Letter Sequence Other |
---|
TAC:MD9990, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis., L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer., L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project., L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages, L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit, L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report., L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083230111, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710683, ML090710684, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092290250, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100280558... further results
|
MONTHYEARML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other ML0914101242008-08-11011 August 2008 Monticello - Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis.2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis. Project stage: Other ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate. Project stage: Request ML0832301112008-11-0505 November 2008 Monticello Nuclear Generating Plant, License Amendment Request: Extended Power Uprate Project stage: Other ML0832301142008-11-0505 November 2008 Monticello Nuclear Generating Plant, Steam Dryer Dynamic Stress Evaluation. Project stage: Request ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Monticello Extended Power Uprate (Usnrc TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate. Project stage: Other ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101222008-12-18018 December 2008 Monticello - Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0914101212008-12-19019 December 2008 Monticello - Calculation CA-95-073, Revision 4, Reactor Low Water Level SCRAM Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Monticello, Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Monticello, Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 5382009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other ML0907106842009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0914101232009-05-0606 May 2009 Monticello - Calculation 96-054, Rev 5, Turbine Stop Valve Closure/Generator Load Reject Scram Bypass Project stage: Other ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure Project stage: Other ML0914101202009-05-13013 May 2009 Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 Project stage: Request L-MT-09-045, Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 20092009-05-26026 May 2009 Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009 Project stage: Request L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 20092009-05-29029 May 2009 Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 Project stage: Request 2009-02-24
[Table View] |
|
---|
Category:Report
MONTHYEARL-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) ML23172A1112023-06-21021 June 2023 SLRA - Requests for Confirmation of Information - Set 1 L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-004, Technical Specification 5.6.4 Post Accident Monitoring Report2022-01-20020 January 2022 Technical Specification 5.6.4 Post Accident Monitoring Report ML21211A5962021-06-30030 June 2021 Attachments 9a, B, 10a, B, 11a, 12a and 13a and 13b, Including ANP-3933NP, Revision 0, Monticello ATWS-I Evaluation for Atrium 11 Fuel, Affidavit L-MT-21-016, Nuclear Material Transaction Report2021-03-25025 March 2021 Nuclear Material Transaction Report L-MT-20-002, 10 CFR 50.55a(z)(1) Request RR-015: Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange2020-01-31031 January 2020 10 CFR 50.55a(z)(1) Request RR-015: Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange ML19308A0562019-10-0808 October 2019 Enclosure 1 - Notification of Changes to the Emergency Response Data System (ERDS) L-MT-19-020, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ..2019-04-25025 April 2019 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions .. L-MT-17-060, Steam Dryer Visual Inspection Report2017-08-10010 August 2017 Steam Dryer Visual Inspection Report L-MT-17-055, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4, Path 42017-07-26026 July 2017 Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4, Path 4 ML17088A5272017-03-31031 March 2017 NSIR Dpcp Confirmatory Review Report, 10 CFR 50.54(p)(2) Changes to the Security Plan, Revision 16, Northern States Power Company, Monticello Nuclear Generating Plant L-MT-17-015, Mitigating Strategies Flood Hazard Assessment (MSA) Submittal2017-03-28028 March 2017 Mitigating Strategies Flood Hazard Assessment (MSA) Submittal ML16302A2462016-10-28028 October 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima.. ML16221A2752016-07-31031 July 2016 ANP-3274NP, Revision 2, Analytical Methods for Monticello ATWS-I. L-MT-16-037, ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I.2016-07-31031 July 2016 ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I. L-MT-16-010, Enclosure 