MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0517204222005-06-13013 June 2005 May 2005 Monthly Operating Report for Braidwood Station Units 1 & 2 ML0513902882005-05-13013 May 2005 April 2005 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0511201952005-04-15015 April 2005 March 2005 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0508105832005-03-14014 March 2005 February 2005 Monthly Operating Report for Braidwood, Units 1 & 2 ML0505405672005-02-14014 February 2005 January 2005 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0502601972005-01-14014 January 2005 December 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0435802392004-12-14014 December 2004 November 2004 Monthly Operating Report Braidwood Station Units 1 and 2 ML0432804062004-11-12012 November 2004 October 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0429903872004-10-14014 October 2004 September 2004 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0426600472004-09-13013 September 2004 August 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0423702802004-08-13013 August 2004 July 2004 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0420303442004-07-13013 July 2004 June 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0417406942004-06-11011 June 2004 May 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0414502852004-05-13013 May 2004 April 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0411203522004-04-13013 April 2004 March 2004 Monthly Operating Report for Braidwood, Units 1 & 2 ML0411703002004-03-12012 March 2004 February 2004 Monthly Operating Report for Braidwood, Units 1 and 2 ML0404905272004-02-12012 February 2004 January 2004 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0402107402004-01-13013 January 2004 December 2003 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0402107412004-01-13013 January 2004 December 2003 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0335702042003-12-15015 December 2003 November 2003 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0332903592003-11-12012 November 2003 October 2003 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0329405892003-10-10010 October 2003 September 2003 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0326709902003-09-12012 September 2003 August 2003 Monthly Operating Report for Braidwood, Units 1 & 2 ML0323302572003-08-14014 August 2003 July 2003 Monthly Operating Report for Braidwood Station ML0321103932003-07-14014 July 2003 June 2003 Monthly Operating Report for Braidwood, Units 1 & 2 ML0317003802003-06-11011 June 2003 May 2003 Monthly Operating Report for Braidwood Station Units 1 & 2 ML0313507492003-05-0909 May 2003 April 2003 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0311301112003-04-11011 April 2003 March 2003 Monthly Operating Report for Braidwood Units 1 & 2 ML0307902852003-03-12012 March 2003 February 2003 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0305501252003-02-12012 February 2003 January 2003 Monthly Operating Report for Braidwood Units 1 & 2 ML0302703502003-01-14014 January 2003 December 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0236000342002-12-13013 December 2002 November 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0232602872002-11-14014 November 2002 October 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0229605412002-10-14014 October 2002 September 2002 Monthly Operating Report for Braidwood Station, Units 1 and 2 ML0226804842002-09-13013 September 2002 August 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0224802712002-08-12012 August 2002 July 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0220500632002-07-12012 July 2002 June 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0217000942002-06-12012 June 2002 May 2002 Monthly Operating Report for Braidwood Units 1 & 2 ML0215002292002-05-13013 May 2002 April 2002 Monthly Operating Report for Braidwood Station Units 1 and 2 ML0211903762002-04-12012 April 2002 March 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0208007562002-03-13013 March 2002 February 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0207106322002-02-12012 February 2002 January 2002 Monthly Operating Report for Braidwood Station, Units 1 & 2 ML0204300142002-01-11011 January 2002 December 2001 Monthly Operating Report for Braidwood Station, Units 1 & 2 2005-06-13
[Table view] |
Text
Exekn.M Exelon Generation Company, LLC www.exeloncorp.com Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 July 14, 2003 BW030056 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457
Subject:
Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Braidwood Station, Units 1 and 2. This report covers the period of June 1, 2003 through June 30, 2003.
If you have any questions regarding this letter, please contact Ms. Kelly Root, Regulatory Assurance Manager, at (815) 417-2800.
Respectfully, T.PJ e Plant Manager Braidwood Station Attachment DH/law cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station EA$
ATTACHMENT BRAIDWOOD STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 NRC DOCKET NOS. STN 50-456 AND STN 50-457
Docket No: 50-456 Unit: Braidwood 1 Date: 07/02/2003 Completed by: Don Hildebrant Telephone: (815)417-2173 Braldwood Unit 1 Reporting Period: June 2003 A. OPERATING DATA REPORT lDesign Electrical Rating (MWe Net) 1187 IMaximum Dependable Capacity (MWe Net) 1161 Month Year To Date Cumulative Hours Reactor Critical (Hours) 720.0 3,946.1 110,450.6 Hours Generator on Line (Hours) I 720.0 I 3,935.0 I 109,477.8 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 874,450 4,737,046 117,834,466 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain)
No Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments
SUMMARY
The Unit performed normally at full load for the entire month with a minor losses due to TVGV testing activities.
C. SAFETY / RELIEF VALVE OPERATIONS Date Valves Actuated No. & Type Plant Condition Description of Event e Actuation None I I Data From: Production Data Bank and Operator Logs
Docket No: 50-457 Unit: Braidwood 2 Date: 07/02/2003 Completed by. Don Hildebrant Telephone: (815)417-2173 Braldwood Unit 2 Reporting Period: June 2003 A. OPERATING DATA REPORT IDesian Electrical Rating (MWe Net) 1155
[Maximum Dependable Capacity (MWe Net) 1 1154 1 Month Year To Date Cumulative Hours Reactor Critical (Hours) 720.0 4,343.0 114,398.6 Hours Generator on Line (Hours) 720.0 4,343.0 113,790.4 Unit Reserve Shutdown (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 860,271 5,246,526 122,453,161 B. UNIT SHUTDOWNS TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training Ucensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain)
N Date Type Duration Reason Method Cause and Corrective Actions and Hours Comments None I
SUMMARY
The Unit performed normally at full load for the entire month with some minor load reductions required by Load Dispatch.
C. SAFETY I RELIEF VALVE OPERATIONS Date Valves Actuatedl No. & Type Plant Condition Description of Event I Actuation None l Data From: Production Data Bank and Operator Logs
I LS-AA4 17-1002 Nudai' March 30,2001 Page I of 1
~~~~- , ix ea TYPICAL LICENSING AND REGULATORY AFFAIRS CORRESPONDENCECONCURRENCE FORM Organizational review denotes reviewer concurrence of the information and commitments (if any) made In this document.
Correspondence Number (if applicable): & ) OS OOL Locationfrom which the Correspondencewill be submitted: B HL*t Book Subject notT4L oPe ¶-AJ6- bLPob- Fat Gwod x Prepared By: D. Ui^ t1.A-,)br Due Date: I1-.o
&I7-
Reference:
_ S. .
Oroanization Concurrence Due Date Print Name/Signature Date
[1I Operations Date:
[1 Maintenance _ Date:
[<I~Z~ Engineering Radiation Protection Date:
Date:
Li
[I Training Date:
Security . Date:
HO-
[I W -- f-Regulatory Services T-13 c4t t.f L pd.e.. Date: ' Z Independent Technical Review Date:
[I PORC Date:
[I Other Date:
Final Review and Anroval
[] Licensing/Regulatory Assurance - Q0-4 XA5- Date: ____ _
)1§ation Manager. i- Date:_
[] e.Vice President:_ Date:_ _
Comments:
,. ..