ML13298A135

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance Review of LAR Associated with Modification to TS 3.8.1 Regarding Diesel Generator Testing Requirements
ML13298A135
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/21/2013
From: Siva Lingam
Plant Licensing Branch II
To: Connelly S
Duke Energy Corp
References
MF2717
Download: ML13298A135 (2)


Text

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, October 21, 2013 4:34 PM To: Connelly, Scott (Scott.Connelly@duke-energy.com)

Cc: Broaddus, Doug; Quichocho, Jessie; Zimmerman, Jacob; Elliott, Robert; Mathew, Roy; Matharu, Gurcharan; Waig, Gerald; Hemphill, Khadijah; richard.hightower@pgnmail.com

Subject:

H. B. Robinson, Unit 2 - Acceptance Review of LAR Associated with Modification to TS 3.8.1 Regarding Diesel Generator Testing Requirements (TAC No. MF2717)

By letter dated September 10, 2013 (ADAMS Accession No. ML13261A289), Duke Energy submitted a license amendment request (LAR) for H. B. Robinson Steam Electric Plant, Unit No. 2. The proposed change would revise H. B. Robinson Steam Electric Plants Technical Specification Limiting Condition for Operation 3.8.1, Required Action (RA) B.3.2.2, One DG [Diesel Generator] Inoperable - Perform SR [Surveillance Requirement] 3.8.1.2 for OPERABLE DG within 96 hours4 days <br />0.571 weeks <br />0.132 months <br />, by a NOTE clarifying RA B.3.2.2 which states, Not required to be performed when the cause of the inoperable DG is pre-planned maintenance and testing. The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)

Sequoyah Nuclear Plant St. Lucie Plant Robinson Steam Electric Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 888 Mail Envelope Properties (Siva.Lingam@nrc.gov20131021163300)

Subject:

H. B. Robinson, Unit 2 - Acceptance Review of LAR Associated with Modification to TS 3.8.1 Regarding Diesel Generator Testing Requirements (TAC No. MF2717)

Sent Date: 10/21/2013 4:33:52 PM Received Date: 10/21/2013 4:33:00 PM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Broaddus, Doug" <Doug.Broaddus@nrc.gov>

Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>

Tracking Status: None "Zimmerman, Jacob" <Jacob.Zimmerman@nrc.gov>

Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>

Tracking Status: None "Mathew, Roy" <Roy.Mathew@nrc.gov>

Tracking Status: None "Matharu, Gurcharan" <Gurcharan.Matharu@nrc.gov>

Tracking Status: None "Waig, Gerald" <Gerald.Waig@nrc.gov>

Tracking Status: None "Hemphill, Khadijah" <Khadijah.Hemphill@nrc.gov>

Tracking Status: None "richard.hightower@pgnmail.com" <richard.hightower@pgnmail.com>

Tracking Status: None "Connelly, Scott (Scott.Connelly@duke-energy.com)" <Scott.Connelly@duke-energy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2273 10/21/2013 4:33:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: