Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
Results
Other: ML071210530, ML071840939, ML072830629, ML083540614, ML090790176, ML090790187, ML090820316, ML090820317, ML090820318, ML090820319, ML092860253, ML102930012, ML103060210, ML110200539, ML110350022, ML110550751, ML11187A054, ML11187A055, ML11200A052, ML11276A008, ML11286A140, ML11290A232, ML11305A021, ML12055A234, ML12055A254, ML12157A287, ML12165A684, ML13014A633, ML13161A389, ML13162A604, ML13162A616, ML14136A005, ML14192B395, ML14220A317, ML15114A080, ML15114A081, ML15114A082, ML15114A083, ML15114A084, ML15114A085, ML15166A070, NL-08-023, Entrainment and Impingement at IP2 and IP3: a Biological Impact Assessment, NL-11-024, Letter from Fred Dacimo to Andrew Stuyvenberg Regarding Endangered Species Act Consultation for Indian Point Nuclear Generating Unit Nos. 2 & 3, NL-11-078, License Renewal Thermal Study Documents, NL-11-081, Clean Water Act Section 401 Water Quality Certification Waiver
|
MONTHYEARML0712105302007-04-23023 April 2007 License Renewal Application. Appendix E, Applicant'S Environment Report Project stage: Other ML0719900932007-06-26026 June 2007 Ltr. Michael Kaplowitz Re Incompleteness and Inaccurate License Renewal Application for Indian Point Energy Center, Units 2 and 3 Project stage: Request ML0718409392007-08-0606 August 2007 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Indian Point Nuclear Generating Units 2 and 3 (TAC MD5411 and MD 5412) Project stage: Other ML0728902092007-09-19019 September 2007 Transcript of Indian Point License Renewal Public Meeting: Evening Session, September 19, 2007, Pages 1-126 Project stage: Meeting ML0728901992007-09-19019 September 2007 Transcript of Indian Point License Renewal Public Meeting: Afternoon Session, September 19, 2007, Pages 1-105 Project stage: Meeting ML0728306132007-09-19019 September 2007 License Renewal Application, Environmental Scoping Meeting - September 19, 2007, Written Submittals from Audience - 7:00 Pm Project stage: Meeting ML0728306292007-09-19019 September 2007 License Renewal Application Environmental Scoping Mtg., Written Submittals from Audience - 1:30 Project stage: Other ML0728508952007-10-11011 October 2007 License Renewal Environmental Scoping Meeting Project stage: Meeting ML0728510792007-10-24024 October 2007 09/19/2007 Summary of Public Environmental Scoping Meetings Related to the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application (TAC Nos. MD5411 and MD5412) Project stage: Meeting ML0731009852007-10-25025 October 2007 Revised Fuse Comments on Scope of Environmental Impact Statement and Scoping Process Indian Point Energy Center Unit 2 and Unit 3 Project stage: Request ML0733309312007-12-0505 December 2007 Request for Additional Information Regarding Environmental Review for Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal (TAC Nos. MD5411 and MD5412) Project stage: RAI ML0731104472007-12-0707 December 2007 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Project stage: RAI ML0803800962008-01-30030 January 2008 Supplemental Response to Request for Additional Information Regarding Environmental Review for License Renewal Application Project stage: Response to RAI NL-08-023, Entrainment and Impingement at IP2 and IP3: a Biological Impact Assessment2008-01-31031 January 2008 Entrainment and Impingement at IP2 and IP3: a Biological Impact Assessment Project stage: Other NL-08-028, Official Exhibit - ENT000460-00-BD01 - NL-08-028, Letter from Fred Dacimo, Entergy, to NRC Reply to Request for Additional Information Regarding License Renewal Application - Severe Accident Mitigation Alternatives Analysis (Feb. 5, 2008)2008-02-0505 February 2008 Official Exhibit - ENT000460-00-BD01 - NL-08-028, Letter from Fred Dacimo, Entergy, to NRC Reply to Request for Additional Information