2 Areva Report ANP-3295NP, Rev. 3, Monticello Licensing Analysis for EFW (Epu/Mella+).2016-02-29029 February 2016 Enclosure 2 Areva Report ANP-3295NP, Rev. 3, Monticello Licensing Analysis for EFW (Epu/Mella+). ML15274A4752015-09-29029 September 2015 Enclosure 6, Areva Report ANP-3435NP, Revision 0 to Are VA Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW LAR (Non-Proprietary) L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits ML15274A4742015-09-29029 September 2015 Enclosure 4, Engineering Evaluation, EC 25987, Calculation Framework for the Extended Flow Window Stability (Efws) Setpoints ML15175A3362015-07-0808 July 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force ML15169A3582015-06-11011 June 2015 PSP Rev 14 Technical Review 06-11-15 ML16035A1842015-01-30030 January 2015 Document 51-9234641-001, Technical Report of the Demonstration of UT NDE Procedure 54-UT-114-000, Phased Array Ultrasonic Examination of Dry Storage Canister Lid Welds. ML16035A1862015-01-30030 January 2015 54-PQ-114-001, Technical Justification, Phased Array Ultrasonic Examination of Dry Storage Canister Lid Welds. Part 2 of 3 ML16035A1852015-01-30030 January 2015 54-PQ-114-001, Technical Justification, Phased Array Ultrasonic Examination of Dry Storage Canister Lid Welds. Part 1 of 3 L-MT-14-103, Areva Report ANP-3376NP, Rev. 0, Supplement to Xcel Energy License Amendment Request for Areva Extended Flow Window, Enclosure 2 to L-MT-14-1032014-12-31031 December 2014 Areva Report ANP-3376NP, Rev. 0, Supplement to Xcel Energy License Amendment Request for Areva Extended Flow Window, Enclosure 2 to L-MT-14-103 ML16005A1102014-09-25025 September 2014 Redacted 2014 Decommissioning Cost Analysis for the Prairie Island Nuclear Generating Plant L-MT-14-075, LTR-BWR-ENG-14-043-NP, Responses to the Us NRC Request for Additional Information Relative to the Monticello Replacement Steam Dryer Acoustic/Structural Analyses Set 8.2014-09-19019 September 2014 LTR-BWR-ENG-14-043-NP, Responses to the Us NRC Request for Additional Information Relative to the Monticello Replacement Steam Dryer Acoustic/Structural Analyses Set #8. ML14269A3252014-09-0505 September 2014 LTR-BWR-ENG-14-037-NP, Alternate Power Ascension Process. ML14269A3232014-09-0505 September 2014 LTR-BWR-ENG-14-034-NP, Investigation Into the Cause of Exceeding the Level 1 (L1) and Level 2 (L2) Limit Curves Generated Based on 2011 Monticello Main Steam Line Strain Gauge Data. ML14204A6232014-07-18018 July 2014 Enclosure 3, Attachment - Response to the Us NRC Request for Additional Information Relative to the Monticello Replacement Steam Dryer Accoustic/Structural Ananlyses Set #7 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records ML14136A2892014-05-12012 May 2014 14C4229-RPT-001, Revision 3, Monticello Nuclear Generating Plant Seismic Hazard and Screening Report. L-MT-14-041, ANP-3304NP, Rev. 0, Areva Response to NRC Follow-Up on Srxb RAI-6: ASME Overpressure Analysis.2014-05-0909 May 2014 ANP-3304NP, Rev. 0, Areva Response to NRC Follow-Up on Srxb RAI-6: ASME Overpressure Analysis. ML14069A0052014-04-11011 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of NTTF Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14014A2682014-02-28028 February 2014 Staff Review and Evaluation of the Fifth 10-Year Interval Inservice Inspection Program Plan ML14064A1862014-02-25025 February 2014 Structural Integrity Associates, Inc., Evaluation File No. 1301525.301, Monticello Shroud Support Structure Flaw Evaluation Review and Support Plate Weld Inspection Recommendations L-MT-14-003, Enclosures 2 & 3 to L-MT-14-003, ANP-3286NP, Rev. 0, Responses to RAI from Srxb on MNGP Transition to Areva Fuel & Areva Atrium 10XM Fuel Transition - Response to Requests for Additional Information2014-01-31031 January 2014 Enclosures 2 & 3 to L-MT-14-003, ANP-3286NP, Rev. 0, Responses to RAI from Srxb on MNGP Transition to Areva Fuel & Areva Atrium 10XM Fuel Transition - Response to Requests for Additional Information ML13358A3732013-12-31031 December 2013 Enclosure 1, Reload 26 Cycle 27 Supplemental Reload Licensing Report, 000N0154-SRLR, Revision 5, Extended Power Uprate and Maximum Extended Load Line Limit Plus L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit2013-12-20020 December 2013 Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit ML13282A1422013-10-0404 October 2013 GE-MNGP-AEP-3304R1, Enclosure 2, GEH Response to Mella + RAI 2 L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages2013-10-0404 October 2013 GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages ML13248A3442013-08-29029 August 2013 WCAP-17548-NP, Revision 2 - Signal Processing Performed on Monticello MSL Strain Gauge and Rsd Instrumentation Data, Enclosure 10 ML13248A3452013-08-29029 August 2013 WCAP-17251-NP, Revision 2 - Monticello Replacement Steam Dryer Four-Line Acoustic Subscale Testing Report, Enclosure 11 ML13248A3462013-08-29029 August 2013 WCAP-17252-NP, Revision 4 - Acoustic Loads Definition for the Monticello Steam Dyer Replacement Project, Enclosure 12 ML13248A3482013-08-29029 August 2013 WCAP-17549-NP, Revision 2 - Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, Enclosure 13 L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 142013-08-29029 August 2013 WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14 ML13200A1962013-07-31031 July 2013 ANP-3211(NP), Rev. 1, Monticello EPU LOCA Break Spectrum Analysis for Atrium 10XM Fuel. ML13200A1922013-07-31031 July 2013 ANP-3092(NP), Rev. 0, Monticello Thermal-Hydraulic Design Report for Atrium 10XM Fuel Assemblies. 2024-06-10
[Table view] Category:Technical
MONTHYEARL-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-004, Technical Specification 5.6.4 Post Accident Monitoring Report2022-01-20020 January 2022 Technical Specification 5.6.4 Post Accident Monitoring Report ML21211A5962021-06-30030 June 2021 Attachments 9a, B, 10a, B, 11a, 12a and 13a and 13b, Including ANP-3933NP, Revision 0, Monticello ATWS-I Evaluation for Atrium 11 Fuel, Affidavit L-MT-21-016, Nuclear Material Transaction Report2021-03-25025 March 2021 Nuclear Material Transaction Report L-MT-20-002, 10 CFR 50.55a(z)(1) Request RR-015: Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange2020-01-31031 January 2020 10 CFR 50.55a(z)(1) Request RR-015: Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange ML19308A0562019-10-0808 October 2019 Enclosure 1 - Notification of Changes to the Emergency Response Data System (ERDS) L-MT-19-020, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ..2019-04-25025 April 2019 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions .. L-MT-17-055, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4, Path 42017-07-26026 July 2017 Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4, Path 4 L-MT-16-010, Enclosure 2 Areva Report ANP-3295NP, Rev. 3, Monticello Licensing Analysis for EFW (Epu/Mella+).2016-02-29029 February 2016 Enclosure 2 Areva Report ANP-3295NP, Rev. 3, Monticello Licensing Analysis for EFW (Epu/Mella+). ML15274A4752015-09-29029 September 2015 Enclosure 6, Areva Report ANP-3435NP, Revision 0 to Are VA Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW LAR (Non-Proprietary) L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits ML15274A4742015-09-29029 September 2015 Enclosure 4, Engineering Evaluation, EC 25987, Calculation Framework for the Extended Flow Window Stability (Efws) Setpoints ML16035A1842015-01-30030 January 2015 Document 51-9234641-001, Technical Report of the Demonstration of UT NDE Procedure 54-UT-114-000, Phased Array Ultrasonic Examination of Dry Storage Canister Lid Welds. ML16035A1862015-01-30030 January 2015 54-PQ-114-001, Technical Justification, Phased Array Ultrasonic Examination of Dry Storage Canister Lid Welds. Part 2 of 3 ML16035A1852015-01-30030 January 2015 54-PQ-114-001, Technical Justification, Phased Array Ultrasonic Examination of Dry Storage Canister Lid Welds. Part 1 of 3 L-MT-14-103, Areva Report ANP-3376NP, Rev. 0, Supplement to Xcel Energy License Amendment Request for Areva Extended Flow Window, Enclosure 2 to L-MT-14-1032014-12-31031 December 2014 Areva Report ANP-3376NP, Rev. 0, Supplement to Xcel Energy License Amendment Request for Areva Extended Flow Window, Enclosure 2 to L-MT-14-103 ML16005A1102014-09-25025 September 2014 Redacted 2014 Decommissioning Cost Analysis for the Prairie Island Nuclear Generating Plant L-MT-14-075, LTR-BWR-ENG-14-043-NP, Responses to the Us NRC Request for Additional Information Relative to the Monticello Replacement Steam Dryer Acoustic/Structural Analyses Set 8.2014-09-19019 September 2014 LTR-BWR-ENG-14-043-NP, Responses to the Us NRC Request for Additional Information Relative to the Monticello Replacement Steam Dryer Acoustic/Structural Analyses Set #8. ML14269A3252014-09-0505 September 2014 LTR-BWR-ENG-14-037-NP, Alternate Power Ascension Process. ML14269A3232014-09-0505 September 2014 LTR-BWR-ENG-14-034-NP, Investigation Into the Cause of Exceeding the Level 1 (L1) and Level 2 (L2) Limit Curves Generated Based on 2011 Monticello Main Steam Line Strain Gauge Data. ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records L-MT-14-041, ANP-3304NP, Rev. 0, Areva Response to NRC Follow-Up on Srxb RAI-6: ASME Overpressure Analysis.2014-05-0909 May 2014 ANP-3304NP, Rev. 0, Areva Response to NRC Follow-Up on Srxb RAI-6: ASME Overpressure Analysis. ML14069A0052014-04-11011 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of NTTF Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14064A1862014-02-25025 February 2014 Structural Integrity Associates, Inc., Evaluation File No. 1301525.301, Monticello Shroud Support Structure Flaw Evaluation Review and Support Plate Weld Inspection Recommendations L-MT-14-003, Enclosures 2 & 3 to L-MT-14-003, ANP-3286NP, Rev. 0, Responses to RAI from Srxb on MNGP Transition to Areva Fuel & Areva Atrium 10XM Fuel Transition - Response to Requests for Additional Information2014-01-31031 January 2014 Enclosures 2 & 3 to L-MT-14-003, ANP-3286NP, Rev. 0, Responses to RAI from Srxb on MNGP Transition to Areva Fuel & Areva Atrium 10XM Fuel Transition - Response to Requests for Additional Information ML13358A3732013-12-31031 December 2013 Enclosure 1, Reload 26 Cycle 27 Supplemental Reload Licensing Report, 000N0154-SRLR, Revision 5, Extended Power Uprate and Maximum Extended Load Line Limit Plus ML13200A1962013-07-31031 July 2013 ANP-3211(NP), Rev. 1, Monticello EPU LOCA Break Spectrum Analysis for Atrium 10XM Fuel. ML13200A1922013-07-31031 July 2013 ANP-3092(NP), Rev. 0, Monticello Thermal-Hydraulic Design Report for Atrium 10XM Fuel Assemblies. ML13200A1952013-06-30030 June 2013 ANP-3213(NP), Rev. 1, Monticello Fuel Transition Cycle 28 Reload Licensing Analysis (Epu/Mellla). ML13200A1902013-06-30030 June 2013 ANP-3224NP, Rev. 2, Applicability of Areva Np BWR Methods to Monticello. ML13191B1282013-06-26026 June 2013 NEDO-33820, Revision 0, Monticello Nuclear Generating Plant Upper Shelf Energy Evaluation for Plate C2220 Material for 54 EFPY, Enclosure 5 ML13200A2002013-05-31031 May 2013 ANP-3139(NP), Rev. 1, Nuclear Fuel Design Report Monticello Cycle 28 Atrium 10XM Fuel. ML13200A1992013-05-31031 May 2013 ANP-3221NP, Rev. 0, Fuel Rod Thermal-Mechanical Design for Monticello Atrium 10XM Fuel Assemblies, Cycle 28. ML13200A1972013-05-31031 May 2013 ANP-3212(NP), Rev. 0, Monticello EPU LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel. ML13200A1942013-05-31031 May 2013 ANP-3215(NP), Rev. 0, Monticello Fuel Transition Cycle 28 Fuel Cycle Design (Epu/Mellla). ML13092A3512013-03-29029 March 2013 Enclosure 12 to L-MT-13-029 - WCAP-17252-NP, Revision 3, Acoustic Loads Definition for the Monticello Steam Dryer Replacement Project. ML13092A3502013-03-29029 March 2013 Enclosure 11 to L-MT-13-029 - WCAP-17251-NP, Revision 1, Monticello Replacement Steam Dryer Four-Line Acoustic Subscale Testing Report. L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project.2013-03-29029 March 2013 Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project. ML13092A3492013-03-29029 March 2013 Enclosure 10 to L-MT-13-029 - WCAP-17548-NP, Revision 1, Signal Processing Performed on Monticello MSL Strain Gauge and Rsd Instrumentation Data. ML13092A3522013-03-29029 March 2013 Enclosure 13 to L-MT-13-029 - WCAP-17549-NP, Revision 1, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using Ace. ML13037A2012013-01-31031 January 2013 NEDO-33800, Rev. 0, Monticello Nuclear Generating Plant Automatic Depressurization System Bypass Timer Extended Power Uprate. ML13200A1892012-11-30030 November 2012 ANP-2637, Rev. 4, Boiling Water Reactor Licensing Methodology Compendium. ML13200A1912012-10-31031 October 2012 ANP-3119NP, Rev. 0, Mechanical Design Report for Monticello Atrium 10XM Fuel Assemblies. ML12300A2202012-10-31031 October 2012 Attachment 10: BWROG-TP-12-018, Revision 0, Task 3 - Pump Operation at Reduced Npsha Conditions (Cvds Pump) L-MT-12-082, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure2012-09-28028 September 2012 Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure ML12307A4342012-08-31031 August 2012 ANP-3113(NP), Rev. 0, Monticello Nuclear Plant Spent Fuel Storage Pool Criticality Safety Analysis for Atrium 10XM Fuel. ML12300A2192012-08-31031 August 2012 Attachment 9: BWROG-TP-12-011, Revision 0, Task 2 - Equation for Pump Speed Correction (Cvds Pump) ML12300A2212012-08-31031 August 2012 Attachment 11: BWROG-TP-12-012, Revision 0, Task 4 - Operation in the Maximum Erosion Rate Zone (Cvds Pump) 2024-06-10
[Table view] |
Text
L-MT-13-029 ENCLOSURE 11 WESTINGHOUSE WCAP-17251 -NP, (NONPROPRIETARY)
REVISION I MONTICELLO REPLACEMENT STEAM DRYER FOUR-LINE ACOUSTIC SUBSCALE TESTING REPORT 67 pages follow Westinghouse Non-Proprietary Class 3 WCAP-17251-NP M Revision 1 Monticello Replacement Steam Dryer Four-Line Acoustic Subscale Testing Report Westinghouse arch 2013 WESTINGHOUSE NON-PROPRIETARY CLASS 3 WCAP-17251-NP Revision 1 Monticello Replacement Steam Dryer Four-Line Acoustic Subscale Testing Report Inessa E. Berman*U.S. BWR Engineering March 2013 Reviewer:
AnnMarie Rowland*U.S. BWR Engineering Approved:
Daniel T. McLaughlin*, Resource Manager U.S. BWR Engineering
- Electronically approved records are authenticated in the electronic document management system.Westinghouse Electric Company LLC 1000 Westinghouse Drive Cranberry Township, PA 16066© 2013 Westinghouse Electric Company LLC All Rights Reserved ii RECORD OF REVISIONS Revision Description Completed 0 Original issue 06/15/10 1 The goal of the Rev. 0 report was to analyze the effect of the new dryer geometry on See EDMS the acoustic signature and to develop the scaling spectra based on the plant data taken at CLTP with the OEM dryer.The goal of the Rev. I report is to derive the scaling spectra to predict EPU acoustic signature based on the CLTP plant data with the RSD dryer. The updated document eliminates sections that compared the two different dryer geometries and provides an in-depth review of the RSD subscale data analysis.WCAP-1725 I-NP March 2013 Revision I iii TABLE OF CONTENTS RECORD OF REVISIONS
..........................................................................................................................
ii LIST OF TABLES .......................................................................................................................................
iv LIST OF FIGURE S ......................................................................................................................................
v LIST OF FIGURES (cont.) ..........................................................................................................................
vi EXECUTIVE SUM MARY .........................................................................................................................
vii ACRONYM S, ABBREVIATIONS, AND TRADEM ARKS .....................................................................
viii TRADEMARKS
........................................................................................................................................
viii 1 BACKGROUND AND PURPOSE ..............................................................................................
1-1 2 INPUTS TO TESTING .................................................................................................................
2-1 2.1 PLANT OPERATING CONDITIONS
............................................................................
2-1 2.2 PRE-TEST PREDICTIONS AND ASSUM PTIONS ......................................................
2-1 TESTING M ETHODOLOGY
......................................................................................................
3-1 3.1 SUBSCALE TEST SYSTEM .....................................................................................
3-1 3.2 PROCEDURAL OVERVIEW .........................................................................................
3-3 3.3 INSTRUMENTATION AND DATA ACQUISITION
...................................................
3-4 3.4 PRODUCTION TESTING ..............................................................................................
3-4 4 DATA PROCESSING M ETHODOLOGY
..............................................................................
4-1 4.1 DATA FILTERING AND SELECTION
......................................................................
4-1 4.2 COMPUTATION OF THE MACH NUM BER ...............................................................
4-1 4.3 FREQUENCY SCALING ...............................................................................................
4-2 4.4 COMPUTATION OF THE SIDE BRANCH NATURAL FREQUENCY
.......................
4-2 4.5 COMPUTATION OF THE POWER SPECTRAL DENSITIES
.....................................
4-3 4.6 COM PUTATION OF THE RM S PRESSURES
..............................................................
4-3 4.7 COM PUTATION OF THE SCALING SPECTRA ..........................................................
4-4 5 DESCRIPTION OF RESULTS ...............................................................................................
5-1 5.1 RA W DATA .....................................................................................................................
5-1 5.2 TEST LOG .......................................................................................................................
5-3 5.3 M ACH NUM BER COM PARISONS ..............................................................................
5-5 5.4 NATURAL FREQUENCY CALCULATIONS
...............................................................
5-6 5.5 ASSESSMENT OF THE M SL ACOUSTIC SIGNATURES
..........................................
5-6 5.6 RM S PRESSURE TRENDS ..........................................................................................
5-10 5.7 EFFECT OF THE DRYER GEOM ETRY .....................................................................
5-13 6 CLTP TO EPU SCALING SPECTRA ........................................................................................
6-18 7 CONCLUSIONS
..........................................................................................................................
7-1 8 RE FERE NCES .............................................................................................................................
8-1 APPENDIX A REPEATABILITY OF TEST DATA FOR OEM DRYER .........................................
A-I APPENDIX B REPEATABILITY OF TEST DATA FOR REPLACEMENT DRYER ......................
