February 2003 Monthly Operating Report for Braidwood Station, Units 1 & 2
ML030790285
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/12/2003
From: Joyce T
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW030015
Download: ML030790285 (4)


Text

Exelknt Exelon Generation Company, LLC wwwexeloncorpcorn Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL60407-9619 Tel 815-417-2000 March 12, 2003 BW030015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of February 1, 2003 through February 28, 2003.

If you have any questions regarding this letter, please contact Mr. Scott Butler, Acting Regulatory Assurance Manager, at (815) 417-3540.

Respectfully, T. ce Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator- NRC Region III NRC Senior Resident Inspector - Braidwood Station

ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

4 .. -

Docket No- 50-456 Unit Braidwood 1 Date 03/04/2003 Completed by: Don Hildebrant Telephone. (815)417-2173 Braidwood Unit 1 Reporting Period February 2003 A. OPERATING DATA REPORT Design Electrical Rating (MWe Net 1187 Maximum Dependable Capacity (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 672.0 1,416.0 107,920.5 Hours Generator on Line (Hours) 672.0 1,416.0 106,9588 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 825,173 10,623,704 114,835,275 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

The Unit performed normally at full load for the entire month.

C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event I Actuation None Data From: Production Data Bank and Operator Logs

Docket No. 50-457 Unit- Braidwood 2 Date: 03/04/2003 Completed by. Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period* February 2003 A. OPERATING DATA REPORT Desi n Electrical Rating MWe Net) 1155 Maximum Dependable Capacity (MWe Net 1154 Month Year To Date Cumulative Hours Reactor Critical (Hours) 672.0 1,416.0 111,471.6 Hours Generator on Line (Hours) 672.0 1,416.0 110,8634 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 815,147 9,511,748 118,925,356 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

The Unit performed normally at full load for the entire month.