December 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2
ML030270350
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/14/2003
From: Joyce T
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW030002
Download: ML030270350 (5)


Text

Exeklanm Exelon Generation Company, LLC www exeloncoTp corn Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL60407-9619 Tel 815-417-2000 January 14, 2003 BW030002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of December 1, 2002 through December 31, 2002.

If you have any questions regarding this letter, please contact Ms. Amy Ferko, Regulatory Assurance Manager, at (815) 417-2699.

Respectfully, Plant Manager Braidwood Station Attachment cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Braidwood Station

ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

Docket No: 50-456 Unit: Braidwood 1 Date: 01/03/2003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 1 Reporting Period: December 2002 A. OPERATING DATA REPORT Desi n Electrical Rating (MWe Net) 1187 Maximum Dependable Capacity (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 744.0 8,760.0 106,504.5 Hours Generator on Line (Hours) 744.0 8,760.0 105,542.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 909,509 10,612,240 113,097,420

  • In June 2002, the Net Monthly Generation was reported as 851,216 and is here corrected to 855,352. The Net Year To Date and Cumulative values on this report reflect this correction.

B. UNIT SHUTDOWNS TYPE ,REASON METHOD F - Forced A - Equipment Failure (explain) 1- Manual S - Scheduled B- Maintenance orTest 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

The Unit performed normally at full load for the entire month.

C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event I Actuation None Data From: Production Data Bank and Operator Logs

Docket No. 50-457 Unit: Braidwood 2 Date: 01/03/2003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period: December 2002 A. OPERATING DATA REPORT Desgin Electncal Rating (MWe Net) 1155 Maximum Dependable Capacity (MWe Net) 1154 Month Year To Date Cumulative Hours Reactor Critical (Hours) 744 0 8,197.2 110,055.6 Hours Generator on Line (Hours) 662.0 8,099.7 109,447.4 Unit Reserve Shutdown (Hours) 00 0.0 0.0 Net Electrical Energy (MWh) 776,764 9,449,484 117,206,635

  • In June 2002, the Net Monthly Generation was reported as 858,149 and is here corrected to 854,013. The Net Year To Date and Cumulative values on this report reflect this correction.

B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) ' 1-Manual t S - Scheduled B - Maintenance or Test 2- Manual Trip / Scram C - Refueling ' I 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments 3 12/27/2002 S 82 B 5 On 12/27/2002 Unit 2 was removed from service to adjust and evaluate Generator vibrations. During this short duration outage, the Reactor was maintained in Mode 1 and thus a code of 5 is provided as the Method Code.

SUMMARY

The Unit performed normally at full load for the entire month except for the scheduled 82 hour9.490741e-4 days <br />0.0228 hours <br />1.35582e-4 weeks <br />3.1201e-5 months <br /> maintenance outage described above.

C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event D Actuation None Data From- Production Data Bank and Operator Logs

Exekn. Nuclear n' ^v NudeaTPage T-1002 March 30 ,2001 1 of 1 TYPICAL LICENSING AND REGULATORY AFFAIRS CORRESPONDENCE CONCURRENCE FORM Organizational review denotes reviewer concurrence of the information and commitments (ifany) made in this document.

Correspondence Number (if applicable): GW 0*1 L00o...

Location from which the Correspondencewill be submitted: (! >r2f-,,Jb sJ-

Subject:

A0r1-TI0L7 OMWLV*'*ic, P-E--,rPr-"-- )L-mi-0.

Prepared By: boro WiLlo rQa.. Jti, Due Date: i1- IO4

Reference:

_ A: __

Orqanization Concurrence Due Date Print Name/Signature Date

[] Operations -Date:

[] Maintenance -. Date:

I =36.5 Engineering C. Date:

[] Radiation Protection Date:

[] Training Date:

Security Date:

[1 - I o-O3~ Regulatory-Services V. C ,-j- j,.*- F-M L Date:

[Yj Independent Technical Review Date:

[1 PORC Date:

Other Date:

Final Review and Approval

[N Licensing/Regulatory AssuranceQ/ ,J---* Date: /_//,, I__

Pf Station Manager:. Date:

/

[ ] Site Vice President:

/ Date: ____

Comments: