Letter Sequence Withdrawal |
|---|
TAC:ME1081, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEAR05000255/LER-2008-007-01, Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints2009-01-21021 January 2009 Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices Project stage: Request ML0910006472009-04-0808 April 2009 Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study Project stage: Request NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-06-0101 June 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement ML0917603382009-06-29029 June 2009 Deferral of the Extended Power Uprate Acceptance Review and Acceptance Review of the Auxiliary Feedwater Modifications and Non Conservative Setpoint Technical Specifications Project stage: Acceptance Review ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0922500082009-08-25025 August 2009 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0923104542009-08-26026 August 2009 Request for Additional Information from Electrical Engineering Branch Regarding Auxiliary Feedwater Project stage: RAI ML0924305172009-08-31031 August 2009 Notice of Meeting on AFW Modifications, Questions to Be Discussed Project stage: Meeting L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan2009-09-11011 September 2009 Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan Project stage: Request NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0108, License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions2009-10-0909 October 2009 License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions Project stage: Request ML0928005432009-10-19019 October 2009 Nonacceptance with the Opportunity to Supplement Letter for Extended Power Uprate Project stage: Other ML0929305162009-10-22022 October 2009 Request for Additional Information from Mechanical and Civil Engineering Branch Auxiliary Feedwater Modification Project stage: RAI ML0929308342009-10-22022 October 2009 Request for Additional Information from Balance of Plant Branch Auxiliary Feedwater Modification Project stage: RAI ML0929201272009-10-28028 October 2009 Summary of Meeting with FPL Energy Point Beach, LLC on the Auxiliary Feedwater Modification Amendment Project stage: Meeting ML0930205422009-11-0404 November 2009 Acceptance Review of Requested Licensing Action Regarding Extended Power Uprate Project stage: Acceptance Review ML0930603312009-11-0505 November 2009 Request for Additional Information from Technical Specification Branch Non-conservative Setpoint Changes (TAC Nos. ME1083 & ME1084) Project stage: RAI ML0930603012009-11-0606 November 2009 Request for Additional Information from Technical Specifications Branch Regarding Auxiliary Feedwater Project stage: RAI NRC 2009-0114, Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study2009-11-13013 November 2009 Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study Project stage: Request ML0931402312009-11-16016 November 2009 Request for Additional Information from Balance of Plant Branch Regarding Main Feedwater Isolation Valves Project stage: RAI NRC 2009-0125, License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System2009-11-20020 November 2009 License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System Project stage: Response to RAI NRC 2009-0123, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint2009-11-20020 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0932400282009-11-24024 November 2009 Request for Additional Information from Reactor Systems Branch Regarding Extended Power Uprate Project stage: RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0935002032009-12-22022 December 2009 Request for Additional Information from Reactor Systems Branch EPU Expedited Portions Project stage: RAI NRC 2010-0003, License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information2010-01-0808 January 2010 License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information Project stage: Request ML1000800812010-01-13013 January 2010 Request for Additional Information from Balance of Plant Branch Extended Power Uprate Project stage: RAI NRC 2010-0005, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-01-13013 January 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI ML1002500112010-01-22022 January 2010 Response Request for Additional Information License Amendment Request 261 Extended Power Uprate Project stage: Request NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request ML1001203312010-02-0101 February 2010 Request for Additional Information from Electrical Engineering Branch Auxiliary Feedwater - Round 2 Project stage: RAI NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1006803682010-03-10010 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss the Alternative Source Term, Auxiliary Feedwater, and Extended Power Uprate Amendments Project stage: Meeting ML1007806102010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007506852010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1008103682010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007804772010-03-31031 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI 2009-04-08
[Table View] |
Text
September 28, 201 0 NRC 2010-0146 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington,.DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 261, Extended Power Uprate Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate
References:
(I)
FPL Energy Point Beach, LLC letter to NRC, dated April 7, 2009, License Amendment Request 261, Extended Power Uprate (ML091250564)
(2)
NextEra Energy Point Beach, LLC letter to NRC, dated August 2, 2010, License Amendment Request 261, Extended Power Uprate, Transmittal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate (MLI 021 80370)
(3)
NextEra Energy Point Beach, LLC letter to NRC, dated July 28, 2010, License Amendment Request 261, Supplement 6, Extended Power Uprate NextEra Energy Point Beach, LLC (NextEra) submitted License Amendment Request (LAR) 261 (Reference I ) to the NRC pursuant to 10 CFR 50.90. The proposed amendment would increase each unit's licensed thermal power level from 1540 megawatts thermal (MWt) to 1800 MWt, and revise the Technical Specifications (TS) to support operation at the increased thermal power level.
NextEra withdraws the Reference (2) submittal for reactor protection system (RPS) and engineered safety features actuation system (ESFAS) setpoints not related to the extended power uprate (EPU) in its entirety. NextEra will not implement non-EPU related RPS and ESFAS TS changes prior to implementation of the EPU on each Unit. NextEra now plans to implement the non-EPU and EPU RPS and ESFAS TS changes submitted in Reference (3) at the same time for each unit.
This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, W 54241
Document Control Desk Page 2 In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 28,2010.
Very truly yours, NextEra Energy Point Beach, LLC Larry Meyer Site Vice President cc:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW