ML041120352

From kanterella
Jump to navigation Jump to search
March 2004 Monthly Operating Report for Braidwood, Units 1 & 2
ML041120352
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/13/2004
From: Polson K
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW040039
Download: ML041120352 (4)


Text

ExeIenSM Exelon Generation Company. LLC www.exeloncorp.com Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 April 13, 2004 BW040039 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of March 1, 2004 through March 31, 2004.

If you have any questions regarding this letter, please contact Ms. Kelly Root, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, Keith . Poison Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator- NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station

ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

Docket No: 50-456 Unit: Braidwood I Date: 04102/2004 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 1 Reporting Period: March 2004 A. OPERATING DATA REPORT Design Electrical Rating (MWe Net) 1187 lMaximum Dependable Capacity (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 744.0 2,184.0 117,051.6 Hours Generator on Line (Hours) 744.0 2.184.0 116,078.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 899,487 2,605,562 125.797,749 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

N Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

The Unit operated normally at full power for the entire month.

C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event I Actuation None Data From: Production Data Bank and Operator Logs

Docket No: 50-457 Unit: Braidwood 2

-Date: 0410212004 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period: March 2004 A. OPERATING DATA REPORT Design Electrical Rating (MWe Net) 1155 Maximum Dependable Capacity (MWe Net) 1129 I Month I YearToDate I Cumulative I Hours Reactor Critical (Hours) 744.0 2.184.0 120,617.3 Hours Generator on Line (Hours) 744.0 2,184.0 119,968.9 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 875.496 2,564,659 129.703,459 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) I - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain) ii No

SUMMARY

Date Nonel Type Duration Reason

__= _

Hours Method The Unit operated normally at full power for the entire month.

Cause and Corrective Actions and Comments C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event nActuation I None Il Data From: Production Data Bank and Operator Logs