February 2005 Monthly Operating Report for Braidwood, Units 1 & 2
ML050810583
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/14/2005
From: Boerschig G
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW050026
Download: ML050810583 (4)


Text

Exekldn.M Exelon Generation Company, LLC www.exeloncorp.com Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 March 14, 2005 BW050026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of February 1, 2005 through February 28, 2005.

If you have any questions regarding this letter, please contact Mr. Dale Ambler, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator- NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station

ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

Docket No: 50-456 Unit: Braidwood I Date: 03/03/2005 Completed by: Don Hildebrant Telephone: (815)417-2173 Braidwood Unit I Reporting Period: February 2005 A. OPERATING DATA REPORT PDesiin Electrical Rating (MWe Net) l 1187 Maximum Dependable Capacit MWe Net) l 1156 Month Year To Date Cumulative Hours Reactor Critical (Hours) 672.0 1,416.0 124,608.7 Hours Generator on Line (Hours) 672.0 1,416.0 123,620.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Ener MWh 810,887 1,705,260 134,704,634 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) I - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

N j Date None l

Type Duration Reason I =

Hours

=

Method

=

l Cause and Corrective Actions and

- Comments

SUMMARY

Unit operated normally at full power for the entire month.

C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event I Actuation None Data From: Production Data Bank and Operator Logs

Docket No: 50-457 '

Unit: Braidwood 2 Date: 03/0312005 Completed by Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period: February 2005 A. OPERATING DATA REPORT Design Electrical Rating (MWe Net) 1155 Maximum Dependable Capacit (MWe Net) 1131 Month Year To Date Cumulative Hours Reactor Critical (Hours) 672.0 1,416.0 128,617.4 Hours Generator on Line (Hours) 672.0 1,416.0 127,957.9 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 789,933 1,662,245 139,002,025 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours . Comments None

SUMMARY

Unit operated normally at full power for the entire month.

C. SAFETY I RELIEF VALVE OPERATIONS f Date Valves Actuated No. &Type Plant Condition Description of Event l I Actuation I I None I I I Data From: Production Data Bank and Operator Logs