November 2003 Monthly Operating Report for Braidwood Station Units 1 and 2
ML033570204
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/15/2003
From: Joyce T
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW030116
Download: ML033570204 (6)


Text

ExekentM Exelon Generation Company, LLC www.exeloncorp.com NucleaT Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 December 15, 2003 BWO30116 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units I and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of November 1, 2003 through November 30, 2003.

If you have any questions regarding this letter, please contact Ms. Kelly Root, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, CABe b T. P. Joyce Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station

ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

Docket No: 50-456 Unit: Braidwood 1 Date: 12/0912003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit I Reporting Period: November 2003 A. OPERATING DATA REPORT IDesign Electrical Rating (MWe Net) 1187 IMaximum Dependable Capacity (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 720.0 7,619.1 114,123.6 Hours Generator on Une (Hours) 720.0 7,608.0 113,150.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 877,897 9,196,305 122,293,725 B. UNIT SHUTDOWNS TYPE REASON METHOD F- Forced A - Equipment Failure (explain) I - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

N Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

The Unit performed normally at full load for the entire month.

C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event

. . Actuation None .

Data From: Production Data Bank and Operator Logs

Docket No: 50-457 Unit Braidwood 2 Date: 12/09/2003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period: November 2003 A. OPERATING DATA REPORT IDesign Electrical Rating (MWe Net) 15 IMaximum Dependable Capacity (MWe Net) 1 1154 Month Year To Date Cumulative Hours Reactor Critical (Hours) 362.0 7,658.0 117,713.6 Hours Generator on Line (Hours) 347.5 7,643.5 117,090.9 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 373,303 9,127,379 126,334.014 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and I_____________________ Hours Comments 1 11/0312003 S 367.1 C 1 Normal Refueling OutageA2R10 2 11/19/2003 S 5.4 B 1 Repair EH Fluid Leak

SUMMARY

The Unit started November in coastdown and began its normal A2R10 refueling outage on November 3rd. On November 19th, the Unit was briefly placed on line as a system test and then removed from service to repair a known EH system leak. Later on November 19th, the Unit was returned to service and performed normally during power ascension and reached full power on November 21st.

C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event Actuation None Data From: Production Data Bank and Operator Logs

Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 December 12, 2003 NRC-03-0100 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for November 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for November 2003. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Enclosure cc: R. J. Aben, Jr.

H. K. Chernoff J.E.Dyer M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region m A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE December 12, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: November 2003

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 720.00 6,870.05 107,152.05
4. Number of Hours Generator On-line 720.00 6,736.26 103,264.62
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 808.058.00 7,296,685.00 103,792,431.0 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments None

SUMMARY

No significant downpowers or shutdowns this month.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)