MF6649, MF7693/MF7694) ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17039A1532017-03-23023 March 2017 H.B. Robinson, Unit 2 - Issuance of Amendment 250 to Adopt Technical Specification Task Force (TSTF) Change Traveler TSTF-339, Revision 2, "Relocate TS Parameters to the COLR," Consistent with WCAP-14483 (CAC No. MF7615) ML16337A2642017-02-0303 February 2017 Issuance of Amendments Regarding National Fire Protection Association Standard 805 2024-08-14
[Table view] Category:Technical Specifications
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2023-01-30030 January 2023 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML19158A3072019-08-15015 August 2019 Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b RA-19-0308, Clean Technical Specifications Pages Regarding Application to Adopt TSTF-425, Revision 32019-07-16016 July 2019 Clean Technical Specifications Pages Regarding Application to Adopt TSTF-425, Revision 3 ML18200A0422018-08-16016 August 2018 Issuance of Amendment No. 260 Regarding Request to Revise Technical Specification Reactor Coolant System Pressure and Temperature Limits to Reflect 24-Month Fuel Cycles RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. ML15222B1752015-09-0808 September 2015 Issuance of Amendment to Modify Technical Specification 3.8.1, Diesel Generator Testing Requirements RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/15-0026, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-04-0101 April 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation2014-02-10010 February 2014 License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation ML13198A3672013-08-29029 August 2013 Issuance of an Amendment to Revise the Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) RNP-RA/13-0089, Supplemental Submittal to Correct TS Pages Re Request for Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection & Application of Permanent Alternate Repair Criteria2013-08-22022 August 2013 Supplemental Submittal to Correct TS Pages Re Request for Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection & Application of Permanent Alternate Repair Criteria RNP-RA/13-0002, License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements2013-06-0707 June 2013 License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*)2012-08-29029 August 2012 License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) ML11342A1652011-12-29029 December 2011 Issuance of an Amendment on Technical Specifications Related to Use of Areva'S M5 Advanced Alloy in Fuel Cladding and Fuel Assembly Components RNP-RA/10-0096, Request for Technical Specifications Change Regarding Use of M5 Alloy Fuel2010-10-20020 October 2010 Request for Technical Specifications Change Regarding Use of M5 Alloy Fuel ML1008303302010-03-25025 March 2010 Issuance of Amendment Regarding Technical Specifications Changes Related to the Chemical and Volume Control System RNP-RA/10-0024, Request for Emergency Technical Specifications Change to Section 3.4.17, Chemical and Volume Control System (CVCS)2010-03-22022 March 2010 Request for Emergency Technical Specifications Change to Section 3.4.17, Chemical and Volume Control System (CVCS) RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0936312122009-12-16016 December 2009 Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/09-0024, Transmittal of Technical Specifications Bases Revisions2009-04-16016 April 2009 Transmittal of Technical Specifications Bases Revisions ML0813403232008-07-23023 July 2008 Issuance of Amendment Regarding the Incorporation of Technical Specification Task Force Standard Technical Specification Change Traveler, TSTF-448, Revision 3, Control Room Habitability. ML0815402792008-06-19019 June 2008 Tech Spec Pages for Amendment 218 Regarding Administrative Changes to the Operating License and Technical Specifications ML0803300542008-01-29029 January 2008 Tech Spec Pages for Amendment 217 to Make a One-time Change to Technical Specification (TS) 3.1.7 Rod Position Indication. ML0726102012007-09-19019 September 2007 Technical Specification, Correction to Technical Specification Page Issued with Amendment No. 215 Issued on June 15, 2007 ML0725706282007-09-18018 September 2007 Correction to Technical Specification Pages Issued with Amendment No. 216 Issued on July 16, 2007 RNP-RA/07-0095, Correction to Technical Specifications Page in Amendment 2162007-09-12012 September 2007 Correction to Technical Specifications Page in Amendment 216 ML0720102362007-07-16016 July 2007 Tech Spec Pages for Amendment 216 to Adopt Technical Specifications Task Force (TSTF) Standard TS Change Traveler, TSTF-447, Using the Consolidated Line Item Improvement Process ML0717202542007-06-15015 June 2007 Technical Specifications Changes Related to Containment Peak Pressure ML0709900232007-04-0404 April 2007 Technical Specifications, Changes Surveillance Requirement (SR) 3.5.2.6 RNP-RA/07-0032, Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria2007-03-22022 March 2007 Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria RNP-RA/07-0023, Response to NRC Request for Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria2007-03-13013 March 2007 Response to NRC Request for Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria ML0628404592006-10-0404 October 2006 Tech Spec Pages for Amendment 208 Regarding Emergency Diesel Generator or Automatic Trips Bypass TS 3.8.1 ML0627100222006-09-22022 September 2006 Technical Specification Amendment No. 210 - H.B. Robinson, Unit 2 - Issuance of Amendment and Partial Denial Reactor Protection System and Engineered Safety Feature Actuation System Instrumentation Tables ML0627005192006-09-20020 September 2006 Technical Specifications, Amendment, Methodology for Large Break Loss-of-Coolant Accident RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure2006-07-17017 July 2006 Request for Technical Specifications, Change Related to Containment Peak Pressure ML0621900412006-07-11011 July 2006 Technical Specifications, Alternate Source Term for the loss-of-coolant RNP-RA/06-0046, Request for Technical Specifications Change to Section 3.5.2. Emergency Core Cooling System2006-06-0101 June 2006 Request for Technical Specifications Change to Section 3.5.2. Emergency Core Cooling System RNP-RA/06-0028, Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process2006-05-30030 May 2006 Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ML0610805222006-04-11011 April 2006 H. B. Robinson, Unit 2 - Request for Technical Specification Change to Core Operating Limits Report References RNP-RA/06-0027, ANP-2512(NP), Loss of Forced Reactor Coolant Flow Analysis.2006-03-31031 March 2006 ANP-2512(NP), Loss of Forced Reactor Coolant Flow Analysis. ML0524205242005-08-25025 August 2005 Tech Spec Pages for Amendment 206 DC Sources - Operation and Shutdown RNP-RA/05-0062, Response to Request for Additional Information Regarding Technical Specifications Change Request to Section 3.8.4 DC Sources - Operating2005-07-13013 July 2005 Response to Request for Additional Information Regarding Technical Specifications Change Request to Section 3.8.4 DC Sources - Operating 2023-08-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 8, 2015 Mr. Richard M. Glover, H. B. Robinson Steam Electric Plant Site Vice President Duke Energy Progress, Inc.
3581 West Entrance Road, RNPA01 Hartsville, South Carolina 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - ISSUANCE OF AMENDMENT TO MODIFY TECHNICAL SPECIFICATION 3.8.1, DIESEL GENERATOR TESTING REQUIREMENTS (TAC NO. MF2717)
Dear Mr. Glover:
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 242 to Renewed Facility Operating License No. DPR-23 for the H. B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP). This amendment changes the HBRSEP Technical Specifications (TSs) in response to your application dated September 10, 2013 (Agencywide Documents Access and Management System Accession No. ML13261A289), as supplemented by letters dated January 30, 2014(ML14037A105), June 1, 2014(ML14163A480), and December 16, 2014 (ML14365A195).
The amendment revises TS 3.8.1, "AC [Alternating Current] Sources-Operating," by adding a Note to Required Action B.3.2.2 that will exempt performance of this conditional surveillance, when one diesel generator is declared inoperable due to pre-planned maintenance and testing.
A copy of the related Safety Evaluation is enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RAJ Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosures:
- 1. Amendment No. 242 to DPR-23
- 2. Safety Evaluation cc w/enclosures: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY PROGRESS, INC.
DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No.2 4 2 Renewed License No. DPR-23
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Duke Energy Progress, Inc. (the licensee),
dated September 10, 2013, as supplemented by letters dated January 30, June 1, and December 16, 2014, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 3.B. of Renewed Facility Operating License No. DPR-23 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 242 are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 120 days.
FOR THE NUCLEAR REGULATORY COMMISSION Shana R. Helton, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Operating License No. DPR-23 and the Technical Specifications Date of Issuance: September 8, 2O1 5
ATTACHMENT TO LICENSE AMENDMENT NO. 242 RENEWED FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Replace page 3 of Operating License No. DPR-23 with the attached page 3.
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages 3.8-2 3.8-2
D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; E. Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.
