01/20/2011 Summary of Telephone Conference with NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application
ML110240202
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/03/2011
From: Cunanan A
License Renewal Projects Branch 1
To:
Cunanan, A D, NRR/DLR, 415-3897
References
Download: ML110240202 (5)


Text

February 3, 2011 LICENSEE: Energy Northwest FACILITY: Columbia Generating Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 20, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NUMBER ME3058)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest (the applicant), held telephone conference calls on January 20, 2011, to discuss and clarify the NRCs request for additional information (RAI) concerning the Columbia Generating Station, license renewal application. provides a listing of the participants and Enclosure 2 contains a listing of the RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Arthur D. Cunanan, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosures:

As stated cc w/encls: Distribution via Listserv

February 3, 2011 LICENSEE: Energy Northwest FACILITY: Columbia Generating Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 20, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NUMBER ME3058)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest (the applicant), held a telephone conference call on January 20, 2011, to discuss and clarify the NRCs request for additional information (RAI) concerning the Columbia Generating Station, license renewal application. provides a listing of the participants and Enclosure 2 contains a listing of the RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Arthur D. Cunanan, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosures:

As stated cc w/encls: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession Number: ML110240202 *via e-mail OFFICE PM: DLR:RPB1 LA: DLR* BC: DLR:RPB1 PM: DLR:RPB1 NAME ACunanan YEdmonds BPham ACunanan DATE 2/1/11 1/31/11 2/3/11 2/3/11 OFFICIAL RECORD COPY

TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS January 20, 2011 PARTICIPANTS: AFFILIATIONS:

Arthur Cunanan U.S. Nuclear Regulatory Commission (NRC)

Christopher Sydnor NRC Simon Sheng NRC Allen Hiser NRC Ching Ng NRC Abbas Mostala Energy Northwest (EN)

Scott Wood EN Steve Goslin EN John Sisk EN Jack Cole EN Ron Finnin AREVA David Lee AREVA Mitch McFarland AREVA Lori Tilly GE George Depta GE Hardayal Mehta GE ENCLOSURE 1

TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATIONS January 20, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest, held telephone conference calls on January 20, 2011, to discuss the following request for additional information (RAI) concerning the Columbia Generating Station (CGS) license renewal application (LRA).

RAI 4.2-1 Discussion: The staff discussed the BWRVIP-74-A, "BWR Vessel and Internals Project, BWR Reactor Pressure Vessel Inspection and Flaw Evaluation Guidelines for License Renewal,"

equivalent margins analysis (EMA) data does not include ASME Code,Section II, SA-508 alloy steel or carbon steel.

The applicant discussed that NEDO-32205-A is the basis document referenced in BWRVIP-74-A. The NEDO-32205-A does not include SA-508 material but references NUREG/CR-5729, which includes SA-508 material in the J-R curves but does not include stress analysis and a postulated flaw parameter for SA-508 forgings.

The staff discussed alternatives to provide projected calculations. The staff's RAl letter dated, December 20, 2010, will not change.

D-RAI 4.3-09 In response to RAI 4.3-06, dated November 11, 2010, the applicant provided the basis for not selecting the core shroud supports, main steam shell nozzles, and LPCI nozzle thermal sleeves as additional environmentally-assisted fatigue analysis locations.

Discussion: The staff discussed the applicants plant-specific configuration may contain locations that have a cumulative usage factor (CUF) which should be analyzed for the effects of the reactor coolant environment other than those identified in NUREG/CR-6260.

The applicant understands the question and requests a formal RAI letter. The applicant also discussed their concerns with the timeliness of their response.

The staff discussed alternatives in the timeline to provide an adequate response. The staff will send a formal RAI, numbered RAI 4.3-09.

ENCLOSURE 2

Memorandum to Energy Northwest from Arthur D. Cunanan dated February 3, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 20, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NUMBER ME3058)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource


ACunanan EGettys DDoyle BSingal WWalker, RIV RCohen, RIV LSubin, OGC