Regarding License Renewal Application - Severe Accident Mitigation Alternatives Analysis (Feb. 5, 2008) Project stage: Response to RAI ML0809904032008-02-28028 February 2008 Essential Fish Habitat Information Request for Docket 50-247 and 50-286; Indian Point Nuclear Generating Units 2 and 3 License Renewal, at the Village of Buchanan, Town of Cortlandt, Westchester County, Ny Project stage: Request ML0807704572008-03-0707 March 2008 Document Request for Additional Information Regarding Environmental Review for License Renewal Application - Hudson River Fisheries Program Data (Year Class Report) Project stage: Request ML0809209832008-04-0909 April 2008 03/18/2008-Summary of Telephone Conference Call Between NRC and Entergy Nuclear Operations, Inc., Pertaining to the Indian Point Units 2 & 3, License Renewal Application - Environmental Request for Additional Information Project stage: RAI ML0808801042008-04-0909 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0809404082008-04-14014 April 2008 Request for Additional Information Regarding the Review of the License Renewal Application for Indian Point Nuclear Generating Unit Nos. 2 & 3 (TAC Nos. MD5411 and MD5412) Project stage: RAI NL-08-061, Reply to Document Request for Additional Information Regarding Site Audit Review of License Renewal Application2008-04-23023 April 2008 Reply to Document Request for Additional Information Regarding Site Audit Review of License Renewal Application Project stage: Request ML0810004412008-04-23023 April 2008 Revision of Schedule for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application Project stage: Approval ML0833805912008-04-30030 April 2008 SEIS Reference - Assessment of United Water New York Supply by Rockland County Department of Health Project stage: Request NL-08-083, Reply to Request for Additional Information Regarding License Renewal Application - Refurbishment2008-05-14014 May 2008 Reply to Request for Additional Information Regarding License Renewal Application - Refurbishment Project stage: Response to RAI ML0833805612008-05-21021 May 2008 SEIS Reference - Chemicals in Sportfish and Game: 2007-2008 Health Advisories by Nydoh Project stage: Request NL-08-086, Supplemental Reply to Request for Additional Information Regarding License Renewal Application - Severe Accident Mitigation Alternatives Analysis2008-05-22022 May 2008 Supplemental Reply to Request for Additional Information Regarding License Renewal Application - Severe Accident Mitigation Alternatives Analysis Project stage: Response to RAI ML0833900172008-07-17017 July 2008 SEIS Reference - Online Conservation Guide for Glyptemys Muhlenbergii Project stage: Request ML0835405942008-12-0101 December 2008 NUREG-1437, Suppl. 38, Vol. 1, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38, Regarding Indian Point Nuclear Generating, Unit Nos. 2 and 3, Main Report Project stage: Acceptance Review ML0835406142008-12-0101 December 2008 NUREG-1437, Suppl. 38, Vol. 2, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38, Regarding Indian Point Nuclear Generating, Unit Nos. 2 and 3, Appendices Project stage: Other ML0833900342008-12-0202 December 2008 SEIS Reference - Significant Habitats and Habitat Complexes of the New York Bight Watershed by Fws Project stage: Request ML0833900322008-12-0202 December 2008 SEIS Reference - Westchester County Federally Listed Endangered and Threatened Species and Candidate Species by Fws Project stage: Request ML0833900302008-12-0202 December 2008 SEIS Reference - Cynoscion Regalis Gray Weakfish Project stage: Request ML0833900252008-12-0202 December 2008 SEIS Reference - Native Plant Database by Npin Project stage: Request ML0833900232008-12-0202 December 2008 SEIS Reference - Maryland Fish Facts: American Gizzard Shad by Mdnr Project stage: Request