UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 21, 2013 Mr. George T. Hamrick Vice President Brunswick Nuclear Plant P. 0. Box 10429 South Port, NC 28461

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2- LICENSEE NAME CHANGE (TAC NOS. MF1463, MF1464, MF1465, AND MF1466)

Dear Mr. Hamrick:

The Commission has issued the enclosed Amendment Nos. 263, 291, 142 and 236 to Renewed Facility Operating License Nos. DPR-71, DPR-62, NPF-63, and DPR-23 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant, Unit No.2 respectively, in response to your letter dated April 20, 2013 (Agencywide Documents Access and Management System Accession No. ML13155A492). The amendments change the name of the Licensee in the operating licenses from "Carolina Power & Light Company to "Duke Energy Progress, Inc."

A copy of the Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

~ ~- oCvv-y~

Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 50-400, and 50-261

Enclosures:

1. Amendment No. 263 to DPR-71
2. Amendment No. 291 to DPR-62
3. Amendment No. 142 to NPF-63
4. Amendment No. 236 to DPR-23
5. Safety Evaluation cc w/enclosures: Distribution via ListServ

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-325 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 263 License No. DPR-71

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Energy, dated April 20, 2013, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Operating License and Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-71 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 263 , are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Douglas A. Broaddus, Acting Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Operating License and Technical Specifications Date of Issuance: October 21, 2013

ATTACHMENT TO LICENSE AMENDMENT NO. 263 RENEWED FACILITY OPERATING LICENSE NO. DPR-71 DOCKET NO. 50-325 Replace the following pages of Renewed Facility Operating License DPR-71 with the attached revised pages:

Remove Insert 1 1 2 2 3 3 4 4 4a 5 5 6 6 7 7 8

Replace the following page of Appendix "A" to the Technical Specifications with the attached revised page.

Remove Cover page of Appendix A Cover page of Appendix A NOTE: The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. The license pages have been numbered or renumbered and therefore, all the license pages have been included. Vertical lines were not used with page number changes.

DUKE ENERGY PROGRESS. INC.

DOCKET NO. 50-325 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-71

1. The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in License No. DPR-71 issued on September 8, 1976, has now found that:

A. The application for license filed by Carolina Power & Light Company* (CP&L or the licensee) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Brunswick Steam Electric Plant, Unit 1 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR-68 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21 (a)(1 ); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21 (c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commission's regulations; D. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission;

  • On April 29, 2013, the name "Carolina Power & Light Company (CP&L) was changed to "Duke Energy Progress, Inc."

Renewed License No. DPR-71 Amendment No. 263

F. The licensee is technically and financially qualified to engage in the activities authorized by this renewed operating license in accordance with the rules and regulations of the Commission; G. The licensee has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; I. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs, and considering available alternatives, the adverse environmental impacts of license renewal are not so great that preserving the option of license renewal would be unreasonable and the issuance of Renewed Facility Operating License No. DPR-71, subject to the conditions for protection of the environment set forth herein, is in accordance with 10 CFR Part 51 (formerly Appendix D to Part 50), of the Commission's regulations and all applicable requirements have been satisfied; and J. The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed license will be in accordance with the Commission's regulations in 10 CFR Part 30, 40, and 70, including 10 CFR Section 30.33, 40.32, 70.23 and 70.31.

2. Renewed Facility Operating License No. DPR-71 is hereby issued to Duke Energy Progress, Inc. to read as follows:

A. This license applies to the Brunswick Steam Electric Plant, Unit 1, a boiling water reactor and associated equipment (the facility), owned by the Duke Energy Progress, Inc. and North Carolina Eastern Municipal Power Agency and operated by Duke Energy Progress, Inc. The facility is located on the Cape Fear River, near Southport in Brunswick County, North Carolina, and is described in the "Final Safety Analysis Report" as supplemented and amended (Amendments 1 through 31) and the "Environmental Report" as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses Duke Energy Progress, Inc.:

(1) Pursuant to Section 104b of the Act and 10 CFR Part 50, "Licensing of Production and Utilization Facilities," to possess, use, and operate the facility at the designated location in Brunswick County, North Carolina, in accordance with the procedures and limitations set forth in this renewed license; Renewed License No. DPR-71 Amendment No. 263

(2) Pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use in amounts as required any byproduct, source and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No.2.

(6) Duke Energy Progress, Inc. shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report, dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994, respectively, subject to the following provisions:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

{1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts thermal.

Renewed License No. DPR-71 Amendment No. 263

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 263, are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.

(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.

Specification 4.3.3.1, Table 4.3.3-1, Items S.a and S.b (b) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:

ACTION:

a. With either one offsite circuit or one diesel generator of the above required A. C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(3) Deleted by Amendment No. 206.

D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21 are entitled: "Physical Security Plan, Revision 2," and "Safeguards Contingency Plan, Revision 2," submitted by letter Renewed License No. DPR-71 Amendment No. 263

dated May 17, 2006, and "Guard Training and Qualification Plan, Revision 0,"

submitted by letter dated September 30, 2004.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 258, as supplemented by a change approved by License Amendment No. 261.