- 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
A. Maximum Power Level The licensee is authorized to operate the facility at a steady state reactor core power level not in excess of 2339 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.2 4 2 are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
(1) For Surveillance Requirements (SRs) that are new in Amendment 176 to Final Operating License DPR-23, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 176. For SRs that existed prior to Amendment 176, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 176.
Renewed Facility Operating License No. DPR-23 Amendment No. 2 4 2
AC Sources-Operating 3.8.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One DG inoperable. 8.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for the offsite circuit.
AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND thereafter 8.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s) supported discovery of by the inoperable DG Condition B inoperable when its concurrent with required redundant inoperability of feature(s) is redundant inoperable. required feature(s)
AND B.3.1 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG 8.3.2.1 Determine OPERABLE DG 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is not inoperable due to common cause failure.
AND
-~-----~---------NOTE----------------~~
Not required to be performed when the cause of the inoperable DG is pre-planned maintenance and testing.
B.3.2.2 Perform SR 3.8.1.2 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> for OPERABLE DG.
(continued)
HBRSEP Unit No. 2 3.8-2 Amendment No. 2 4 2
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 242 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-23 DUKE ENERGY PROGRESS, INC.
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261
1.0 INTRODUCTION
By application dated September 10, 2013 (Agencywide Documents Access and Management System Accession No. ML13261A289), as supplemented by letters dated January 30, 2014 (ML14037A105), June 1, 2014(ML14163A480), and December 16, 2014(ML14365A195), Duke Energy Progress, Inc. (Duke Energy, the licensee), submitted a license amendment request regarding H. B. Robinson Steam Electric Plant Unit No. 2 (HBRSEP) Technical Specifications (TSs). The proposed amendment would modify TS 3.8 Electrical Power Systems, limiting condition for operation (LCO) 3.8.1, AC [Alternating Current] Sources-Operating. A new Note would be added to Required Action (RA) B.3.2.2, the conditional surveillance on the alternate, operable emergency diesel generator (EOG), which currently requires the performance of Surveillance Requirement (SR) 3.8.1.2 within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />. The new Note would exempt performance of this conditional surveillance on the alternate, operable EDG when the cause of the initial inoperability of the inoperable EDG is pre-planned maintenance and testing. The exemption would not apply whenever the cause of the inoperability is corrective maintenance, even if the problem requiring corrective maintenance is discovered during the execution of the original pre-planned maintenance and testing.
The current HBRSEP TS requirement causes the operable EDG to be made inoperable by the conditional SR of RA B.3.2.2 whenever the pre-planned maintenance and testing on the alternate division EDG is not completed and returned to operable status within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />; even when it has been determined that no common cause failure potential exists within the first 24-hour period by RA B.3.2.1. This leads to the situation where both EDGs are inoperable simultaneously for the duration of the performance of SR 3.8.1.2, typically 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The licensee stated in its application that this conditional SR unnecessarily makes the plant vulnerable to a test-caused failure resulting in both EDGs being unavailable, for only a slight increase in confidence, by actively demonstrating the operability of the EDG not undergoing maintenance every 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> (notwithstanding the regular monthly demonstration of operability by the performance of SR 3.8.1.2). The proposed change does not eliminate the requirement to perform an operability determination of the available EDG irrespective of the reason for declaring one EDG inoperable.
Enclosure 2
The supplemental letters from the licensee dated January 30, June 1, and December 16, 2014, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Registeron December 10, 2013 (78 FR 74179).
2.0 REGULATORY EVALUATION
The EOG system provides an emergency source of alternating current (AC) electrical power to the onsite emergency AC Power subsystem, as required, for those events where offsite power (the preferred power source) is assumed not to be available. Each EOG unit shall auto start upon detection of undervoltage on that EDG's respective emergency bus, except when the Local/Remote control switch is in the LOCAL position. Once an EOG reaches design speed, the system will then close the EOG output breaker and assume the load on its respective bus. Both EDGs shall auto start upon initiation of safety injection, except when the Local/Remote control switch is in the LOCAL position. Once the EOG reaches design speed, the system will run but not pickup load unless power is lost to its respective bus.
The staff reviewed the licensee's application, as supplemented, against the following regulatory requirements and regulatory guidance documents.
Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36, "Technical specifications,"
establishes the requirements related to the content of the TSs. Pursuant to 10 CFR 50.36(c)
TSs will include items in the following categories: (1) safety limits, limiting safety system settings, and limiting control settings, (2) LCOs, (3) SRs, (4) design features; and (5) administrative controls. The proposed changes to the HBRSEP TS affect the LCO category.
As stated, in part, in 10 CFR 50.36(c)(2)(i), "Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met."
HBRSEP's Updated Final Safety Analysis Report (UFSAR), Section 3.1.2.39, "Emergency Power," describes the licensee's compliance with the July 1967 Atomic Energy Commission General Design Criterion (GDC), as stated:
An emergency power source shall be provided and designed with adequate independency, redundancy, capacity, and testability to permit the functioning of the engineered safety features and protection systems required to avoid undue risk to the health and safety of the public. This power source shall provide this capacity assuming a failure of a single active component. (GDC 39)
NUREG-1366, "Improvements to Technical Specifications Surveillance Requirements," dated December 1992, and NUREG-1431, Revision 4, "Standard Technical Specifications [STSs] -
Westinghouse Plants," dated April 2012, contain recommendations for demonstrating that a common mode failure may not exist on the remaining EDG(s) when one EOG is scheduled for testing or maintenance.
NRC Generic Letter (GL) 84-15, "Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability," dated July 1984, proposed actions that would improve the reliability of EDGs. In the condition where one EOG was inoperable, the actions would demonstrate operability for one EOG and the absence of a common mode failure.
GL 93-05, "Line-Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operations," dated September 27, 2003, provides guidance for implementing line-item TS improvements to reduce testing during power operation.
Regulatory Guide (RG) 1.93 "Availability of Electric Power Sources," dated December 1974, describes operating procedures and restrictions acceptable to the NRC staff, which should be implemented if the available electric power sources are less than the LCO.
RG 1.155, "Station Blackout" calls for the use of the reliability of the diesel generator as one of the factors in determining the length of time a plant should be able to cope with a station blackout. The reliability of EDGs can be one of the main factors affecting the risk of core damage from a station blackout event. Thus, both attaining and maintaining the high reliability of EDGs at nuclear power plants contribute greatly to reducing the probability of station blackout.
3.0 TECHNICAL EVALUATION
In its letter dated September 10, 2013, the licensee proposed to change the requirement for operability testing of an EOG when the EOG for the alternate safety bus is inoperable.
The current TS requirement causes the operable EOG to be made inoperable by the conditional SR of RA B.3.2.2 whenever the preventive maintenance and testing on the alternate division EOG is not completed and returned to operable status within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />. This is applicable even when it has been determined that no common-mode failure potential exists within the first 24-hour period by RA B.3.2.1. This leads to the situation where both EDGs are inoperable simultaneously for the duration of the performance of SR 3.8.1.2, typically 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
The proposed amendment revises RA B.3.2.2 in TS LCO 3.8.1, "AC Sources - Operating,"
adding a NOTE to remove the requirement to start the operable EOG if it can be determined that a common-mode failure does not exist and the cause of the inoperable EOG is pre-planned maintenance and testing.
The exemption to perform RA B 3.2.2 would not apply when the cause of the inoperability is corrective maintenance, even if the problem requiring corrective maintenance is discovered during the execution of the original pre-planned preventive maintenance and testing. Currently, TS 3.8.1 specifies that if an EOG is unavailable or inoperable due to any cause, then the operability of the remaining operable EOG must be demonstrated within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />.
HBRSEP TS 3.8.1, "AC Sources - Operating," currently states the following, in part:
Condition B: One DG inoperable Required Action B.3.2.1: Determine OPERABLE Completion Time: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG is not inoperable due to common cause failure.
Required Action B.3.2.2: Perform SR 3.8.1.2 for Completion Time: 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> OPERABLE DG.
- ------*-*---~---J The licensee proposed to revise HBRSEP TS 3.8.1 as follows:
~dition B: One DG inoperable I Required Action B.3.2.1: Determine OPERABLE Completion Time: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG is not inoperable due to common cause failure.
NOTE: Not required to be performed when the cause of the inoperable DG is pre-planned maintenance and testing.
Required Action B.3.2.2: Perform SR 3.8.1.2 for Completion Time: 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> OPERABLE DG.