ML0833806672008-12-0303 December 2008 SEIS Reference - Trinectes Maculates Fasciatus: Hogchoker Project stage: Request ML0833805702008-12-0303 December 2008 SEIS Reference - Plant Fact Sheets by Ncsu Project stage: Request ML0833805722008-12-0303 December 2008 SEIS Reference - Shortnose Sturgeon (Acipenser Brevirostrum) by Opr Project stage: Request ML0833805752008-12-0303 December 2008 SEIS Reference - Butterflies and Moths of North America Project stage: Request ML0833805402008-12-0303 December 2008 SEIS Reference - Peregrine Falcon Fact Sheet by NYSDEC Project stage: Request ML0833806192008-12-0303 December 2008 SEIS Reference - Status of Fishery Resources Off the Northeastern U.S.: Atlantic and Shortnose Sturgeons Project stage: Request ML0833806232008-12-0303 December 2008 SEIS Reference - Zebra Mussels and the Hudson River Project stage: Request ML0833806272008-12-0303 December 2008 SEIS Reference - Comprehensive Master Plan, Town of Cortlandt, July 2004 Project stage: Request ML0833806292008-12-0303 December 2008 SEIS Reference - Town Profile Project stage: Request ML0833806612008-12-0303 December 2008 SEIS Reference - Annual Drinking Water Quality Report for 2005 by Wjww Project stage: Request ML0833805532008-12-0303 December 2008 SEIS Reference - New York State Amphibian and Reptile Atlas Project by NYSDEC, Species of Turtles Found in New York Project stage: Request ML0833805452008-12-0303 December 2008 SEIS Reference - Bog Turtle Fact Sheet by NYSDEC Project stage: Request ML0833805422008-12-0303 December 2008 SEIS Reference - Peregrine Falcon by NYSDEC Project stage: Request ML0833806332008-12-0303 December 2008 SEIS Reference - Census of Agriculture, Volume 1 Chapter 2: Pennsylvania County Level Data Project stage: Request ML0833805312008-12-0303 December 2008 SEIS Reference - Bald Eagle Fact Sheet by NYSDEC Project stage: Request ML0833806592008-12-0303 December 2008 SEIS Reference - Westchester County Databook: History, Geography, and Land Use Project stage: Request 2008-12-02
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
\
- NORTHEAST REGION t 55 Great Republic Drive "Args of Gloucester, MA 01930-2276 FEB 24 2009 David J. Wrona, Branch Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Program US Nuclear Regulatory Commission Washington, DC 20555-0001 RE: Biological Assessment for License Renewal of the Indian Point Nuclear Generating Unit Nos. 2 and 3
Dear.Mr. Wrona:
- ..
This -correspondence respondsto a. 16tter dated Decemb-er 22, 2008-(r'ceived Jhnuri 2; 2009) regarding the initiation of forh'nal couspitation for the' proposod r'neoMal, bythe US Nuclear Regulatory Commission (NRC) of the Indtiah' Pbiit Nucda"a enerating' Unit Nos.2 ad 3 (NP2' and IP3) operating licenses for a period of an additional 20 years pursuant to Section 7 of the Endangered Species. Act (ESA) of 1973, a§ amended. The c*rrent operatingtlicenses for these units expire on September 28, 2013 (IP2) and December 12, 2015'(IP3). Consultation with NOAA's NationalMarine Fisheries Service (NMFS) regarding the proposed' licens*&renewal is:"
appropriate as the action may adversely affect the federally dendangered shortn'ose sturgeon (Acipenser brevirostrum). Accompanying your letter' was a Biological Assessment (BA) evaluating the impact of the proposed renewal on federally endangered sh6r.tnose sturgeon (Acipenser brevirostrum), as well as a copy of the Generic EnvironmentalImpactStatementfor License Renewal.QfNuclear Plants,Supplement 39 Regarding*hdin PointNuclear Generating Unit Nos. 2 and 3 Draft Report.. NMFS has completed an'initi al-review' of the BA and dr.aft EIS and has determined that we have 'not received all of the*iiforniation"necessary to initiate;.
consultation. To compiete the initiation pd'kage, we will requiir6'the information outlined below.
