IR 05000354/2010001

From kanterella
(Redirected from ML110620286)
Jump to navigation Jump to search
Annual Assessment Letter for Hope Creek Generating Station, EOC-11 (05000354-10-001)
ML110620286
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/04/2011
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT AL
References
IR-10-001
Download: ML110620286 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

SUBJECT:

ANNUALASSESSMENT LETTER FOR HOPE CREEKGENERATING STATION (05000354 t2o1 0001)

Dear Mr. Joyce:

On February 10, 2011, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Hope Creek Generating Station (Hope Creek), The NRC reviewed the most recent quarterly performance indicators (Pls), in addition to inspection results and enforcement actions from January 1 , 2010, through December 31, 2010. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

",WM Please contact me at 610-337-5069 with any questions you have regarding this letter.

Arthur L. Burritt. Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 cc w/encl: Distribution via ListServ Hope Creek Generating Station Inspection / Activity Plan In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://wwr,v.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 cc w/encl: Distribution via ListServ Hope Creek Generating Station lnspection / Activity Plan Distribution Wencl: J. Trapp, Rl, OEDO W. Dean, RA DRS Branch Chiefs (6)

D. Lew, DRA N. McNamara, Rl, SLO D. Roberts, DRP D. Tift, RI, SLO J. Clifford, DRP D. Screnci, Rl, PAO P. Wilson, DRS N. Sheehan, Rl, PAO A. Burrift, DRP R. Barkley, Rl, ORA L. Cline, DRP ROPassessment Resource A. Turilin, DRP RidsNrrPMHopeCreek Resource C. Douglas, DRP RidsDodLpl'1 -2 Resource B. Welling, DRP, SRI RidsNrrDirslpab A. Patel, DRP, RI ROPreportsResource K. McKenzie, DRP, OA SUNSI REVIEW COMPLETE: LC (Reviewer's initials) ML110620286 DOC NAME: S:\ROP-11 EOC REVIE\ ABRANCH 3\LETTERS\HOPE CREEK - ANNUAL ASSESSMENT LETTER REVO.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "G'= Copy w/ aftachmenVenclosure "E' = Copy w/athcttment/enclosure "il"= No mPY

)FFICE nmt IYDRP tI/DRP

{AME .Cline/ LC \BurritU ALB

)ATE t2t28t11 )3t01 t11 OFFICIAL RECORD COPY

Page 1 ot 2 Hope Creek 0310112011 08:37:56 Inspection / Activity Plan Repo( 22 0110112011 - 0613012012 Unit No. of Staff Number on Site 71152 - PI&R 011101201'l 01t14t2011 tP 711528 ldentification and Resolution of Problems 41t24t2011 01t28t2011 tP 711525 ldentification and Resolution of Problems 71124 .HP 02t28t201',! o3104t2011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 02t28t2011 o3t04t2011 lP 71124.02 Occupational ALARA Planning and Controls 0212812011 03t04t2011 tP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation EP PROGR . EP PROGRAM INSPECTION 03t14t2011 o3118t2011 tP 71't't402 Alert and Notification System Testing 0311412011 03t18t2011 tP 711't403 Emergency Preparedness Organization Staffing and Augmentation System 03t14t2011 o3t18t2011 tP 7111404 Emergency Action Level and Emergency Plan Changes 03t14t2011 o3118t2011 lP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies o3t't4t2011 03t18t2011 tP 7'1 151-EP01 Drill/Exercise Performance 03t14t2011 o3118t2011 tP 71151-EPO2 ERO Drill Participation o3t14t2011 o3t18t2011 lP 7'1'151-EP03 Alert & Notification System 7'111117 . PERMANENT PLANT MODIFICATIONS o4t04t2011 o410812011 lP 711111Tf Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications o4t18t2011 0412212011 lP 71111177 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modificatlons 71'I11O7T - TRIENNIAL HEAT SINK o5to2t2011 05/06/2011 lP 7111107T Heat Sink Performance 71124 - HP ost16t2011 0512012011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls o5116t2011 0512012011 lP 71124.04 Occupational Dose Assessment 05116t2011 05t20t2011 lP 71124.05 Radiation Monitoring Instrumentation 71124 - REMP 07125t2011 07t29t2011 lP 71124.07 Radiological Environmental Monitoring Program 71124 - HP 09t't9t2011 o9t23t2011 lP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09119t2011 o9t23t2011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 09t19t2011 09t23t2011 lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 09119t2011 0912312011 lP 71124.04 Occupational Dose Assessment 2I27EXAM . HOPE CREEK INITIAL EXAM 02106t2012 o211012012 UO1B45 FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 03t05t2012 03to9t2012 U01845 FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM is report does not include INPO and This report shows only on-site and announced inspection procedures.

Page 2 of 2 Hope Creek 0310112011 08:37:56 Inspection / Activity Plan Report 22 0110112011 - 0613012012 Unit No. of Staff Number on Site 71124 71124 - RADWASTE 12112120'11 1211612011 lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.06 . PUB RAD SAFEW. RETS O1l1gl2012 0111312012 lP 71124.05 Radiation Monitoring Instrumentation 01109120'12 0111312012 lP 71124.06 Radioactive Gaseous and Liouid Effluent Treatment 7111108G .INSERVIGE INSPECTION 0412312012 0412712012 lP 71 1 108G 1 Inservice Inspection Activities - BWR 71124 -OCC RAD SAFEW 0412312012 0412712012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 0412312012 0412712012 lP 71124.02 Occupational ALARA Planning and Controls EP EXER . EP EXERCISE EVALUATION 0512112012 0512512012 lP 7111401 Exercise Evaluation 0512112012 0512512012 lP 7111404 Emergency Action Level and Emergency Plan Changes

[his report does not include INPO and OUTAGE activities. h lThis report shows only on-site and announced inspection procedures. ii I

,ref.-:=e-;