E. This license is subject to the following additional conditions for the protection of the environment:

a. Deleted per Amendment 54, 3-11-83
b. Deleted per Amendment 54, 3-11-83
c. The licensee shall comply with the effluent limitations contained in National Pollutant Discharge Elimination System Permit No. NC0007064 issued pursuant to Section 402 of the Federal Water Pollution Control Act, as amended.

F. In accordance with the requirement imposed by the October 8, 1976, order of the United States Court of Appeals for the District of Columbia Circuit in Natural Resources Defense Council v. Nuclear Regulatory Commission, No. 74-1385 and 74-1586, that the Nuclear Regulatory Commission "shall make any licenses granted between July 21, 1976 and such time when the mandate is issued subject to the outcome of the proceedings herein," the license issued herein shall be subject to the outcome of such proceedings.

G. Deleted by Amendment No. 206.

H. This license is effective as of the date of issuance and shall expire at midnight on September 8, 2036.

I. Deleted per Amendment No. 70 dated 5-25-84.

J. Deleted per Amendment No. 70 dated 5-25-84.

K. Deleted by Amendment No. 206.

L. Power Uprate License Amendment Implementation The licensee shall complete the following actions as a condition of the approval of the power uprate license amendment (Amendment No. 183):

(1) Deleted by Amendment No. 206.

(2) Deleted by Amendment No. 206.

Renewed License No. DPR-71 Amendment No. 263

(3) Fuel Pool Decay Heat Evaluation The decay heat loads and the decay heat removal systems available for each refueling outage shall be evaluated, and bounding or outage specific analyses shall be used for various refueling sequences. Where a bounding engineering evaluation is in place, a refueling specific assessment shall be made to ensure that the bounding case encompasses the specific refueling sequence. In both cases (i.e.,

bounding or outage specific evaluations), compliance with design basis assumptions shall be verified.

(4) Deleted by Amendment No. 206.

(5) Deleted by Amendment No. 206.

M. The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21 (d),

shall be included in the next scheduled update to the UFSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license.

Until that update is complete, CP&L

  • may make changes to the programs and activities described in the supplement without prior Commission approval, provided that CP&L
  • evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

N. The UFSAR supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Duke Energy Progress, Inc.

shall complete these activities no later than September 8, 2016, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

0. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. Any changes to the BWRVIP ISP capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation.

All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

  • On April 29, 2013, the name "Carolina Power & Light Company (CP&L) was changed to "Duke Energy Progress, Inc."

Renewed License No. DPR-71 Amendment No. 263

P. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(1) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (2) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (3) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders Q. The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20,2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.
3. AddWonaiCondWons The Additional Conditions contained in Appendix B, as revised through Amendment No. 262, are hereby incorporated into this license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Additional Conditions.

FOR THE NUCLEAR REGULATORY COMMISSION

/RAJ J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments:

1. Unit 1 -Technical Specifications- Appendices A and B Date of Issuance: June 26, 2006 Renewed License No. DPR-71 Amendment No. 263

APPENDIX A TO THE FACILITY OPERATING LICENSE DPR-71 TECHNICAL SPECIFICATIONS FOR BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DUKE ENERGY PROGRESS, INC.

Renewed License No. DPR-71 Amendment No. 263

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-324 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 291 License No. DPR-62

1. The Nuclear Regulatory Commission (the Commission) has found that:
  • A. The application for amendment by Duke Energy, dated April 20, 2013, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2. Accordingly, the license is amended by changes to the Operating License and Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-62 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 291 , are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Douglas A. Broaddus, Acting Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Operating License and Technical Specifications Date of Issuance: October 21, 2013

ATTACHMENT TO LICENSE AMENDMENT NO. 291 RENEWED FACILITY OPERATING LICENSE NO. DPR-62 DOCKET NO. 50-324 Replace the following pages of Renewed Facility Operating License DPR-62 with the attached revised pages:

Remove Insert 1 1 2 2 3 3 4 4 5 5 5a 6 6 7 7 8 8 Replace the following page of Appendix "A" to the Technical Specifications with the attached revised page.

Remove Cover page of Appendix A Cover page of Appendix A NOTE: The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. The license pages have been numbered or renumbered and therefore, all the license pages have been included. Vertical lines were not used with page number changes.

DUKE ENERGY PROGRESS, INC.

DOCKET NO. 50-324 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-62

1. The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in License No. DPR-62 issued on December 27, 1974, has now found that:

A. The application for license filed by Carolina Power & Light Company* (CP&L or the licensee) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Brunswick Steam Electric Plant, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-67 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21 (a)(1 ); and (2) time-limited aging analysis that have been identified to require review under 10 CFR 54.21 (c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commission's regulations; D. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission;

  • On April 29, 2013, the name "Carolina Power & Light Company (CP&L) was changed to "Duke Energy Progress, Inc."

Renewed License No. DPR-62 Amendment No. 291

F. The licensee is technically and financially qualified to engage in the activities authorized by this renewed operating license in accordance with the rules and regulations of the Commission; G. The licensee has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; I. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Renewed Facility Operating License No. DPR-62 subject to the conditions for protection of the environment set forth herein is in accordance with 10 CFR Part 51 (formerly Appendix D to 10 CFR Part 50), of the Commission's regulations and all applicable requirements have been satisfied; and J. The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed license will be in accordance with the Commission's regulations in 10 CFR Part 30, 40, and 70, including 10 CFR Section 30.33, 40.32, and 70.23 and 70.31.

