Letter Sequence RAI |
---|
|
|
MONTHYEARML1012503142010-05-10010 May 2010 04/06/2010 - Meeting Summary-CGS License Renewal Overview and Environmental Scoping Meetings Project stage: Meeting ML1012505192010-05-10010 May 2010 04/06/2010 - Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058 and ME3121) Project stage: Meeting ML1024403422010-08-19019 August 2010 Columbia Generating Station - Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1022203732010-08-26026 August 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application for Fatigue Monitoring Program, TLAA Exemptions, Metal Fatigue TLAA, Cumulative Fatigue Damage, CASS, and Structural Project stage: RAI ML1024505712010-09-14014 September 2010 Summary of Telephone Conference Call Held on August 10, 2010, Between the U.S. NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application Project stage: RAI ML1024506212010-09-14014 September 2010 Summary of Telephone Conference Call Held on August 26, 2010, Between the U.S. NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application Project stage: RAI ML1024507272010-09-16016 September 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application Project stage: RAI ML1024507562010-09-16016 September 2010 8/12/10, Summary of Telephone Conference Call Held on Between NRC and Energy Northwest, Concerning the RAI Pertaining to the Columbia Generating Station, LRA Project stage: RAI ML1025306452010-09-21021 September 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application Project stage: RAI ML1027004332010-10-0404 October 2010 Summary of Telephone Conference Call Held on September 13, 2010, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License R Project stage: RAI ML1028004262010-10-14014 October 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application (TAC No. 3058) Project stage: RAI ML1028507352010-10-20020 October 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application (TAC ME3058) Concerning Structures Project stage: RAI ML1027303552010-10-20020 October 2010 Letter Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application, Concerning Structures (Tac No. ME3058) Project stage: RAI ML1027902232010-10-25025 October 2010 10/05/2010 Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Draft Rao Pertaining to the Columbia Generating Station, License Renewal Application Project stage: Draft Other ML1028702452010-10-25025 October 2010 October 13, 2010, Summary of Teleconference Held Between the U.S. NRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station License Renewal Application Project stage: Draft RAI ML1028701932010-10-25025 October 2010 9/22/10 Summary of Telephone Conference Call Held Between the USNRC and Energy Northwest Concerning the D-RAI Pertaining to the Columbia Generating Station, License Renewal Application Project stage: RAI ML1028501032010-10-27027 October 2010 Summary of Telephone Conference Calls Held on 9/20/10, Between Us NRC and Energy Northwest, Concerning the Response to RAI Pertaining to the Columbia Generating Station, LRA Project stage: RAI ML1029305932010-11-0101 November 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application Project stage: RAI ML1030100802010-11-0505 November 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application Project stage: RAI GO2-10-164, Response to Request for Additional Information License Renewal Application2010-11-11011 November 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1030004792010-11-19019 November 2010 Summary of Telephone Conference Call Between the USNRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, LRA Project stage: Draft RAI ML1030905662010-11-19019 November 2010 Summary of Teleconference Held on September 22, 2010, Between the U.S. NRC and Energy Northwest, Concerning the Responses to the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application Project stage: RAI ML1031305482010-11-19019 November 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application Project stage: RAI ML1032003382010-11-19019 November 2010 Summary of Teleconference Held on November 8, 2010, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Responses to Request for Additional Information Pertaining to the Columbia Generating Station, LRA Project stage: RAI ML1035400222010-12-20020 December 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application Project stage: RAI ML1035506032010-12-27027 December 2010 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application (TAC No. Me3058) Project stage: RAI ML1100500182011-01-0606 January 2011 Summary of Telephone Conference Call Held on January 3, 2011, Between the NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application (TAC Number ME3 Project stage: RAI ML1034305262011-01-10010 January 2011 Schedule Revision for the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058, ME3121) Project stage: Approval ML1036307392011-01-11011 January 2011 Safety Project Manager Change for the License Renewal of Columbia Generating Station (Tac No. ME3058) Project stage: Other ML1100604382011-01-13013 January 2011 Summary of Telephone Conference Call Held on 1/5/11, Between NRC and Energy Northwesy, Concerning the RAI Pertaining to the Columbia Generating Station License Renewal Application (Tac No. ME3058) Project stage: RAI ML1101405882011-01-31031 January 2011 01/12/11 Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to RAI Pertaining to the Columbia Generating Station. License Renewal Application Project stage: RAI ML1102402022011-02-0303 February 2011 01/20/2011 Summary of Telephone Conference with NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application Project stage: RAI ML1102404262011-02-0303 February 2011 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application for Metal Fatigue (Tac No. ME3058) Project stage: RAI ML1102007102011-02-0303 February 2011 01/11/11 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Applicat Project stage: RAI ML1102603802011-02-16016 February 2011 January 24, 2011, Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station Project stage: RAI ML1104702152011-02-23023 February 2011 Summary of Telephone Conference Call Held on February 14, 2011, Btw the USNRC and Energy Northwest, Concerning the Responses to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA Project stage: RAI ML1105401262011-02-28028 February 2011 2/17/11 Summary of Telephone Conference Call Held Between the USNRC and Energy Northwest, Concerning the Responses to the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application Project stage: RAI ML1106107122011-03-0909 March 2011 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application for Buried Piping and Tanks Inspection Project stage: RAI ML1106909972011-03-15015 March 2011 Summary of Telephone Conference Call Held on 3/8/11 Btw the USNRC and Energy Northwest Concerning the Responses to the RAI Pertaining to the Columbia Generating Station, License Renewal Application (TAC Number ME3058) Project stage: RAI ML1106806702011-03-18018 March 2011 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application for Drywell Floor Peripheral Seal Assembly (TAC Number ME3058) Project stage: RAI ML1106303602011-03-23023 March 2011 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application for Time-Limited Aging Analyses of Reactor Vessel Neutron Embrittlement (TAC Number ME3058) Project stage: RAI ML1108714952011-04-0505 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between NRC and Energy Northwest, Concerning the RAI Pertaining to the Columbia Generating Station, LRA (Tac No. ME3058) Project stage: RAI ML11138A3232011-05-24024 May 2011 RAI for the Review of the Columbia Generating Station, License Renewal Application for Operating Experience Project stage: RAI ML11140A1612011-06-0202 June 2011 RAI for the Review of the Columbia Generating Station, License Renewal Application Regarding Core Plate Assembly Project stage: RAI ML11137A0442011-06-0808 June 2011 05/06/2011-Summary of Telephone Conference Call Between the NRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application Project stage: Draft RAI ML11165A2432011-06-22022 June 2011 Summary of Telephone Conference Call Held on June 1, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, LRA Project stage: RAI ML11188A2382011-07-12012 July 2011 07/06/2011-Summary of Telephone Conference Call Between NRC and Energy Northwest, Concerning the Request for Additional Information Response Pertaining to the Columbia Generating Station, License Renewal Application Project stage: RAI ML11195A2402011-07-19019 July 2011 Request for Additional Information for the Review of the Columbia Generating Station, License Renewal Application Regarding High Voltage Porcelain Insulators Project stage: RAI ML11208B0492011-08-0202 August 2011 07/19/11 Summary of Telephone Conference Call Held Between the NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application (TAC No. Me3058) Project stage: RAI ML11216A2532011-08-11011 August 2011 August 3, 2011, Summary of Telephone Conference Call Held Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA Project stage: RAI 2011-01-13
[Table View] |
|
---|
Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22145A4462022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information ML15254A2572015-09-16016 September 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Reevaluations ML15215A0432015-08-18018 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations ML14262A3412014-09-24024 September 2014 Request for Additional Information, Round 2, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High ML14192B0312014-08-13013 August 2014 Redacted, Request for Additional Information, Nrr/Dss/Scvb, Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14206A0112014-07-31031 July 2014 Request for Additional Information, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High 2024-01-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 19, 2010 Mr. S.K. Gambhir Vice President Technical Services Columbia Generating Station Energy Northwest MD PE04 P.O. Box 968 Richland, WA 99352-0968
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NO. ME3058)
Dear Mr. Gambhir:
By letter dated January 19, 2010, Energy Northwest submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew operating license NPF-21 for Columbia Generating Station, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Abbas Mostala and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4029 or bye-mail at Evelyn.Gettys@nrc.gov.
Sincerely, Evelyn H. Gettys, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
As stated cc w/encl: Distribution via Listserv
COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION Follow~up RAJ B.2.34~1
Background:
In response to the RAI B.2.34-1, the applicant stated:
- a. "Additionally, the sand pocket drains are checked monthly (28 day frequency) for presence of water."
- b. "Based on plant specific corrosion rates for carbon steel exposed to raw water (Le., SW piping) the maximum average corrosion rate is 1.5 mils per year (mpy). Therefore, a corrosion of 1.5 mpy will be assumed for containment steel plate in the sand pocket region."
- c. "The 1.9% margin when applied to the thickness of the plate in the sand bed region will result in a corrosion allowance of 27.5 mils."
- d. The construction of the containment at Columbia utilized a polyurethane foam material in the annulus between the biological shield wall and primary containment vessel.
Energy Northwest agrees this method of construction would inhibit, if not prevent, the free flow of moisture to the sand pocket regions and drain lines from the refueling bellows area."
Issue:
It is not clear to staff:
- a. How the sand pocket drains are inspected for presence of water.
- b. How the plant specific corrosion rate of 1.5 mpy was established.
- c. How the corrosion rate in the sand bed region can be linearly proportional to the drywell thickness.
In addition, presence of moisture in the polyurethane material can lead to corrosion and localized pitting of the steel containment. The localized corrosion rate due to pitting can be higher than 1.5 mpy over the long term.
Request:
- a. Provide details on how the sand pocket drains are inspected. In addition, does the plant procedures require vacuum of all of the eight sand pockets during inspection.
- b. Provide the basis for the plant specific corrosion rate of 1.5 mils per year (mpy).
- c. Justification for assuming that corrosion rate in sand bed region is linearly proportional to the drywell thickness.
- d. Plans (if any) for UT examination of a representative portion of the steel containment and sand pocket region to detect degradation of steel and confirm that corrosion rate is less than 1.5 mils per year (mpy).
ENCLOSURE
- 2 Follow-up RAI B.2.34-3
Background:
In response to RAI 8.2.34-3, the applicant stated that the VT-3 examinations are performed in accordance with the plant procedures by certified VT -3 examiners. The procedures and certification are in accordance with ASME Section XI.
Issue:
10CFR 50.55a which is referenced in GALL XI.S1 states that VT-1 and VT-3 examinations must be conducted in accordance with IWA-2200. Personnel conducting examinations in accordance with the VT-1 or VT-3 examination method shall be qualified in accordance with IWA-2300. The "owner-defined" personnel qualification provisions in IWE-2330(a) for personnel that conduct VT-1 and VT-3 examinations are not approved for use. It is not clear to the staff whether the persons performing the VT -3 examination at the Columbia Generating Station are qualified in accordance with the IWA-2300 requirements.
Request:
Provide the qualification requirements for the VT-3 examiners at the Columbia Generating Station. Specifically, the staff needs to know if the VT-3 examiners are qualified in accordance with ASME IWA-2300.
Follow-up RAI B.2.35-2
Background:
In its response to RAI 8.2.35-2, dated September 3,2010, the applicant stated that no inspection frequency is specified when applying supplemental examinations per IWF-3200. The applicant also stated that when visual examinations detect conditions in the structural steel supports of the service water pond spray ring header requiring evaluation, these examinations may be supplemented with other examination methods to determine the characteristic of the flaw. Supplement examinations, if needed, are performed by either or both the surface and volumetric methods. The applicant further stated that the structural steel supports of the spray ring header are protected from corrosion by coating the structure and a sacrificial anode protective system. The effectiveness of the corrosion protection system is assessed periodically by performing above-water and below-water visual inspections of the structural supports.
Additionally, the operation of the anode protective system is verified periodically. The criterion to initiate the corrective action process, in accordance with plant procedures, is, "Identify any issue or condition that doesn't look as if it is right using the AR-CR process."
- 3 Issue:
The staff reviewed the applicant's response to RAI B.2.35-2 and was concerned that the applicant did not provide the frequency of the periodic inspection of the service water pond spray ring header supports and the anode protective systems. In addition, the criterion used to initiate the corrective action process was very subjective.
Request:
The applicant is requested to provide the inspection frequency for the above and below water inspection of service water pond spray header supports, and anode protection system. In addition, the applicant to identify quantitative criteria used to initiate the corrective action process. The staff needs this information to confirm that the effects of aging on the intended function of the spray pond header will be adequately managed for the period extended operations in accordance with 10 CFR 54.21 (c)(iii).
Follow-up RAls B.2.50-1, B2.50-2, B.2.50-3
Background:
In response to RAls B.2.50-1, B2.50-2, B.2.50-3, the applicant stated that the required enhancements to AMPs will be implemented prior to the period of extended operation. In addition, it is not clear from the response which of the recommended enhancements will be adopted for the AMPs.
Issue:
The staff is concerned that the required enhancements to the AMPs will not be implemented until the period of extended operation which begins December 2023. Early implementation of the enhancements is needed to establish a baseline for monitoring and trending the aging of the structures during the period of extended operation. In addition, the applicant has not clearly identified the recommended enhancements that will be incorporated in the AMPs.
Request:
- a. Clearly identify the enhancements that will be incorporated into the AMPs.
- b. Provide a firm schedule for implementation of the required enhancements, in order to establish a baseline prior to the period of extended operation. If no plans exist to implement the enhancements prior to the period of extended operation explain why early implementation is unnecessary and how an appropriate baseline will be established prior to entering the period of extended operation.
-4 Follow-up RAI B.2.50-5
Background:
In response to RAI B.2.50-5, the applicant stated that tell tale drains are checked once per shift, during 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift, in accordance with plant procedures. The acceptance criterion is no flow through the drains. Should the operator find flow in the tell tale drains, the event would be entered into CAP. As of August 2010, no instances of leakage through tell tale drains have been entered into CAP.
Issue:
The staff is concerned that tell tale drains may be blocked and prevent any leakage to be collected or observed at the drain valves.
Request:
Provide additional information that will demonstrate that tell tale drains are not blocked. This could be boroscope inspection of the drains.
'.. ML103130548 OFFICE LA:DLR PM:RPB1 :DLR BC: RPB1:DLR PM:RPB1 :DLR NAME SFigueroa EGettys BPham EGettys DATE 11/10/10 11/15/10 11/18/10 11/19/10
Letter to S.K. Gambhir from E. Gettys dated November 19, 2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NO. ME3058) CONCERNING STRUCTURES DISTRIBUTION:
HARDCOPY:
DLRRF E-MAIL:
PUBLIC [or NON-PUBLIC, if appropriate]
RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource EGettys DDoyle FLyon WWalker, RIV RCohen, RIV LSubin,OGC