The licensee submitted responses to NRC staff's requests for additional information (RAls) in letters dated January 30, 2014, June 1, 2014, and December 16, 2014. The intermediate responses revised the proposed TS Note wording and included RA B 3.1, which also requires performance of SR 3.8.1.2. In the final RAI response dated December 16, 2014, the licensee superseded all previous changes to the license amendment request. The proposed TS change, above, reflects the final RAI response.
The licensee stated that the use of the proposed exclusionary Note to RA B.3.2.2 would still ensure the operable EOG meets its intended safety function. This is done by taking credit for the satisfactory performance of its required SRs, specifically SRs 3.8.1.2 and 3.8.1.3, the 31-day start and load tests. The staff agrees that regular performance of these SRs is otherwise sufficient to demonstrate continued operability of an EOG, so it should not be necessary to perform them on an accelerated basis when no common cause failure exists between an EOG and the alternate EOG that has been taken out of service for pre-planned maintenance and testing.
The objective of RA B.3.2.2 is to ensure that the opposite train's EDG is not affected by a common-cause failure and to provide assurance of continued operability of the operable EOG.
However, the inoperability of an EOG does not necessarily affect the reliability of the operable EOG, unless there is some common-mode failure possibility. This is consistent with GL 93-05 and NUREG-1366 "Improvements to Technical Specifications Surveillance Requirements,"
December 1992. In GL 93-05, the NRC staff stated that, in performing the study documented in NUREG-1366, the safety can be improved, equipment degradation decreased, and an unnecessary burden on licensee personnel eliminated by reducing the frequency of certain testing required in the TSs during power operation. The changes eliminate testing that is likely to cause transients or excessive wear of equipment.
An evaluation of these changes indicated there would be a benefit to plant safety, as documented in NUREG-1366. The NUREG-1366 considered (1) unavailability of safety equipment due to testing, (2) initiation of significant transients due to testing, (3) actuation of engineered safety features that unnecessarily cycle safety equipment, (4) importance to safety of that system or component, (5) failure rate of that system or component, and (6) effectiveness of the test in discovering the failure.
The licensee stated the actions contained in TS 3.8.1, RA B.3.2.2 can also cause unnecessary testing of the operable EDG(s). This unnecessary testing can result in equipment degradation and the potential for reduced reliability. In NUREG-1366, the NRC staff recommended that the requirements to test the remaining EDG(s), when one EOG is inoperable due to any cause other than preplanned preventive maintenance or testing, be limited to those situations where the cause for inoperability has not been conclusively demonstrated to preclude the potential for a common-mode failure. NUREG-1366 and GL 93-05 require that when an EOG itself is inoperable (not including support system or independently testable components), the other EDG(s) should be tested only once and within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the absence of any potential common-mode failure can be demonstrated. NUREG-1431, STS 3.8.1.B contains language similar to the licensee's proposal in that either a common cause failure determination is performed (STS RA 3.1) OR perform SR 3.8.1.2 (STS RA 3.2). Furthermore, the proposed change states that if a common-cause possibility does not exist on the operable EDG(s), testing of the operable EDG(s) does not have to be performed. The staff finds the proposed change is consistent with the intent of NUREG-1431 and GL 93-05, and is therefore, acceptable.
HBRSEP's UFSAR licensing basis describes the licensee's compliance with the July 1967 Atomic Energy Commission GDC 39. GDC 39 "Emergency Power for Engineered Safety Features (Category A)," requires:
Alternate power systems shall be provided and designed with adequate independency, redundancy, capacity, and testability to permit the functioning required of the engineered safety features. As a minimum, the onsite power system and the offsite power system shall each, independently, provide this capacity assuming a failure of a single active component in each power system.
The licensee stated in its application that the requested TS amendment does not change the existing design of the onsite or offsite power systems. Therefore, the testing capability for the EDGs remains in agreement with GDC 39.
The NRC staff reviewed UFSAR Section 8.3.1.1.5.4 "Test and Inspection Capabilities," and confirmed that there was no EDG testing requirement in the HBRSEP UFSAR that would adversely affect the licensee's requested change to TS 3.8.1.
RG 1.93 describes operating procedures and restrictions that should be implemented if the available electric power sources are less than the LCO and actions required to be taken by the licensee when the LCO is not met. RG 1.93, Section 1.0, "The Available AC Power Sources Are One Less Than the LCO," discusses the degraded condition when one of the required offsite or onsite AC sources is not available. That is, either the offsite or the onsite AC power system has no redundancy. RG 1.93 states that each system retains full capability (one system with redundancy) to effect a safe shutdown and to mitigate the effects of a design-basis accident.