2. Renewed Facility Operating License No. DPR-62 is hereby issued to Duke Energy Progress, Inc. to read as follows:

A. This license applies to Brunswick Steam Electric Plant Unit 2, a boiling water reactor and associated equipment (the facility), owned by Duke Energy Progress, Inc. and North Carolina Eastern Municipal Power Agency and operated by Duke Energy Progress, Inc. The facility is located on the Cape Fear River, near Southport in Brunswick County, North Carolina, and is described in the "Final Safety Analysis Report" as supplemented and amended (Amendments 1 through 29) and the "Environmental Report" as supplemented and amended (Supplements 1 through 7).

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses Duke Energy Progress, Inc.:

(1) Pursuant to Section 104b of the Act and 10 CFR Part 50, "Licensing of Production and Utilization Facilities," to possess, use, and operate the facility at the designated location in Brunswick County, North Carolina, in accordance with the procedures and limitations set forth in this renewed license; (2) Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; Renewed License No. DPR-62 Amendment No. 291

(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No.2.

(6) Duke Energy Progress, Inc. shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 291, are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

Renewed License No. DPR-62 Amendment No. 291

For Surveillance Requirements (SRs) that are new in Amendment 233 to Renewed Facility Operating License DPR-62, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 233. For SRs that existed prior to Amendment 233, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 233.

(a) The end of the current surveillance period for the surveillance requirements listed below may be extended beyond the time limit specified by Technical Specification 4.0.2a. After May 1, 1982, the plant shall not be operated in Conditions 1, 2, or 3 until the surveillance requirements listed below have been completed.

Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2a shall apply.

Specification 4.3.1.1; Table 4.3.1-1, items 9 & 10 4.3.1.2 4.3.1.3; Table 3.3.1-2, item 10 4.3.2.1; Table 4.3.2-1, items 1.d & 1.f 4.3.2.3; Table 3.3.2-3, item 1.a.1 4.3.3.2; Table 4.3.3-1, items 4.c & 4.f 4.5.2.a 4.8.1.1.2.d.2 4.8.1.1.2.d.3 4.8.1.1.2.d.6 4.8.1.1.2.d.7 (b) Effective June 30, 1982, the surveillance requirements listed below need not be completed until restart for Cycle 5 or July 15, 1982, whichever occurs first. The unit shall not be operated in Conditions 1, 2 or 3 until the surveillance requirements listed below have been completed. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.

Specification 4.3.3.1 Table 4.3.3-1, Items 5.a and 5.b.

(c) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:

ACTION:

a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the Renewed License No. DPR-62 Amendment No. 291

next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

(3} Deleted by Amendment No. 236.

(4) Equalizer Valve Restriction The valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation, except for one bypass valve which is left open to prevent pressure build-up due to ambient and conduction heating of the water between the equalizer valves.

(5) Deleted by Amendment No. 233.

(6} The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822} and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:

"Physical Security Plan, Revision 2," and "Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006, and "Guard Training and Qualification Plan, Revision 0," submitted by letter dated September 30, 2004.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The licensee's CSP was approved by License Amendment No. 286, as supplemented by a change approved by License Amendment No. 289.

D. This license is subject to the following additional conditions for the protection of the environment:

a. Deleted per Amendment 79, 3-11-83
b. Deleted per Amendment 79, 3-11-83
c. Deleted per Amendment 79, 3-11-83
d. The licensee shall comply with the effluent limitations contained in National Pollutant Discharge Elimination System Permit No. NC0007064 issued pursuant to Section 402 of the Federal Water Pollution Control Act, as amended.

E. This license is effective as of the date of issuance and shall expire at midnight on December 27, 2034.

F. Deleted per Amendment No. 98 dated 5-25-84.

G. Deleted per Amendment No. 98 dated 5-25-84.

Renewed License No. DPR-62 Amendment No. 291

H. Deleted by Amendment No. 236.

I. Power Uprate License Amendment Implementation The licensee shall complete the following actions as a condition of the approval of the power uprate license amendment (Amendment No. 214):

(1) Deleted by Amendment No. 236.

(2) Deleted by Amendment No. 236.

(3) Fuel Pool Decay Heat Evaluation The decay heat loads and the decay heat removal systems available for each refueling outage shall be evaluated, and bounding or outage specific analyses shall be used for various refueling sequences. Where a bounding engineering evaluation is in place, a refueling specific assessment shall be made to ensure that the bounding case encompasses the specific refueling sequence. In both cases (i.e.,

bounding or outage specific evaluations), compliance with design basis assumptions shall be verified.

(4) Deleted by Amendment No. 236.

(5) Deleted by Amendment No. 236.

J. The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21 (d),

shall be included in the next scheduled update to the UFSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license.

Until that update is complete, CP&L

  • may make changes to the programs and activities described in the supplement without prior Commission approval, provided that CP&L
  • evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

K. The UFSAR supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Duke Energy Progress, Inc.

shall complete these activities no later than December 27, 2014, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

  • On April 29, 2013, the name "Carolina Power & Light Company" (CP&L) was changed to "Duke Energy Progress, Inc."

