MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:Technical Specifications
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2023-01-30030 January 2023 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML19158A3072019-08-15015 August 2019 Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b RA-19-0308, Clean Technical Specifications Pages Regarding Application to Adopt TSTF-425, Revision 32019-07-16016 July 2019 Clean Technical Specifications Pages Regarding Application to Adopt TSTF-425, Revision 3 ML18200A0422018-08-16016 August 2018 Issuance of Amendment No. 260 Regarding Request to Revise Technical Specification Reactor Coolant System Pressure and Temperature Limits to Reflect 24-Month Fuel Cycles RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. ML15222B1752015-09-0808 September 2015 Issuance of Amendment to Modify Technical Specification 3.8.1, Diesel Generator Testing Requirements RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/15-0026, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-04-0101 April 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation2014-02-10010 February 2014 License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation ML13198A3672013-08-29029 August 2013 Issuance of an Amendment to Revise the Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) RNP-RA/13-0089, Supplemental Submittal to Correct TS Pages Re Request for Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection & Application of Permanent Alternate Repair Criteria2013-08-22022 August 2013 Supplemental Submittal to Correct TS Pages Re Request for Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection & Application of Permanent Alternate Repair Criteria RNP-RA/13-0002, License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements2013-06-0707 June 2013 License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*)2012-08-29029 August 2012 License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) ML11342A1652011-12-29029 December 2011 Issuance of an Amendment on Technical Specifications Related to Use of Areva'S M5 Advanced Alloy in Fuel Cladding and Fuel Assembly Components RNP-RA/10-0096, Request for Technical Specifications Change Regarding Use of M5 Alloy Fuel2010-10-20020 October 2010 Request for Technical Specifications Change Regarding Use of M5 Alloy Fuel ML1008303302010-03-25025 March 2010 Issuance of Amendment Regarding Technical Specifications Changes Related to the Chemical and Volume Control System RNP-RA/10-0024, Request for Emergency Technical Specifications Change to Section 3.4.17, Chemical and Volume Control System (CVCS)2010-03-22022 March 2010 Request for Emergency Technical Specifications Change to Section 3.4.17, Chemical and Volume Control System (CVCS) RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0936312122009-12-16016 December 2009 Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/09-0024, Transmittal of Technical Specifications Bases Revisions2009-04-16016 April 2009 Transmittal of Technical Specifications Bases Revisions ML0813403232008-07-23023 July 2008 Issuance of Amendment Regarding the Incorporation of Technical Specification Task Force Standard Technical Specification Change Traveler, TSTF-448, Revision 3, Control Room Habitability. ML0815402792008-06-19019 June 2008 Tech Spec Pages for Amendment 218 Regarding Administrative Changes to the Operating License and Technical Specifications ML0803300542008-01-29029 January 2008 Tech Spec Pages for Amendment 217 to Make a One-time Change to Technical Specification (TS) 3.1.7 Rod Position Indication. ML0726102012007-09-19019 September 2007 Technical Specification, Correction to Technical Specification Page Issued with Amendment No. 215 Issued on June 15, 2007 ML0725706282007-09-18018 September 2007 Correction to Technical Specification Pages Issued with Amendment No. 216 Issued on July 16, 2007 RNP-RA/07-0095, Correction to Technical Specifications Page in Amendment 2162007-09-12012 September 2007 Correction to Technical Specifications Page in Amendment 216 ML0720102362007-07-16016 July 2007 Tech Spec Pages for Amendment 216 to Adopt Technical Specifications Task Force (TSTF) Standard TS Change Traveler, TSTF-447, Using the Consolidated Line Item Improvement Process ML0717202542007-06-15015 June 2007 Technical Specifications Changes Related to Containment Peak Pressure ML0709900232007-04-0404 April 2007 Technical Specifications, Changes Surveillance Requirement (SR) 3.5.2.6 