ML072570628
| ML072570628 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 09/18/2007 |
| From: | Vaaler M NRC/NRR/ADRO/DORL/LPLII-2 |
| To: | Walt T Carolina Power & Light Co |
| Vaaler, Marlayna, NRR/DORL 415-3178 | |
| Shared Package | |
| ML072570124 | List: |
| References | |
| TAC MD4250 | |
| Download: ML072570628 (1) | |
Text
PAM Instrumentation 3.3.3 Actions (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.
channels inoperable.
D.
NOTE --------- D.1 Restore required 7 days Only applicable to channel to OPERABLE Functions 3, 4, 19, status.
22, 23, and 24.
One or more Functions with one required channel inoperable.
E.
Required Action and E.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C Table 3.3.3-1 for the or D not met.
channel.
F.
As required by F.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action E.1 AND and referenced in Table 3.3.3-1.
F.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)
HBRSEP Unit No. 2 3.3-30 Amendment No. 216