Renewed License No. DPR-62 Amendment No. 291

L. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. Any changes to the BWRVIP ISP capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation.

All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

M. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(1) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (2) Operations to mitigate fuel damage considering the following:

1 . Protection and use of personnel assets

2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (3) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders N. The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20,2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

Renewed License No. DPR-62 Amendment No. 291

3. Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 290, are hereby incorporated into this license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Additional Conditions.

FOR THE NUCLEAR REGULATORY COMMISSION

/RAJ J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments:

1. Unit 2- Technical Specifications- Appendices A and B Date of Issuance: June 26, 2006 Renewed License No. DPR-62 Amendment No. 291

APPENDIX A TO THE FACILITY OPERATING LICENSE DPR-62 TECHNICAL SPECIFICATIONS FOR BRUNSWICK STEAM ELECTRIC PLANT UNIT2 DUKE ENERGY PROGRESS, INC.

Renewed License No. DPR-62 Amendment No. 291

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 142 License No. NPF-63

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Energy, dated April 20, 2013, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Operating License and Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-63 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 142 , are hereby incorporated into this license.

Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Douglas A. Broaddus, Acting Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Operating License and Technical Specifications Date of Issuance: October 21, 2013

ATTACHMENT TO LICENSE AMENDMENT NO. 142 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of Renewed Facility Operating License NPF-63 with the attached revised pages:

Remove Insert 1 1 2 2 3 3 4 4 4a 5 5 8 8 11 11 Replace the following pages of Appendix "B" to the Technical Specifications (Environmental Protection Plan) and Appendix "C" to the Technical Specifications (Antitrust Conditions) with the attached revised pages.

Remove Cover page for Appendix "B" Cover page for Appendix "B" Appendix C Appendix C The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

DUKE ENERGY PROGRESS, INC.

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-63

1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A. The application for renewal of the license filed by the Carolina Power & Light Company* (CP&L) for itself, and the North Carolina Eastern Municipal Power Agency (the licensee), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Shearon Harris Nuclear Power Plant, Unit 1, (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-158 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21 (a)(1 ); and (2) time-limited aging analysis that have been identified to require review under 10 CFR 54.21 (c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commission's regulations; D. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D. below);

E. There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below);

  • on April 29, 2013, the name "Carolina Power & Light Company (CP&L) was changed to "Duke Energy Progress, Inc."

Renewed License No. NPF-63 Amendment No. 142

F. Duke Energy Progress, Inc: is technically qualified to engage in the activities authorized by this license in accordance with the Commission's regulations set forth in 10 CFR Chapter I; G. The licensees have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; H. The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; I. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this Renewed Facility Operating License No.

NPF-63, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; J. The receipt, possession and use of source, byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40, and 70.

2. Based on the foregoing findings and the Partial Initial Decisions issued by the Atomic Safety and Licensing Board dated February 20, 1985, August 20, 1985, December 11, 1985, and April 28, 1986, regarding this facility and pursuant to approval by the Nuclear Regulatory Commission at a meeting on January 8, 1987, Facility Operating License No. NPF-63, which supersedes the license for fuel loading and low power testing, License No. NPF-53 issued on October 24, 1986, is hereby issued to Duke Energy Progress, Inc. and the North Carolina Eastern Municipal Power Agency (the licensees) as follows:

A. This license applies to the Shearon Harris Nuclear Power Plant, Unit 1, a pressurized water reactor and associated equipment (the facility) owned by the North Carolina Eastern Municipal Power Agency and Duke Energy Progress, Inc.,

and operated by Duke Energy Progress, Inc. The facility is located on the licensees' site in Wake and Chatham Counties, North Carolina, approximately 16 miles southwest of the nearest boundary of Raleigh, and is described in the Final Safety Analysis Report, as supplemented and amended, and in its Environmental Report, as supplemented and amended;

  • Duke Energy Progress, Inc. is authorized to act for the North Carolina Eastern Municipal Power Agency, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

Renewed License No. NPF-63 Amendment No. 142

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1) Pursuant to Section 103 of the Act and 10 CFR Part 50, Duke Energy Progress, Inc. to possess, use, and operate the facility at the designated location in Wake and Chatham Counties, North Carolina, in accordance with the procedures and limitations set forth in this license; (2) Pursuant to the Act and 10 CFR Part 50, North Carolina Eastern Municipal Power Agency to possess the facility at the designated location in Wake and Chatham Counties, North Carolina, in accordance with the procedures and limitations set forth in the license; (3) Pursuant to the Act and 10 CFR Part 70, Duke Energy Progress, Inc. to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Duke Energy Progress, Inc. to receive, possess, and use at any time any byproduct, source and special nuclear material such as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Duke Energy Progress, Inc. receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Duke Energy Progress, Inc. to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein; (7) Pursuant to the Act and 10 CFR Parts 30 and 40, Duke Energy Progress, Inc. to receive, possess and process for release or transfer to the Shearon Harris site such byproduct material as may be produced by the Shearon Harris Energy and Environmental Center; (8) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Duke Energy Progress, Inc. to receive and possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the Brunswick Steam Electric Plant, Units 1 and 2, and H. B. Robinson Steam Electric Plant, Unit 2.