RNP-RA/07-0032, Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria2007-03-22022 March 2007 Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria RNP-RA/07-0023, Response to NRC Request for Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria2007-03-13013 March 2007 Response to NRC Request for Additional Information Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Repair Criteria ML0628404592006-10-0404 October 2006 Tech Spec Pages for Amendment 208 Regarding Emergency Diesel Generator or Automatic Trips Bypass TS 3.8.1 ML0627100222006-09-22022 September 2006 Technical Specification Amendment No. 210 - H.B. Robinson, Unit 2 - Issuance of Amendment and Partial Denial Reactor Protection System and Engineered Safety Feature Actuation System Instrumentation Tables ML0627005192006-09-20020 September 2006 Technical Specifications, Amendment, Methodology for Large Break Loss-of-Coolant Accident RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure2006-07-17017 July 2006 Request for Technical Specifications, Change Related to Containment Peak Pressure ML0621900412006-07-11011 July 2006 Technical Specifications, Alternate Source Term for the loss-of-coolant RNP-RA/06-0046, Request for Technical Specifications Change to Section 3.5.2. Emergency Core Cooling System2006-06-0101 June 2006 Request for Technical Specifications Change to Section 3.5.2. Emergency Core Cooling System RNP-RA/06-0028, Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process2006-05-30030 May 2006 Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ML0610805222006-04-11011 April 2006 H. B. Robinson, Unit 2 - Request for Technical Specification Change to Core Operating Limits Report References RNP-RA/06-0027, ANP-2512(NP), Loss of Forced Reactor Coolant Flow Analysis.2006-03-31031 March 2006 ANP-2512(NP), Loss of Forced Reactor Coolant Flow Analysis. ML0524205242005-08-25025 August 2005 Tech Spec Pages for Amendment 206 DC Sources - Operation and Shutdown RNP-RA/05-0062, Response to Request for Additional Information Regarding Technical Specifications Change Request to Section 3.8.4 DC Sources - Operating2005-07-13013 July 2005 Response to Request for Additional Information Regarding Technical Specifications Change Request to Section 3.8.4 DC Sources - Operating 2023-08-29
[Table view] |
Text
Sharon W. Peavyhouse DUKE H. B.Robinson Steam Electric Plant Unit 2 ENERGY. Director - Nuclear OrganizationEffectiveness Duke EnergyProgress 3581 West Entrance Road Hartsville, SC 29550 0: 843 857 1584 F: 843 857 1319 Sharon.Peavyhouse@duke-energy.com Serial: RNP-RA/15-0026 10 CFR 50.36 APR 0 12015 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 TECHNICAL SPECIFICATIONS (TS) SECTION 5.6.6, POST ACCIDENT MONITORING (PAM) INSTRUMENTATION REPORT, 14-DAY REPORT FOR THE INOPERABILITY OF PRESSURIZER POWER OPERATED RELIEF VALVES POSITION INDICATION Ladies and Gentlemen:
Duke Energy Progress, Inc. hereby submits a report in accordance with H. B. Robinson Steam Electric Plant, Unit No. 2, Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring Instrumentation, and TS 5.6.6, Post Accident Monitoring Instrumentation Report.
The report, which is provided as an attachment to this letter, is based on the inoperability of the Pressurizer Power Operated Relief Valves (PORVs) Position Indication.
The Pressurizer PORVs position indication will be post maintenance tested and returned to operable status prior to restart from the next refueling outage, which is currently scheduled to begin on May, 12, 2015, or during the first outage of sufficient duration.
If you should have any questions concerning this matter, please contact Richard Hightower, Manager - Nuclear Regulatory Affairs at (843) 857-1329.
Sincerely, Sharon W. Peavyhouse Director - Nuclear Organization Effectiveness Attachment SWP/msc cc: Mr. V. M. McCree, NRC, Region II Ms. Martha Barillas, NRC, NRC Project Manager, NRR NRC Resident Inspector koC)
United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0026 Page 1 of 2 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 TECHNICAL SPECIFICATIONS SECTION 5.6.6 POST ACCIDENT MONITORING INSTRUMENTATION 14-DAY PRESSURIZER POWER OPERATED RELIEF VALVES POSITION INDICATION Event Description On March 18, 2015, Condition Report (CR) 738953 was written to determine if the Pressurizer Power Operated Relief Valve (PORV) limit switches met the Environmental Qualification (EQ) qualified life requirements as specified in Equipment Qualification Data Packages (EQDP)-2200.
The EQDPs are the engineering technical documents that demonstrate that a component is qualified to perform its intended design function during a Design Basis Accident. The engineering analysis in these documents consider the normal conditions when determining the qualified life of an electrical component. These documents demonstrate (in part) H. B. Robinson Steam Electric Plant, Unit No. 2's compliance with the requirements of 10CFR50.49.
The background for the identified concern is that during the EQDP revision process for Engineering Change (EC) 80767 it was found that the Qualified Life required by 10CFR50.49 and Regulatory Guide 1.97 for the NAMCO limit switches was incorrect in EQDP-2200.
The actions for Technical Specifications (TS) Section 3.3.3, Post Accident Monitoring (PAM)
Instrumentation, Table 3.3.3-1, Function 22, requires an inoperable PORV Position (Primary) channel to be restored to OPERABLE status within 7 days. Ifthis indication is not restored within 7 days, a report in accordance with TS 5.6.6 is required within the following 14 days.
TS 5.6.6 states that the report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the channel to operable status.
Preplanned Alternate Method of Monitoring Based on the above evaluation, it is recommended by Engineering that the Pressurizer PORV limit switches be considered operable in all modes of operation except for mitigating a Design Basis Accident.
Standing Instruction 15-005, effective March 20, 2015 for Pressurizer PORV limit switches, outlines the alternate method of monitoring Pressurizer PORV position until they are returned to service:
Continuous monitoring capability:
- Pressurizer PORV Relief Line temperature annunciator and indication available on the Reactor Turbine Gauge Board (RTGB) as well as the Emergency Response Facility Information System (ERFIS)
- Pressurizer Relief Tank Level, Pressure and Temperature annunciators on the RTGB as well as the ERFIS data trends
" Pressurizer Level is available on the RTGB as well as the ERFIS Event Based Monitoring Capability (Post Accident Monitoring):
- Pressurizer PORV R lief Line temperature
- Pressurizer Relief Tank Level, Pressure and Temperature
" Pressurizer Level
United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/15-0026 Page 2 of 2 These indications are available to the operators directly on the RTGB and on the plant computer, thus are readily available to trend should they be required by an event. Annunciators are also available to alert the Control Room to changes in position of the Pressurizer PORVs.
Should any of these indications fail, a work order will be initiated and performed on an emergent basis to ensure that the back-up methods for monitoring remain in place.
The TS Bases for TS 3.3.3, as it pertains to the Pressurizer PORV Limit Switches, states:
"Each PORV is equipped with two stem mounted limit switches, which are seismically qualified and powered from an emergency power source, to provide the direct (primary) means of valve position indication, from fully closed to fully open."
As stated in the TS Bases for TS 3.3.3, the Pressurizer PORV Limit Switches provide a verification indication. This monitoring capability does not directly impact safety systems or the ability to mitigate the consequences of an accident.
Cause of the Inoperability Draft and verified EQ Qualified Life calculations were completed on March 19, 2015 and showed the NAMCO Limit Switches are not currently qualified for their monitoring function during and following a Design Basis Accident. This calculation utilized more recent temperature data in determining the normal temperature conditions for the Pressurizer Cubicle. This data was derived from the plant computer and more accurately depicts the temperature environment in the Pressurizer Cubicle than was previously considered in the EQDP.
Based on the draft EQ Qualified Life analysis using the data derived from the plant computer, the subject Pressurizer PORV limit switches were determined to be qualified for a period of approximately 6 years. Current maintenance records indicate these switches were last replaced in 2002. The results are that the subject limit switches may not be capable of performing their intended design function during a Design Basis Accident.
Based on the draft EQ Qualified Life calculations discussed above, these switches could provide faulty or incorrect indications in the control room during a Design Basis Accident while performing their post-accident indicating function. It should be noted that this does not affect the day-to-day functionality of these limit switches, only their post-accident function.
Plans and Schedule for Restoring the Channel The Pressurizer PORV limit switches are in the Pressurizer cubicle inside of the containment vessel. As a result, the environmental conditions are not suitable for online maintenance due to the local ambient temperature and radiation levels. Therefore, the Pressurizer PORV limit switches will be repaired and tested prior to restart from the next refueling outage, which is currently scheduled to begin on May 12, 2015, or during the first outage of sufficient duration.