MONTHYEARAEP-NRC-2024-62, Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask2024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System ML24073A2342024-03-0606 March 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors IR 05000315/20230062024-02-28028 February 2024 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023006 and 05000316/2023006) AEP-NRC-2024-11, Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation2024-02-27027 February 2024 Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation ML24037A0522024-02-0707 February 2024 NRC Response to DC Cook Triennial Evaluated Force-on-Force Cycle Schedule Change Request AEP-NRC-2024-10, Form OAR-1, Owners Activity Report2024-02-0707 February 2024 Form OAR-1, Owners Activity Report IR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation 2024-08-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARAEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System ML24073A2342024-03-0606 March 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22055A0012022-06-0808 June 2022 Issuance of Amendment No. 341 Updating the Reactor Coolant System Pressure Temperature Limits AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2021-11-0808 November 2021 Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2021-28, 10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System2021-06-15015 June 2021 10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2021-24, Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation2021-03-23023 March 2021 Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation AEP-NRC-2020-72, License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-12-14014 December 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency ML20164A0452020-06-0808 June 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency ML20126G4552020-04-30030 April 2020 Application to Revise Technical Specifications to Adopt Tstf-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position AEP-NRC-2020-33, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues2020-04-30030 April 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues AEP-NRC-2020-01, License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System2020-04-0707 April 2020 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2020-09, Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable2020-04-0707 April 2020 Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable AEP-NRC-2020-14, License Amendment Requests and Exemption Requests Regarding Changes to the Routine Reporting Requirements Subject to Plant Technical Specifications and 10 CFR 50.71(e)2020-04-0707 April 2020 License Amendment Requests and Exemption Requests Regarding Changes to the Routine Reporting Requirements Subject to Plant Technical Specifications and 10 CFR 50.71(e) AEP-NRC-2019-33, Application to Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with TSTF-4212019-08-27027 August 2019 Application to Revise Technical Specification 5.5.5, Reactor Coolant Pump Flywheel Inspection Program, in Accordance with TSTF-421 ML19134A3552019-07-11011 July 2019 Issuance of Amendments Technical Specification Task Force (TSTF) Traveler 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program AEP-NRC-2019-18, License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor Bank2019-06-27027 June 2019 License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor Bank AEP-NRC-2019-05, License Amendment Request to Address Issues Identified in Westinghouse Document NSAL-15-12019-02-26026 February 2019 License Amendment Request to Address Issues Identified in Westinghouse Document NSAL-15-1 AEP-NRC-2019-01, Application to Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2019-02-26026 February 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. AEP-NRC-2018-72, Donald C. Cook. Nuclear Plant, Units 1 and 2 - License Amendment Request to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environmental Protection Plan2018-12-11011 December 2018 Donald C. Cook. Nuclear Plant, Units 1 and 2 - License Amendment Request to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environmental Protection Plan AEP-NRC-2018-10, Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements2018-06-11011 June 2018 Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements AEP-NRC-2018-02, Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping2018-03-0707 March 2018 Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping AEP-NRC-2018-04, Supplement to License Amendment Request Regarding Revision to the Emergency Plan for Technical Support Center Relocation2018-01-19019 January 2018 Supplement to License Amendment Request Regarding Revision to the Emergency Plan for Technical Support Center Relocation ML18024A4472018-01-19019 January 2018 Enclosure 2 - Technical Support Center Loss of Coolant Accident Radiological Analysis ML17317A4712017-11-0707 November 2017 Evaluation of Proposed Change Regarding Revision to the Emergency Plan for Technical Support Center Relocation & Revised Pages to Emergency Plan AEP-NRC-2017-10, Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements2017-11-0707 November 2017 Request for Deviation from National Fire Protection Association (NFPA) 805 Requirements ML17146A0752017-05-23023 May 2017 Donald C. Cook, Unit 1 and 2, License Amendment Request to Revise Emergency Action Levels ML17146A0762017-05-23023 May 2017 Evaluation of License Amendment Request to Revise Emergency Action Levels AEP-NRC-2017-04, License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves.2017-03-24024 March 2017 License Amendment Request to Revise Technical Specifications Section 3.7.2, Steam Generator Stop Valves. AEP-NRC-2016-65, License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations2016-12-14014 December 2016 License Amendment Request Regarding Technical Specification 3.9.3, Containment Penetrations AEP-NRC-2016-93, DC Cook Nuclear Plant, Units 1 & 2, Supplement to License Amendment Request to Revise the Cyber Security Plan Implementation Schedule2016-10-28028 October 2016 DC Cook Nuclear Plant, Units 1 & 2, Supplement to License Amendment Request to Revise the Cyber Security Plan Implementation Schedule AEP-NRC-2016-64, License Amendment Request Regarding Containment Leakage Rate Testing Program2016-10-18018 October 2016 License Amendment Request Regarding Containment Leakage Rate Testing Program AEP-NRC-2016-83, Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2016-10-11011 October 2016 Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2016-78, Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and ..2016-09-15015 September 2016 Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and .. AEP-NRC-2016-19, License