ML042660047

From kanterella
Jump to navigation Jump to search
August 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2
ML042660047
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/13/2004
From: Polson K
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW040085
Download: ML042660047 (4)


Text

ExeklnSM Exelon Generation Company, LLC www.exeloncorp.com Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 September 13, 2004 BW040085 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of August 1, 2004 through August 31, 2004.

If you have any questions regarding this letter, please contact Mr. Dale Ambler, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, Keith J. Polson Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator- NRC Region III NRC Senior Resident Inspector - Braidwood Station

ATTACHMENT BRAIDWOOD STATION UNITS I AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

Docket No: 50-456 Unit: Braidwood I Date: 0910212004 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit I Reporting Period: August 2004 A. OPERATING DATA REPORT Design Electrical Rating (MWe Net) 1187 Maximum Dependable Capacit (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 744.0 5,855.0 120 722.6 Hours Generator on Line (Hours) 744.0 5,855.0 119,749.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 879 750 6,953 725 130 145 912 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip/ Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

Unit operated normally at full power for the entire month.

C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No.& Type Plant Condition Description of Event I Actuation None Data From: Production Data Bank and Operator Logs

Docket No: 50-457 Unit: Braidwood 2 Date: 09/02/2004 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period: August 2004 A. OPERATING DATA REPORT Desiin Electrical Rating (MWe Net) 1155 lMaximum Dependable Capacit (MWe Net) l 1129 l I Month I Year To Date I Cumulative I Hours Reactor Critical (Hours) 744.0 5,855.0 124,288.3 Hours Generator on Line (Hours) 744.0 5,855.0 123,639.9 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 861,113 6,823,858 133,962,658 B. UNIT SHUTDOWNS DYEE REASON METHOD F - Forced A - Equipment Failure (explain) I - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

Unit operated normally at full power for the entire month.

C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event NoI Actuation NoneI Data From: Production Data Bank and Operator Logs