Tech Spec Pages for Amendment 208 Regarding Emergency Diesel Generator or Automatic Trips Bypass TS 3.8.1
ML062840459
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/04/2006
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
REGNER, Lisa, DORL/LPL2-2, 415-1906
Shared Package
ML062780484 List:
References
TAC MC9209
Download: ML062840459 (2)


Text

neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; D.

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; E.

Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.

3.

This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

A.

Maximum Power Level The licensee is authorized to operate the facility at a steady state reactor core power level not in excess of 2339 megawatts thermal.

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 208 are hereby incorporated in the license.

The license shall operate the facility in accordance with the Technical Specifications.

(1)

For Surveillance Requirements (SRs) that are new in Amendment 176 to Final Operating License DPR-23, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 176. For SRs that existed prior to Amendmentl 176, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 176.

Renewed Facility Operating License No. DPR-23 Amendment No. 208

AC Sources--0perating 3.831 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.11 Verify each DG's automatic trips are 24 months bypassed except engine overspeed.

SR 3.8.1.12 ------------------ NOTES -------------------

1.

Momentary transients outside the load and power factor ranges do not invalidate this test.

2..

This Surveillance shall not be performed in MODE 1 or 2.

3.

During periods when a diesel generator is being operated for testing purposes.

its protective trips neednot be bypassed after the diesel generator has properly assumed the load on its bus.

Verify each DG operating at a power factor 18 months s50.9 operates for 2 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

a.

For k 1.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> loaded > 2650 kW and

2750 kWM and
b.

For the remaining hours of the test loaded > 2400 kW and s 2500 kW.

(continued)

I HBRSEP Unit No. 2 3.8-9 Amendment No.

2Q8