Correction to Technical Specification Pages Issued with Amendment No. 216 Issued on July 16, 2007
ML072570628
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/18/2007
From: Vaaler M
NRC/NRR/ADRO/DORL/LPLII-2
To: Walt T
Carolina Power & Light Co
Vaaler, Marlayna, NRR/DORL 415-3178
Shared Package
ML072570124 List:
References
TAC MD4250
Download: ML072570628 (1)


Text

PAM Instrumentation 3.3.3 Actions (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.

channels inoperable.

D. --------- NOTE --------- D.1 Restore required 7 days Only applicable to channel to OPERABLE Functions 3, 4, 19, status.

22, 23, and 24.

One or more Functions with one required channel inoperable.

E. Required Action and E.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C Table 3.3.3-1 for the or D not met. channel.

F. As required by F.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action E.1 AND and referenced in Table 3.3.3-1. F.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HBRSEP Unit No. 2 3.3-30 Amendment No. 216