July 2003 Monthly Operating Report for Braidwood Station
ML032330257
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/14/2003
From: Joyce T
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW030067
Download: ML032330257 (4)


Text

ExekInM Exelon Generation Company, LLC www.exeloncorp.com Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 August 14, 2003 BW030067 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washingt6n, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of July 1,2003 through July 31, 2003.

If you have any questions regarding this letter, please contact Ms. Kelly Root, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, T. P. Joyce Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station

-tr ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

Docket No: 50-456 Unit: Braidwood 1 Date: 08/04/2003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braldwood Unit I Reporting Period: July 2003 A. OPERATING DATA REPORT lDestgn Electrical Ratin (MWe Net) 1187 tMaximum Dependable Capacity (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 744.0 4,690.1 111'194.6 Hours Generator on Line (Hours) I 744.0 4,679.0 I 110,221.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 897 675 5,634,721 118,732,141 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

I_________

No Date Type Duration Reason Hours Method Cause and Corrective Actions and Comments

SUMMARY

The Unit performed normally at full load for the entire month.

C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuate No. & Type Plant Condition Description of Event None Actuatin Data From: Production Data Bank and Operator Logs

Docket No: 50-457 Unit: Braidwood 2 Date: 08/04/2003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braldwood Unit 2 Reporting Period: July 2003 A. OPERATING DATA REPORT FDhesion Electrical Rating (MWe Net) 1155 IMaximum Dependable Capacity (MWe Net) I 1154 Month Year To Date Cumulative Hours Reactor Critical (Hours) 744.0 5,087.0 115,142.6 l Hours Generator on Line (Hours) 744.0 5,087.0 114,534.4 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 883,723 6,130,249 123,336,884 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A- Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None The Unit performed normally at full load for the entire month with some minor load reductions required by Load Dispatch and to perform TVGV testing.

C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event I Actuation None Data From: Production Data Bank and Operator Logs