Section, 4 of'the. BA contains life history and status iiifornihation for 'shortnose; sttrgeon: Several corrections are necessary in this section. In the Hudson Rver, shortnose sturgeon'spdn when water temperatures are between 8 and 150 C, which typically occuis 'in' April. Recent infornation
- suggests that the population estimate calculated by Bain, and included in the BA, likely overestimates the number of shortnose sturgeon in the Hudson River. Dr. Katherine Hattala, a
biologist with the State of New.York, has examined the data used by Bain and determined that a more appropriate estimate is approximately 30,000 adult shortnose sturgeon.
Section 4.3.2 of the BA assesses the impact of impingement on shortnose sturgeon. The BA contains a summary of the available information on impingement of shortnose sturgeon (Table 2). NMFS requests that NRC staff provide the following information in regards to Table 2: (a) for each year, indicate the level of monitoring effort (e.g. weekly for six months, etc.); (b) for each year when there is no number recorded, indicate whether that was due to a lack of monitoring, or due to a lack of capture; (c) indicate the date of impingement; and, (d) indicate the size 'and condition (i.e., alive, injured or dead) of the impinged fish. It is our understanding that no impingement monitoring has been conducted since traveling Ristroph-type screens were installed at the facility in 1991. As noted in the BA, the lack of information' makes it difficult to predict the effects of relicensing and an additional 20 years of operation on shortnose sturgeon.
If the NRC is not able to require the applicant to conduct monitoring in support of relicensing, NMFS requests that the NRC provide an estimate, based on the best available scientific information, of the likely number of shortnose sturgeon impinged at the facility with the traveling Ristroph-type screens in use. NMFS expects that the NRC could use the existing impingement data in conjunction with data on the effectiveness of Ristroph-type screens to calculate this estimate. As noted in the BA, another important factor is the mortality rate of impinged sturgeons. NMFS requests that NRC provide an estimate of the mortality rate for impinged shortnose sturgeon. NMFS expects this rate could be calculated based on available mortality rate data for other similar species and/or other facilities where similar screen types have been installed.
Section 4.3.3 of the BA discusses thermal impacts. As noted in the BA, without a model of the thermal plume it is extremely difficult to predict what the level of exposure to elevated water temperatures is for shortnose sturgeon. If NRC is unableto require that the applicant conduct modeling of the thermal plume in support of relicensing, NMFS requests that the NRC use the best available scientific information to estimate the likely temporal and spatial extent to which shortnose sturgeon will be exposed to water temperatures where adverse effects are likely (i.e.,
greater than 28°C).
It is NMFS understanding that the proposed action is the relicensing of the facility with no modification to the existing intakes. However, in the DEIS, the NRC discusses alternatives including'cooling towers. NMFS seeks clarification as to the process by which the NRC will determine whether the installation of cooling towers, or other measures, will be required of the applicant. NMFS also seeks clarification regarding the current requirements of the National POllutant Discharge Elimination System (NPDES) Permit issued by the State of New York and the potential outcome~of the adjudication process currently ongoing regarding this permit, as well as the potential for the State NPDES permit to require cooling towers.
The formal consultation process for the proposed action will not begin until we receive all of the requested information or a statement explaining why that information cannot be made available.
We will notify you when we receive this additional information; our notification letter will also outline the dates within which formal consultation should be complete and the biological opinion 2
delivered. My staff is available to discuss these information needs with NRC staff. I look forward to continuing to work with you and your staff during the consultation process. If you have any questions or concerns about this letter or about the consultation process in general, please contact Julie Crocker at (978) 282-8480.
Sincerely, Mary A. Colligan Assistant Regional Administrator for Protected Resources cc: Crocker, F/NER3 (hardcopy)
Damon-Randall, Hartley - F/NER3 (pdf)
Rusanowsky- F/NER4 (pdf)
Logan - NRC (pdf)
File Code: Sec 7 NRC Indian Point Nuclear Plant Relicensing PCTS: F/NER/2009/00619 3