Operation could therefore safely continue if the availability of the remaining sources is verified.
When the TSs allow power operation to continue during a specific degradation level, RG 1.93 states that such continued power operation should be contingent on the following: (a) an immediate verification of the availability and integrity of the remaining sources; (b) reevaluation of the availability of the remaining EDG(s) at time intervals not to exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; (c) verification that the required maintenance activities do not further degrade the power system or in any way jeopardize plant safety; and (d) compliance with the additional conditions stipulated for each specific degradation level. The requested TS change relates to the method used to verify the availability of the remaining source(s) during planned equipment outages to comply with this requirement. The licensee's requested change is consistent with NRC guidance for verification of availability and integrity of the remaining sources as detailed in RG 1.93.
The action contained in HBRSEP TS 3.8.1, RA B.3.2.2 can cause unnecessary testing of the operable EDG(s). This unnecessary testing can result in equipment degradation and the potential for reduced reliability. As a result of the TS change, with the potential decrease in the testing frequencies, the risk of a transient and equipment degradation would be decreased, and the reliability of the equipment would not be adversely impacted.
The reliability of EDGs can be one of the main factors affecting the risk of core damage from a station blackout event. Thus, both attaining and maintaining the high reliability of EDGs contribute greatly to reducing the probability of station blackout. RG 1.155, "Station Blackout" calls for the use of the reliability of the EDG as one of the factors in determining the length of time a plant should be able to cope with a station blackout. The staff determined the requested TS amendment does not change the reliability factors delineated in RG 1.155 for coping with station blackout.
The added assurance of operability by performing the conditional surveillance of RA B.3.2.2, beyond the satisfactory performance of the periodically scheduled SRs, absent a common cause failure (RA B.3.2.1 is met) does not offset the intentional unavailability of an otherwise operable EDG and the associated potential for introducing a test-caused failure or a problem introduced by being connected parallel to offsite power. Therefore, excluding this conditional surveillance when the initial cause of inoperability is for pre-planned preventive maintenance and testing is appropriate. The proposed Note would not apply and the conditional surveillance of RA B.3.2.2 would still be performed every 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> when the cause of the alternate EDG inoperability is for corrective maintenance to repair a problem, even if the problem requiring corrective maintenance is discovered during the execution of the original pre-planned maintenance and
testing. The staff determined this is consistent with HBRSEP's current licensing basis requirement for the conditional surveillance for ensuring operability in the alternate EDG.
The NRC staff concludes that the proposed change is intended to reduce unnecessary testing of EDGs as recommended by GL 93-05 and NUREG-1366. On the basis of the above review, the NRC staff finds that the proposed change maintains compliance with requirements governing the design and operation of the electrical power system, provides adequate assurance of system operability, and is consistent with the recommendations contained in GL 93-05, RG 1.93, NUREG-1366 and NUREG-1431. Therefore, the NRC staff finds the proposed change acceptable.
As stated in 10 CFR 50.36(a)(1 ), "A summary statement of the bases or reasons for such specifications ... shall also be included in the application, but shall not become part of the technical specifications." The licensee may make changes to the TS Bases without prior NRC staff review and approval in accordance with the TS Bases Control Program, TS 5.5.14.
Accordingly, along with the proposed TS changes, the licensee also submitted TS Bases changes corresponding to the proposed TS changes. The NRC staff determined that TS Bases changes associated with the supplemental letter dated December 16, 2014, are consistent with the proposed TS changes and provide the purpose for each requirement in the specification consistent with the Commission's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors dated July 22, 1993 (58 FR 39132).
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the State of South Carolina official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (78 FR 74179). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the
amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Khadijah West Date: September 8, 2015
..* ML152228175 *via email OFFICE LPL2-2/PM LPL2-2/LA DE/EEEB* DSS/STSB* OGC- NLO NAME MBarillas BClavton JZimmerman RElliott DRoth DATE 08/13/15 08/13/15 08/04/15 08/04/15 08/24/15 OFFICE LPL2-2/BC LPL2-2/PM NAME SHelton MBarillas DATE 08/31/15 09/08/15