ML033290359

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Braidwood Station, Units 1 and 2
ML033290359
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/12/2003
From: Joyce T
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW030090
Download: ML033290359 (4)


Text

Exekltn.

Exelon Generation Company, LLC www.exeloncorp.com Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 November 12, 2003 BW030090 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of October 1, 2003 through October 31, 2003.

If you have any questions regarding this letter, please contact Ms. Kelly Root, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, T. P. Joyc/

Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station

  • f S~~~~V

ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457

Docket No: 50-456 Unit: Braidwood 1 Date: 11/04/2003 Completed by. Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 1 Reporting Period: October 2003 A. OPERATING DATA REPORT IDesign Electrical Rating (MWe Net) 1187 Maximum Dependable Capadty (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 745.0 6,899.1 113,403.6 Hours Generator on Line (Hours) 745.0 6,888.0 112,430.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 913,309 8,318,408 121,415,828 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination. 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

The Unit performed normally at full load for the entire month.

C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event Actuation None I I Data From: Production Data Bank and Operator Logs

Docket No: 50-457 Unit: Braidwood 2 Date: 11/0412003 Completed by Don Hildebrant Telephone: (815)417-2173 Braidwood Unit 2 Reporting Period: October 2003 A. OPERATING DATA REPORT FDesign Electrical Rating (MWe Net) l 1155 lMaximumDependableCapacity(MWeNet) l 1154 l

. . Month Year To Date Cumulative Hours Reactor Critical (Hours) 745.0 . 7,296.0 117,351.6 Hours Generator on Line (Hours) 745.0 7,296.0 116,743.4 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 881,866 8,754,076 125.960,711 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination. 5 - Other (explain)

F - Administrative G - Operator Error (explain)

H - Other (explain)

No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None

SUMMARY

The Unit performed normally for the entire month. Due to fuel depletion, the Unit began a period of coastdown starting on 10/13/2003.

C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuatedl No. & Type Plant Condition Description of Event l None l l Actuation I Data From: Production Data Bank and Operator Logs