B-1 WCAP- 17251-NP March 2013 Revision 1 iv Table 2-1 Table 2-2 Table 3-1 Table 4-1 Table 5-1 Table 5-2 Table 5-3 Table 5-4 I II II II II II II II LIST OF TABLES]ab ..............................................................................
2 -1 rb .......................................................
2-1]a ..................................................................................
3 -4]ab ..................................................
4-3]ab ..............................................................
5-3]b ..............................................
5-4 ab ..................................
5-6]ab ................................................................................
5-12 WCAP-17251-NP March 2013 Revision 1 V LIST OF FIGURES Figure 3-1 ]a ..................................................
3-1 Figure 3-2 []a ...........................................................................................
3-2 Figure 3-3 M ockup of the M onticello OEM Dryer ...........................................................................
3-2 Figure 3-4 M ockup of the M onticello Replacem ent Steam Dryer ....................................................
3-3 Figure 5-1 [] b ................................
5-1 Figure 5-2]a,b ..............................................................................................
5-2 Figure 5-3 [b ..........................................................
5-5 Figure 5-4 [] ...............................................
... 5-7 Figure 5-5 []a ................................................
5-7 Figure 5-6 [] ..............................................
5-8 Figure 5-7 [] ................................................
5-8 Figure 5-8 []a ............................................
5-9 Figure 5-9 [] b ..............................................................
5-10 Figure 5-10 [b ..........................................................
5-11 Figure 5-11 [b ..............................................................
5-11 Figure 5-12 [b ............................................................
5-12 Figure 5-13 []a ................................................
5-14 Figure 5-14 ]a ....................................
5-15 Figure 5-15 []a ..................................................
5-16 Figure 5-16 []a ............................................
5-17 Figure A-I [.].b ......................................................................................
A-1 Figure A-2 [.b ...........................................................................................
A-2 Figure A-3 [ ]ab ...........................................................................................
A-3 Figure A-4 [,b ...........................................................................................
A-4 Figure A-5 ] b ......................................................................................
A-5 Figure A -6 [ ]b ...........................................................................................
A-6 Figure A-7 [ ]ab ...........................................................................................
A-7 Figure A -8 [ ]a~b ...........................................................................................
A-8 Figure A-9 [,b ...........................................................................................
A-9 WCAP- 17251 -NP March 2013 Revision I vi Figure B- I Figure B-2 Figure B-3 Figure B-4 Figure B-5 Figure B-6 Figure B-7 Figure B-8 Figure B-9 Figure B- 10 Figure B-I l Figure B-12 Figure B- 13 Figure B-14 Figure B- 15 Figure B-16 Figure B- 17 Figure B- 18 LIST OF FIGURES (cont.)]a,b ..........................................................................................
B-1 ab ...........................................................................................
B-2 ab ...........................................................................................
B-3 ab ...........................................................................................
B-4]a,b .........................................................................................
B-5]ab ...........................................................................................
B-6]b ...........................................................................................
B-7]ab .........................................................................................
B-8 ,b ...........................................................................................
B-9]b .........................................................................................
B-10]ab ............................
b...........................................................
B-1I.b .........................................................................................
B-12]...........................................................................................
B-13]ab .........................................................................................
B-14]b .........................................................................................
B-15]ab .........................................................................................
B-16]ab .........................................................................................
B-17.,. b .....................................................................................
B-18 WCAP-17251-NP March 2013 Revision I vii EXECUTIVE
SUMMARY
]a The main purpose of the test program was to[]a~b The second purpose of this testing program was]a The third purpose of this testing programn was[]a[]a~b II II]a~b I]a,b WCAP-17251-NP March 2013 Revision I viii ACRONYMS, ABBREVIATIONS, AND TRADEMARKS Acronyms and Abbreviations A/D analog/digital CLTP current licensed thermal power DAS data acquisition system DS downstream (used only in figures and tables)EPU extended power uprate MSL main steam line NRC Nuclear Regulatory Commission OEM original equipment manufacturer PSD power spectral density PVC polyvinyl chloride RMS root mean square RPV reactor pressure vessel RSD replacement steam dryer SRV safety relief valve US upstream (used only in figures and tables)CDI Continuum Dynamics, Inc TRADEMARKS DaqBook/2020, DASYLab, eMachines, MATLAB, Microsoft, and Windows are trademarks or registered trademarks of their respective owners. Other names may be trademarks of their respective owners.WCAP- 17251-NP March 2013 Revision I 1 BACKGROUND AND PURPOSE Monticello contracted Westinghouse in support of licensing for EPU.]a,c In order to uprate the plant power, the United States Nuclear Regulatory Commission (NRC) requires that the structural integrity of the steam dryer be evaluated with regard to possible acoustic pressure loads.[This requirement is detailed in Reference I. In order to evaluate the structural integrity of the steam dryer,]a In summer 2009, a four-line subscale model test was performed through a range of Mach numbers was to[encompassing all planned operating conditions.
