MONTHYEARIR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) 05000456/LER-2024-001, Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open2024-07-0303 July 2024 Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 2024-08-09
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0517204222005-06-13013 June 2005 May 2005 Monthly Operating Report for Braidwood Station Units 1 & 2 ML0513902882005-05-13013 May 2005 April 2005 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0511201952005-04-15015 April 2005 March 2005 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0508105832005-03-14014 March 2005 February 2005 Monthly Operating Report for Braidwood, Units 1 & 2 ML0505405672005-02-14014 February 2005 January 2005 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0502601972005-01-14014 January 2005 December 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0435802392004-12-14014 December 2004 November 2004 Monthly Operating Report Braidwood Station Units 1 and 2 ML0432804062004-11-12012 November 2004 October 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0429903872004-10-14014 October 2004 September 2004 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0426600472004-09-13013 September 2004 August 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0423702802004-08-13013 August 2004 July 2004 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0420303442004-07-13013 July 2004 June 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0417406942004-06-11011 June 2004 May 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0414502852004-05-13013 May 2004 April 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0411203522004-04-13013 April 2004 March 2004 Monthly Operating Report for Braidwood, Units 1 & 2 ML0411703002004-03-12012 March 2004 February 2004 Monthly Operating Report for Braidwood, Units 1 and 2 ML0404905272004-02-12012 February 2004 January 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0402107402004-01-13013 January 2004 December 2003 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0402107412004-01-13013 January 2004 December 2003 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0335702042003-12-15015 December 2003 November 2003 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0332903592003-11-12012 November 2003 October 2003 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0329405892003-10-10010 October 2003 September 2003 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0326709902003-09-12012 September 2003 August 2003 Monthly Operating Report for Braidwood, Units 1 & 2 ML0323302572003-08-14014 August 2003 July 2003 Monthly Operating Report for Braidwood Station ML0321103932003-07-14014 July 2003 June 2003 Monthly Operating Report for Braidwood, Units 1 & 2 ML0317003802003-06-11011 June 2003 May 2003 Monthly Operating Report for Braidwood Station Units 1 & 2 ML0313507492003-05-0909 May 2003 April 2003 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0311301112003-04-11011 April 2003 March 2003 Monthly Operating Report for Braidwood Units 1 & 2 ML0307902852003-03-12012 March 2003 February 2003 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0305501252003-02-12012 February 2003 January 2003 Monthly Operating Report for Braidwood Units 1 & 2 ML0302703502003-01-14014 January 2003 December 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0236000342002-12-13013 December 2002 November 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0232602872002-11-14014 November 2002 October 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0229605412002-10-14014 October 2002 September 2002 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0226804842002-09-13013 September 2002 August 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0224802712002-08-12012 August 2002 July 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0220500632002-07-12012 July 2002 June 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0217000942002-06-12012 June 2002 May 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0215002292002-05-13013 May 2002 April 2002 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0211903762002-04-12012 April 2002 March 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0208007562002-03-13013 March 2002 February 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0207106322002-02-12012 February 2002 January 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0204300142002-01-11011 January 2002 December 2001 Monthly Operating Report for Braidwood Station, Units 1 & 2 2005-06-13
[Table view] |
Text
ExekentM Exelon Generation Company, LLC www.exeloncorp.com NucleaT Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 December 15, 2003 BWO30116 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units I and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457
Subject:
Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of November 1, 2003 through November 30, 2003.
If you have any questions regarding this letter, please contact Ms. Kelly Root, Regulatory Assurance Manager, at (815) 417-2800.
Respectfully, CABe b T. P. Joyce Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station
ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457
Docket No: 50-456 Unit: Braidwood 1 Date: 12/0912003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit I Reporting Period: November 2003 A. OPERATING DATA REPORT IDesign Electrical Rating (MWe Net) 1187 IMaximum Dependable Capacity (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 720.0 7,619.1 114,123.6 Hours Generator on Une (Hours) 720.0 7,608.0 113,150.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 877,897 9,196,305 122,293,725 B. UNIT SHUTDOWNS TYPE REASON METHOD F- Forced A - Equipment Failure (explain) I - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain)
N Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None
SUMMARY
The Unit performed normally at full load for the entire month.
C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event
. . Actuation None .
Data From: Production Data Bank and Operator Logs
Docket No: 50-457 Unit Braidwood 2 Date: 12/09/2003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period: November 2003 A. OPERATING DATA REPORT IDesign Electrical Rating (MWe Net) 15 IMaximum Dependable Capacity (MWe Net) 1 1154 Month Year To Date Cumulative Hours Reactor Critical (Hours) 362.0 7,658.0 117,713.6 Hours Generator on Line (Hours) 347.5 7,643.5 117,090.9 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 373,303 9,127,379 126,334.014 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain)
No Date Type Duration Reason Method Cause and Corrective Actions and I_____________________ Hours Comments 1 11/0312003 S 367.1 C 1 Normal Refueling OutageA2R10 2 11/19/2003 S 5.4 B 1 Repair EH Fluid Leak
SUMMARY
The Unit started November in coastdown and began its normal A2R10 refueling outage on November 3rd. On November 19th, the Unit was briefly placed on line as a system test and then removed from service to repair a known EH system leak. Later on November 19th, the Unit was returned to service and performed normally during power ascension and reached full power on November 21st.
C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event Actuation None Data From: Production Data Bank and Operator Logs
Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 December 12, 2003 NRC-03-0100 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for November 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for November 2003. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely, Enclosure cc: R. J. Aben, Jr.
H. K. Chernoff J.E.Dyer M. A. Ring M. V. Yudasz, Jr.
NRC Resident Office Region m A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE December 12, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: November 2003
- 1. Design Electrical Rating (MWe-Net) 1,150.00
- 2. Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 720.00 6,870.05 107,152.05
- 4. Number of Hours Generator On-line 720.00 6,736.26 103,264.62
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 808.058.00 7,296,685.00 103,792,431.0 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments None
SUMMARY
- No significant downpowers or shutdowns this month.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)