Summary of Telephone Conference Call Held on March 23, 2011, Between NRC and Energy Northwest, Concerning the RAI Pertaining to the Columbia Generating Station, LRA (Tac No. ME3058)
ML110871495
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/05/2011
From: Cunanan A
License Renewal Projects Branch 1
To:
Energy Northwest
cunanan, A NRR/DLR 415-3897
References
TAC ME3058
Download: ML110871495 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 5, 2011 LICENSEE:

Energy Northwest FACILITY:

Columbia Generating Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 23, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NO. ME3058)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest (the applicant), held a telephone conference call on March 23, 2011, to discuss and clarify the NRCs request for additional information (RAI) concerning the Columbia Generating Station, license renewal application. provides a listing of the participants and Enclosure 2 contains a listing of the RAls discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

Arthur D. Cunanan, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosures:

As stated cc w/encls: Listserv

TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION PARTICIPANTS:

Arthur Cunanan James Medoff Chris Sydnor Abbas Mostala Marsha Eades Douglas Ramey Steven Richter John Sisk Ron Finnin David Lee LIST OF PARTICIPANTS MARCH 23,2011 AFFILIATIONS:

U.S. Nuclear Regulatory Commission (NRC)

NRC NRC Energy Northwest (EN)

EN EN EN EN AREVA AREVA ENCLOSURE 1

TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATIONS MARCH 23, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest, held telephone conference calls on March 23, 2011, to discuss the following request for additional information (RAI) concerning the Columbia Generating Station license renewal application (LRA).

D-RAI4.2-5 Discussion: The staff discussed providing justification for the use of the BWRVIP-74-A shell weld equivalent margins analysis acceptance criteria to determine the acceptability of the N6 RHR/LPCI nozzle welds.

The applicant understands the RAI and will provide a response.

The staff has issued the RAI.

D-RAI4.2-6 Discussion: The staff discussed its concern that the N12 nozzles' upper-shelf energy (USE) may drop below 50 ft-Ibs prior to the period of extended operation and that the applicant would need to calculate the estimated date the N12 nozzles' USE would drop below 50 ft-Ibs.

The applicant understands the RAI and will provide a response.

The staff has issued the RAI.

D-RAI3.1.2.3.1-3 Discussion: Due to the applicant identifying two indications in the reactor vessel shell, as stated in LRA Section 4.7.1, the staff discussed the need for the applicant to credit both Inservice Inspection Program and time-limited aging analysis in the aging management review (AMR) line items for the BG and BM welds. The staff also discussed connecting the AMR line items to LRA Section 4.7.1 and the applicant's Commitment 69, which commits the applicant to:

liRe-evaluate the subject flaws for the period of extended operation (54 EFPY), in accordance with the requirements of the ASME Code,Section XI, IWB-3600 based on the results of 2015 inservice inspection."

The applicant understands the question and will provide a supplemental response to the question.

ENCLOSURE 2

April 5, 2011 LICENSEE:

Energy Northwest FACILITY:

Columbia Generating Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 23, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NO. ME3058)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest (the applicant), held a telephone conference call on March 23, 2011, to discuss and clarify the NRC's request for additional information (RAI) concerning the Columbia Generating Station, license renewal application. provides a listing of the participants and Enclosure 2 contains a listing of the RAls discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

IRA!

Arthur D. Cunanan, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosures:

As stated cc w/encls: Listserv DISTRIBUTION:

See next page ADAMS Accession Number' ML110871495

  • OFFICE PM: DLR/RPB1 LADLR BC: DLR/RPB1 PM: DLR/RPB1 NAME ACunanan IKing BPham I,;cullanan

~ATE 04/4/11 03/31/11 04/4111 04/5/11 OFFICIAL RECORD COpy

Letter to Energy Northwest from Arthur D. Cunanan dated April 5, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 23, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NUMBER ME3058)

DISTRIBUTION:

HARD COPY:

DLRRF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource ACunanan DDoyle MThadani WWalker, RIV RCohen, RIV LSubin,OGC