The main purpose of the four-line subscale model testing]a The subscale test data were evaluated to establish whether or not the plant is operating in an acoustically benign region through the range of planned operating conditions.
]b,d]b,d The results presented in this report are based on testing performed in accordance with the test plan (Reference 2).WCAP- 17251-NP March 2013 Revision I 2-1 2 INPUTS TO TESTING 2.1 PLANT OPERATING CONDITIONS T -,b STable 2-1 ],,b r------1 K a,b 2.2 PRE-TEST PREDICTIONS AND ASSUMPTIONS
[LI a,b[WCAP- 17251-NP March 2013 Revision I 3-1 3 TESTING METHODOLOGY
3.1 SUBSCALE
TEST SYSTEM]a The geometry of the subscale system is explicitly described in Reference 2.]a Figure 3-1 [,a WCAP- 17251-NP March 2013 Revision 1 3-2 a Figure 3-2 [a Figure 3-3 Mockup of the Monticello OEM Dryer a WCAP-17251-NP March 2013 Revision 1 3-3 a Figure 3-4 Mockup of the Monticello Replacement Steam Dryer 3.2 PROCEDURAL OVERVIEW The testing procedure is documented in Reference 2.[Ia I]a I]a WCAP-1 7251-NP March 2013 Revision I 3-4[]3.3 INSTRUMENTATION AND DATA ACQUISITION The instrumentation used in the test is summarized in Table 3-1.11Table 3-1 11a LI a,b II a 3.4 PRODUCTION TESTING[]a WCAP- 17251-NP March 2013 Revision 1 4-1 4 4.1 DATA PROCESSING METHODOLOGY DATA FILTERING AND SELECTION I]a a 4.2 COMPUTATION OF THE MACH NUMBER II]a The computation of the Mach number was performed with Equation (4-1).[a where, (4-1)a The acoustic speed in air is a function of temperature.
The computation of the acoustic speed is shown in Equation (4-2).WCAP-1725 1-NP March 2013 Revision 1 4-2 Cir= y*R* T (4-2)where, Cair R T is the acoustic speed in air.is the ratio of specific heats (1.4 for air).is the universal gas constant ( 1718 2 for air).s
- Rankine is the absolute temperature in Rankine.4.3 FREQUENCY SCALING[I a~c L I a (4-3)a,b where, I 4.4 The []a,b COMPUTATION OF THE SIDE BRANCH NATURAL FREQUENCY c Iac natural frequency was derived I I a~c WCAP- 17251-NP March 2013 Revision I 4-3 Table 4-1I iab]a~b 4.5 COMPUTATION OF THE POWER SPECTRAL DENSITIES The PSDs were derived using Welch's modified periodogram method. Averaging was used, and the number of points for each ensemble was selected to yield a frequency resolution of I Hz (full scale).A Harming window was used to reduce spectral leakage, and 50 percent overlap was used to increase the number of averages.4.6 COMPUTATION OF THE RMS PRESSURES The computation of the RMS pressures is shown in Equation (4-4).[ ]a (4-4)where,[a[]WCAP- 17251-NP March 2013 Revision 1 4-4 4.7 COMPUTATION OF THE SCALING SPECTRA I]a This is shown in Equation (4-5).L (4-5)where, a II]a WCAP-17251-NP March 2013 Revision I 4-5 a (4-6)where, a[la WCAP-1725 1-NP March 2013 Revision 1 5-1 5 5.1[DESCRIPTION OF RESULTS RAW DATA]ab a,b Figure 5-1 1 ji2,b WCAP- 17251-NP March 2013 Revision I 5-2 II]a,b a,b Figure 5-2 1 a,b WCAP- 17251-NP March 2013 Revision I 5-3 5.2 TEST LOG[ ]a8b 1 Table 5-1 I af,b I a,b WCAP- 17251-NP March 2013 Revision I 5-4[]a,b Table 5-2 ]b WCAP- 17251-NP March 2013 Revision I 5-5 5.3 MACH NUMBER COMPARISONS I]a b Figure 5-3 1 i a~b WCAP-1725 I-NP March 2013 Revision 1
5.4 NATURAL