Renewed License No. NPF-63 Amendment No. 142

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.

(1) Maximum Power Level Duke Energy Progress, Inc. is authorized to operate the facility at reactor core power levels not in excess of 2948 megawatts thermal (1 00 percent rated core power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 142, are hereby incorporated into this license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Antitrust Conditions Duke Energy Progress, Inc. shall comply with the antitrust conditions delineated in Appendix C to this license.

(4) Initial Startup Test Program (Section 14) 1 Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

1 The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Renewed License No. NPF-63 Amendment No. 142

- 4a-(5) Steam Generator Tube Rupture (Section 15.6.3)

Prior to startup following the first refueling outage, Carolina Power & Light Company' shall submit for NRC review and receive approval if a steam generator tube rupture analysis, including the assumed operator actions, which demonstrates that the consequences of the design basis steam generator tube rupture event for the Shearon Harris Nuclear Power Plant are less than the acceptance criteria specified in the Standard Review Plan, NUREG-0800, at 15.6.3 Subparts II {1) and (2) for calculated doses from radiological releases. In preparing their analysis Carolina Power &

Light Company' will not assume that operators will complete corrective actions within the first thirty minutes after a steam generator tube rupture.

  • on April29, 2013, the name "Carolina Power & Light Company (CP&L) was changed to "Duke Energy Progress, Inc."

Renewed License No. NPF-63 Amendment No. 142

(6} Detailed Control Room Design Review (Item I.D.1, Section 18)

Carolina Power & Light" shall submit the final results of the control room surveys prior to startup following the first refueling outage.

(7) Safety Parameter Display System (Section 18.2.1)

Carolina Power & Light Company' shall submit to the NRC for review prior to startup following the first refueling:

(a) The final Validation Test Report, (b) The resolution of additional human engineering deficiencies identified on the safety parameter display system.

(8) Deleted (9) Formal Federal Emergency Management Agency Finding In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provisions of 10 CFR Section 50.54(s)(2} will apply.

(1 0) Fresh Fuel Storage The following criteria apply to the storage and handling of new fuel assemblies in the Fuel Handling Building:

(a) The minimum edge-to-edge distance between a new fuel assembly outside its shipping container or storage rack and all other new fuel assemblies shall be at least 12 inches.

(b) New fuel assemblies shall be stored in such a manner that water would drain freely from the assemblies in the event of flooding and subsequent draining of the fuel storage area.

  • on April29, 2013, the name "Carolina Power & Light Company (CP&L} was changed to "Duke Energy Progress, Inc."

Renewed License No. NPF-63 Amendment No. 142

E. Physical and Cyber Security (Section 13.6.2.1 0)

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Guard Training and Qualification Plan" submitted by letter dated October 19, 2004, "Physical Security Plan" and "Safeguards Contingency Plan" submitted by letter dated October 19, 2004 as supplemented by letter dated May 16, 2006.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 136, as supplemented by a change approved by License Amendment No. 140 F. Fire Protection Program Duke Energy Progress, Inc. shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the revised license amendment request dated October 9, 2009, supplemented by letters dated February 4, 2010, and April 5, 201 0, and approved in the associated safety evaluation dated June 28, 201 0.

Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c) and NFPA 805, and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.

(1) Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as-operated and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the proposed change may include methods that have been used in the peer-reviewed Fire PRA model, methods that have been approved by the NRC via a plant-specific license amendment or through NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.

Renewed License No. NPF-63 Amendment No. 142

(c) The licensee shall maintain appropriate compensatory measures in place until completion of the modifications delineated above.

G. Reporting to the Commission Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, Duke Energy Progress, Inc. shall report any violations of the requirements contained in Section 2.C of this license in the following manner:

initial notification shall be made within twenty-four (24) hours to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73 (b),

(c) and (e).

H. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

I. The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, CP&L.

may make changes to the programs and activities described in the supplement without prior Commission approval, provided that CP&L. evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

J. The Updated Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Duke Energy Progress, Inc. shall complete these activities no later than October 24, 2026, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation.

All capsules placed in storage must be maintained for future inspection. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

  • on April 29, 2013, the name "Carolina Power & Light Company" (CP&L) was changed to "Duke Energy Progress, Inc."

Renewed License No. NPF-63 Amendment No. 142

APPENDIX B TO FACILITY OPERATING LICENSE NO. NPF-63 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DUKE ENERGY PROGRESS, INC.

DOCKET NO. 50-400 ENVIRONMENTAL PROTECTION PLAN (NON RADIOLOGICAL)

JANUARY 1987 Renewed License No. NPF-63 Amendment No. 142

January 12, 1987 License No. NPF-63 APPENDIXC ANTITRUST CONDITIONS The licensee, Duke Energy Progress, Inc. is subject to the following antitrust conditions:

Commitment No. 1 Licensee recognizes that it is generally in the public interest for electric utilities to interconnect, coordinate reserves, and engage in bulk power supply transactions, in order to increase electric system reliability and reduce the costs of electric power. Bulk power supply arrangements should be such as to provide benefits, on balance, each to licensee and to otherparticipant(s),

respectively. The benefits to participants in such arrangements need not be equal and the benefits realized by a small system may be proportionately greater than those realized by a larger system. In implementing the commitments Vlhich it makes in the succeeding paragraphs, licensee will act in accordance with the foregoing principles.

Explanatory Note*

(a) Neither licensee nor any other participant shall be obligated to enter into such arrangements (1) if to do so would violate, incapacitate, or limit its ability to perform any other existing contractual arrangement, or (2) to do so would adversely affect its system operations or the reliability of power supply to its customers, or (3) if to do so would jeopardize the licensee's ability to finance or construct on reasonable terms facilities needed to meet its O\Ml anticipated system requirements.

Commitment No. 2 Licensee will interconnect with and coordinate reserves by means of the sale and exchange of emergency bulk power with any entity or entities in its service area** engaging in or proposing to engage in electric bulk power supply on terms that will provide for licensee's costs (including a reasonable return) in connection therewith; and allow the other participant(s), as well as licensee, full access on a proportionate basis to the benefits of reserve coordination.

("Proportionate basis" refers to the equalized percentage of reserves concept rather than the largest single-unit concept, unless all participants otherwise agree).

  • In order to clarify the commitments, certain explanatory notes have been added.
    • The use of the term "service area" as found in this commitment or in any other section of the commitments is intended to describe those areas in North Carolina and South Carolina where licensee provides some class of electric service, but in no way indicates an assignment or allocation of wholesale market areas.

Amendment No. 142

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 236 License No. DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Energy, dated April 20, 2013, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Operating License and Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-23 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 236 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Douglas A. Broaddus, Acting Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Operating License and Technical Specifications Date of Issuance: October 21, 2013

ATTACHMENT TO LICENSE AMENDMENT NO. 236 RENEWED FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Replace the following pages of Renewed Facility Operating License DPR-23 with the attached revised pages:

Remove Insert 1 1 2 2 3 3 4 4 5 5 7 7 Replace the following pages of Appendix "A" to the Technical Specifications and Appendix B to the Technical Specifications (Additional Conditions) with the attached revised page.

Remove Cover page of Appendix A Cover page of Appendix A Page 1 of Appendix B Page 1 of Appendix B The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

DUKE ENERGY PROGRESS, INC.

DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 RENEWED FACILITY OPERATING LICENSE NO. DPR-23 The U.S. Nuclear Regulatory Commission (the Commission) having previously made the findings set forth in License No. DPR-23 issued July 31, 1970, has now found that:

a. The application to renew License No. DPR-23 filed by Carolina Power & Light Company* (the licensee) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 Code of Federal Regulations (1 0 CFR) Chapter I, and all required notifications to other agencies or bodies have been duly made;
b. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21 (a)(1 ), and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21 (c), such that there is reasonable assurance that the activities authorized by this renewed license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for H. B. Robinson Steam Electric Plant, Unit No.2, and that any changes made to the plant's current licensing basis in order to comply with 10 CFR 54.29(a) are in accord with the Act and the Commission's regulations;
c. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission;
d. There is reasonable assurance (i)(a) that initial fuel loading can be conducted in accordance with this license without endangering the health and safety of the public, (i)(b) that upon completion of the Hot Laboratory and installation and testing of the secondary system as described in the applicant's letter dated July 16, 1970, and as noted in subparagraph 3.A., the facility can be operated at steady state power levels up to 5 megawatts thermal in accordance with this license without endangering the health and safety of the public, and (i)(c) that, upon satisfactory completion of the seismic analysis of Class I piping and equipment and upon satisfactory completion of all the items described in the applicant's letter dated July 16, 1970, except the auxiliary safety device on the crane for handling a spent fuel cask which will be installed prior to handling irradiated fuel with the cask, the facility can be operated at steady state power levels up to 2339 megawatts thermal in accordance with this renewed license without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the regulations of the Commission;
  • On April 29, 2013, the name Carolina Power & Light Company (CP&L) was changed to Duke Energy Progress, Inc.

Renewed Facility Operating License No. DPR-23 Amendment No. 236

e. The applicant is technically and financially qualified to engage in the activities authorized by this renewed license in accordance with the rules and regulations of the Commission;
f. The applicant has furnished proof of financial protection to satisfy the requirements of 10 CFR Part 140;
g. The issuance of this renewed license will not be inimical to the common defense and security or to the health and safety of the public; and
h. After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available alternatives, the Commission concludes that the issuance of Renewed Operating License No. DPR-23 is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

On the basis of the forgoing findings regarding this facility, Facility Operating License No.

DPR-23, issued July 31, 1970, is superseded by Renewed Facility Operating License No.

DPR-23, which is hereby issued to the Carolina Power & Light Company (CP&L),

  • to read as follows:
1. This renewed license applies to the H. B. Robinson Steam Electric Plant, Unit No.2 nuclear facility, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the applicant's H. B. Robinson site, Darlington County, about 4.5 miles west northwest of Hartsville, South Carolina, and is described in the "Final Facility Description and Safety Analysis Report," as amended (Amendment Nos. 8 through 21 ),

and in the reports filed with the applicant's letters dated June 5, 1970 and July 1, 1970.

2. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses (CP&L)*:

A. Pursuant to Section 104b of the Atomic Energy Act of 1954, as amended (the Act), and 10 CFR Part 50, "Licensing of Production and Utilization Facilities," to possess, use, and operate the facility as a utilization at the designated location on the H. B. Robinson site in Darlington County, South Carolina in accordance with the procedures and limitations set forth in this renewed license; B. Pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report as supplemented and amended; C. Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;

  • On April 29, 2013, the name Carolina Power & Light Company (CP&L) was changed to Duke Energy Progress, Inc.

Renewed Facility Operating License No. DPR-23 Amendment No. 236

D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; E. Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.

3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

A. Maximum Power Level The licensee is authorized to operate the facility at a steady state reactor core power level not in excess of 2339 megawatts thermal.

B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 236 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

(1) For Surveillance Requirements (SRs) that are new in Amendment 176 to Final Operating License DPR-23, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 176. For SRs that existed prior to Amendment 176, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 176.

Renewed Facility Operating License No. DPR-23 Amendment No. 236

C. Reports Duke Energy Progress, Inc. shall make certain reports in accordance with the requirements of the Technical Specifications.

D. Records Duke Energy Progress, Inc. shall keep facility operating records in accordance with the requirements of the Technical Specifications.

E. Fire Protection Program Duke Energy Progress, Inc. shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Fire Protection Safety Evaluation Report dated February 28, 1978, and supplements thereto. Duke Energy Progress, Inc. may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

F. Physical Protection and Cyber Security The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "H. B.

Robinson Steam Electric Plant Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0" submitted by letter dated October 1, 2004, as supplemented by letter dated October 20, 2004.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 226, as supplemented by a change approved by License Amendment No. 230.

G. The following programs shall be implemented and maintained by the licensee:

(1) DELETED Renewed Facility Operating License No. DPR-23 Amendment No. 236

(2) DELETED (3) A program to determine the airborne iodine concentration in vital areas under accident conditions. This program shall include: training of personnel, procedures for monitoring, and provisions for maintenance of sampling and analysis equipment.

(4) DELETED H. DELETED I. DELETED J. DELETED K. Updated Final Safety Analysis Report The Carolina Power & Light Company* Updated Final Safety Analysis Report supplement, submitted pursuant to 10 CFR 54.21 (d), describes certain future activities to be completed prior to the period of extended operation. The Carolina Power & Light Company* shall complete these activities no later than July 31, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

The Updated Final Safety Analysis Report supplement, as revised, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4) following issuance of this renewed license. Until that update is complete, the Carolina Power & Light Company* may make changes to the programs and activities described in the supplement without prior Commission approval, provided that the Carolina Power & Light Company*

evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

  • On April 29, 2013, the name Carolina Power & Light Company (CP&L) was changed to Duke Energy Progress, Inc.

Renewed Facility Operating License No. DPR-23 Amendment No. 236

4. Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 236, are hereby incorporated into this license. Duke Energy Progress, Inc. shall operate the facility in accordance with the additional conditions.
5. This renewed license is effective as of the date of issuance and shall expire at midnight on July 31, 2030.

FOR THE NUCLEAR REGULATORY COMMISSION ORIGINAL SIGNED BY J. E. DYER J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments: 1. Appendix A- Technical Specifications

2. Appendix B- Additional Conditions Date of Issuance: April 19, 2004 Renewed Facility Operating License No. DPR-23 Amendment No. 236

APPENDIX A TO THE RENEWED FACILITY OPERATING LICENSE DPR-23 TECHNICAL SPECIFICATIONS FOR H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO.2 DUKE ENERGY PROGRESS, INC.

DARLINGTON COUNTY, S.C.

DOCKET NO. 50-261 HBRSEP, Unit No.2 Amendment No. 236

APPENDIX B ADDITIONAL CONDITIONS FACILITY OPERATING LICENSE NO. DPR-23 Duke Energy Progress, Inc. (the term licensee in Appendix B refers to Duke Energy Progress, Inc.) shall comply with the following conditions on the schedules noted below:

Amendment Number Additional Conditions Implementation Date 176 The licensee is authorized to relocate This amendment is certain requirements included in effective immediately Appendix A and the former Appendix and shall be B to licensee-controlled documents. implemented within Implementation of this amendment 90 days of the date of shall include the relocation of these this amendment.

requirements to the appropriate documents, as described in the licensee's letters dated September 10, 1997, and October 13, 1997, evaluated in the NRC staff's Safety Evaluation enclosed with this amendment.

219 Upon implementation of the amendment This amendment is adopting TSTF-448, Revision 3, the effective immediately determination of control room envelope and shall be (CRE) unfiltered air inleakage as required implemented as by TS 5.5.17.c.(i), the assessment of CRE specified habitability as required by TS 5.5.17.c.(ii),

and the measurement of CRE pressure as required by TS 5.5.17.d, shall be considered met. Following implementation:

(a) The first performance of TS 5.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from January 27,2003, the HBRSEP, Unit No. 2 1 Amendment No. 236

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 263,291, 142, AND 236 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-71, DPR-62, NPF-63, AND DPR-23 CAROLINA POWER & LIGHT COMPANY, ET AL.

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT. UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT. UNIT NO.2 DOCKET NOS. 50-325, 50-324, 50-400, AND 50-261

1.0 INTRODUCTION

By application dated April 20, 2013 (Agencywide Documents Access and Management System Accession No. ML13155A492), Duke Energy requested changes to the operating licenses for Brunswick Steam Electric Plant (Brunswick), Unit Nos. 1 and 2, Shearon Harris Nuclear Power Plant (Harris), Unit 1, and H. B. Robinson Steam Electric Plant (Robinson), Unit No. 2.

The requested revision to the operating licenses reflects the change in the name of the licensee from "Carolina Power & Light Company to "Duke Energy Progress, Inc."

2.0 REGULATORY EVALUATION

The proposed name change to the operating licenses for Brunswick, Unit Nos. 1 and 2, Harris, Unit 1, and Robinson, Unit No. 2 was submitted to the Nuclear Regulatory Commission (NRC) pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 50, Section 50.90. The amendments are submitted for the purpose of changing the Technical Specifications and affected license pages to reflect a name change to Duke Energy Progress, Inc.

The change is editorial in nature because it involves only a name change. The corporate existence continues uninterrupted, all legal characteristics remain the same and no transfer within the scope of 10 CFR 50.80 will occur with the name change.

3.0 TECHNICAL EVALUATION

On March 8, 2013, Duke Energy filed "Articles of Amendment" to its Articles of Incorporation with the State of North Carolina Department of the Secretary of State indicating its corporate name was changing to Duke Energy Progress, Inc. The name change became effective April 29, 2013.

As stated above, the proposed amendments to the operating licenses for Brunswick, Unit Nos. 1 and 2, Harris, Unit 1, and Robinson, Unit No. 2 are for a change in the name of the licensee only. The corporate existence continues uninterrupted and all legal characteristics remain the same. Thus, there is no change in the ownership, state of incorporation, registered agent, registered office, directors, officers, rights or liabilities of the corporation, nor is there a change in the function of the corporation or the way in which it does business.

The corporation's financial responsibility for the facility, including decommissioning, and its sources of funds to support the facility remain the same.

The name change does not impact the corporation's ability to comply with any of its obligations or responsibilities under the renewed facility operating licenses. The proposed change does not alter any technical content of the license or involve any change in the qualifications of the licensee. The name change will have no impact on the design, function, or operation of any plant structures, systems, or components. Limiting Conditions for Operation, Limiting Safety System Settings and Safety Limits specified in the Technical Specifications will not be affected by the name change. Also, the updated final safety analysis will not be materially changed by the proposed name change. The current design basis and licensing basis will remain the same.

Based on the above, the NRC staff finds the name change to be editorial in nature and will not affect in any way the safe operation of Brunswick, Unit Nos. 1 and 2, Harris, Unit 1 and Robinson, Unit No.2. Therefore, the NRC staff finds the name change to the licenses acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the State of North Carolina official was notified of the proposed issuance of the amendments for Brunswick and Harris, and the State of South Carolina official was notified of the proposed issuance of the amendments for Robinson. The officials of the States had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

S The amendments provide for a licensee name change only, therefore, the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (78 FR 31982, dated May 28, 2013, and 78 FR 37595, dated June 21, 2013). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(1 0). Pursuant to 10 CFR 51.22(b) no environmental

impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: {1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of these amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: Siva P. Lingam Date: October 21, 2013

October 21, 2013 Mr. George T. Hamrick Vice President Brunswick Nuclear Plant P. 0. Box 10429 South Port, NC 28461

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2- LICENSEE NAME CHANGE (TAC NOS. MF1463, MF1464, MF1465, AND MF1466)

Dear Mr. Hamrick:

The Commission has issued the enclosed Amendment Nos. 263, 291, 142, and 236 to Renewed Facility Operating License Nos. DPR-71, DPR-62, NPF-63, and DPR-23 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and H. B.

Robinson Steam Electric Plant, Unit No. 2 respectively, in response to your letter dated April 20, 2013 (Agencywide Documents Access and Management System Accession No. ML13155A492). The amendments change the name of the Licensee in the operating licenses from "Carolina Power & Light Company to "Duke Energy Progress, Inc."

A copy of the Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely, IRA/

Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 50-400, and 50-261

Enclosures:

1. Amendment No. 263 to DPR-71
2. Amendment No. 291 to DPR-62
3. Amendment No. 142 to NPF-63
4. Amendment No. 236 to DPR-23
5. Safety Evaluation cc w/enclosures: Distribution via ListServ DISTRIBUTION:

PUBLIC RidsNrrDssStsb Resource RidsAcrsAcnw_MaiiCTR Resource LPL2-2 R/F RidsNrrDoriDpr Resource RidsNrrDoriLpl2-2 Resource RidsNrrLABCiayton Resource RidsNrrPMShearonHarris Resource RidsNrrPMBrunswick Resource RidsNrrLABCiayton Resource RidsNrrDraAhpb Resource RidsRgn2MaiiCenter Resource ADAMS Access1on No.: ML13267A293 *su b"IJeC t t o commen ts OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/PM LPL2-2/PM DRA/AHPB OGC (NLO)* LPL2-2/BC (A)

NAME Slingam BCiayton AHon CGratton UShoop CKanatas DBroaddus DATE 9/30/13 9/30/13 9/30/13 10/2/13 10/2/13 10/8/13 10/21/13 OFFICIAL RECORD COPY