FREQUENCY CALCULATIONS 5-6]a,b 11 Table 5-3 I a2,b i-a,b 5.5 ASSESSMENT OF THE MSL ACOUSTIC SIGNATURES
[] a I]iab I]a[]a I] a WCAP- 17251-NP March 2013 Revision 1 5-7 I b Figure 5-4 Figure 5-5 []a 7b ia WCAP-17251-NP March 2013 Revision 1 5-8 b Figure 5-6 1 a b'N Figure 5-7 [la WCAP- 17251-NP March 2013 Revision 1 5-9]a,b Figure 5-8 1 ]WCAP-17251-NP March 2013 Revision 1 5-10 5.6 RMS PRESSURE TRENDS[]ab a,b Figure 5-9 1 3a,b WCAP- 17251-NP March 2013 Revision I 5-11 a,b Figure 5-10 [Figure 5-11 la,b a,b ja,b WCAP-1725 1-NP March 2013 Revision I 5-12 a,b Figure 5-12 a,b ab Table 5-4 ] ba b 1a,b WCAP-1725 1-NP March 2013 Revision 1 5-13 5.7 EFFECT OF THE DRYER GEOMETRY[]a~b WCAP- 17251-NP March 2013 Revision I 5-14 a,b Figure 5-13 1 WCAP- 17251-NP March 2013 Revision I 5-15 a,b Figure 5-14 ]a WCAP-17251-NP March 2013 Revision 1 5-16 a,b Figure 5-15 1 1a WCAP-17251-NP March 2013 Revision I 5-17 a,b Figure 5-16 1]a WCAP-17251-NP March 2013 Revision I 6-18 6 CLTP TO EPU SCALING SPECTRA I]a WCAP- 17251-NP March 2013 Revision 1 7-1 7 CONCLUSIONS I rab WCAP- 1725 1-NP March 2013 Revision 1 8-1 8 REFERENCES I. Regulatory Guide 1.20, Rev. 3, "Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational and Initial Startup Testing," U.S. Nuclear Regulatory Commission, March 2007.2.as~3. [I a~c 4. 1]a~c 5. ASME, "ASME Steam Tables," Fifth Edition, 1983.WCAP- 17251-NP March 2013 Revision I A-1 APPENDIX A REPEATABILITY OF TEST DATA FOR OEM DRYER a,b Figure A-I I Ja,b WCAP- 17251 -NP March 2013 Revision I A-2 a,b Figure A-2 [ 1 a,b WCAP-1725 1-NP March 2013 Revision I A-3 a,b Figure A-3 [Ja,b WCAP- 17251-NP March 2013 Revision I A-4 a,b Figure A-4 [ ]a,b WCAP-17251-NP March 2013 Revision 1 A-5 a,b Figure A-5 2 ]a,b WCAP- 17251-NP March 2013 Revision I A-6 a,b Figure A-6 2 ]a,b WCAP- 17251-NP March 2013 Revision I A-7 a,b Figure A-7 [ ]a,b WCAP- 17251-NP March 2013 Revision 1 A-8 a,b Figure A-8 [ ]a,b WCAP- 17251-NP March 2013 Revision I A-9 a,b Figure A-9 I Ja,b WCAP-17251-NP March 2013 Revision 1 B-I APPENDIX B REPEATABILITY OF TEST DATA FOR REPLACEMENT DRYER a,b Figure B-I [1 a,b WCAP-17251-NP March 2013 Revision I B-2 a,b Figure B-2 [ 1 a,b WCAP-17251-NP March 2013 Revision 1 B-3 a,b Figure B-3 [ ]a,b WCAP- 17251-NP March 2013 Revision 1 B-4 a,b Figure B-4 I Ia,b WCAP- 17251-NP March 2013 Revision I B-5 a,b Figure B-5 [ ]a,b WCAP- 17251-NP March 2013 Revision I B-6 a,b Figure B-6 I Ja,b WCAP-17251-NP March 2013 Revision I B-7 a,b Figure B-7 [ ]a,b WCAP-17251-NP March 2013 Revision I B-8 a,b Figure B-8 [ 1 a,b WCAP-1725 1-NP March 2013 Revision 1 B-9 a,b Figure B-9 [ ]a,b WCAP-17251-NP March 2013 Revision 1 B-10 a,b Figure B-1O I a,b WCAP- 17251-NP March 2013 Revision I B-lI a,b Figure B-I1I [a,b WCAP-17251-NP March 2013 Revision I B- 12 a,b Figure B-12 [ 1 a,b WCAP- 17251-NP March 2013 Revision I B- 13 a,b Figure B-13 I ]a,b WCAP- 17251-NP March 2013 Revision I B- 14 a,b Figure B-14 I a8,b WCAP-17251-NP March 2013 Revision I B- 15 a,b Figure B-15 [ ]a,b WCAP- 17251-NP March 2013 Revision I B-16 a,b Figure B-16 I ]a,b WCAP- 1725 1-NP March 2013 Revision I B-17 a,b Figure B-17 [ ]a,b WCAP-17251-NP March 2013 Revision 1 B-18 a,b Figure B-18 I a,b WCAP- 17251-NP March 2013 Revision 1