Amendment Request to Revise the Cyber Security Plan Implementation Schedule2016-03-14014 March 2016 License Amendment Request to Revise the Cyber Security Plan Implementation Schedule AEP-NRC-2016-07, License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force-523, Generic Letter 2008-01, Managing Gas Accumulation.2016-01-29029 January 2016 License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force-523, Generic Letter 2008-01, Managing Gas Accumulation. ML15328A4522015-11-19019 November 2015 Enclosures 6 - 11: CNP Units 1 & 2 TS Bases, TSTF-425 Versus CNP TS Cross-Reference, Proposed No Significance Hazards Consideration, Proposed Inserts and Regulatory Commitments ML15328A4512015-11-19019 November 2015 Enclosures 1 - 5: Affirmation, Description of Proposed Changes, Probabilistic Risk Assessment Technical Adequacy, and CNP Units 1 & 2 TS Pages Marked to Show Proposed Changes AEP-NRC-2015-46, License Amendment Request to Adopt TSTF-425-A, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 5B2015-11-19019 November 2015 License Amendment Request to Adopt TSTF-425-A, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 5B AEP-NRC-2015-85, License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2015-10-19019 October 2015 License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation AEP-NRC-2015-62, Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2015-06-29029 June 2015 Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation AEP-NRC-2015-49, Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator2015-05-28028 May 2015 Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator AEP-NRC-2014-70, License Amendment Request Regarding Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.152014-12-17017 December 2014 License Amendment Request Regarding Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 AEP-NRC-2014-65, License Amendment Request to Adopt TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification, and Implement Full-Scope Alternative Source Term2014-11-14014 November 2014 License Amendment Request to Adopt TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification, and Implement Full-Scope Alternative Source Term AEP-NRC-2014-24, License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits2014-04-0909 April 2014 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits AEP-NRC-2014-09, License Amendment Request to Revise Technical Specification Section 5.5.14, Containment Leakage Rate Testing Program2014-03-0707 March 2014 License Amendment Request to Revise Technical Specification Section 5.5.14, Containment Leakage Rate Testing Program AEP-NRC-2014-04, License Amendment Request to Revise the Cyber Security Implementation Schedule2014-01-10010 January 2014 License Amendment Request to Revise the Cyber Security Implementation Schedule AEP-NRC-2013-50, License Amendment Request Regarding Containment Divider Barrier Seal2013-11-0606 November 2013 License Amendment Request Regarding Containment Divider Barrier Seal AEP-NRC-2013-79, License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 52013-10-0808 October 2013 License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 5 AEP-NRC-2013-84, Emergency License Amendment Request Regarding Containment Distributed Ignition System2013-10-0707 October 2013 Emergency License Amendment Request Regarding Containment Distributed Ignition System 2024-04-03
[Table view] Category:Technical Specifications
MONTHYEARML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML21125A5762021-04-19019 April 2021 9 Technical Specification Bases, List of Effective Pages (Unit 2) ML21125A5482021-04-19019 April 2021 2 to Technical Specifications Bases, List of Effective Pages (Unit 1) ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues AEP-NRC-2020-78, License Amendment Request Regarding a Change to the Steam Generator (SG) Program to Allow for a One-Time Deferral of SG Inspections2020-12-14014 December 2020 License Amendment Request Regarding a Change to the Steam Generator (SG) Program to Allow for a One-Time Deferral of SG Inspections ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML14197A0972015-11-30030 November 2015 Issuance of Amendment Regarding Restoration of Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions ML15328A4512015-11-19019 November 2015 Enclosures 1 - 5: Affirmation, Description of Proposed Changes, Probabilistic Risk Assessment Technical Adequacy, and CNP Units 1 & 2 TS Pages Marked to Show Proposed Changes ML15187A0022015-07-10010 July 2015 Issuance of Amendment No. 328 (Exigent) Regarding Revision to Technical Specifications for Engineered Safety Feature Actuation System AEP-NRC-2015-62, Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2015-06-29029 June 2015 Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML15076A2262015-04-0606 April 2015 Issuance of Amendments Adoption of TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability, Revision 2 AEP-NRC-2015-05, Correction of Technical Specification Typographical Error2015-02-0202 February 2015 Correction of Technical Specification Typographical Error ML14282A1182014-11-20020 November 2014 Issuance of Amendments Regarding Containment Divider Barrier Seal AEP-NRC-2014-09, License Amendment Request to Revise Technical Specification Section 5.5.14, Containment Leakage Rate Testing Program2014-03-0707 March 2014 License Amendment Request to Revise Technical Specification Section 5.5.14, Containment Leakage Rate Testing Program ML13282A2142013-10-0909 October 2013 Issuance of Amendment Revision to Technical Specification 3.6.9, Distributed Ignition System (Dis) (Emergency Circumstances) AEP-NRC-2013-79, License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 52013-10-0808 October 2013 License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 5 ML11182A1782011-07-28028 July 2011 License Amendment, Issuance of Amendments Cyber Security Plan AEP-NRC-2009-71, Response to Request for Additional Information Regarding a License Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology2009-11-20020 November 2009 Response to Request for Additional Information Regarding a License Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology AEP-NRC-2009-23, License Amendment Request Regarding Large Break Loss-of-Coolant Accident Analysis Methodology2009-03-19019 March 2009 License Amendment Request Regarding Large Break Loss-of-Coolant Accident Analysis Methodology ML0903502102009-01-14014 January 2009 License Amendment Request to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environmental Protection Plan ML0826004692008-09-0404 September 2008 Supplement to Emergency Diesel Generator Maximum Steady State Frequency Amendment Request ML0815108932008-05-28028 May 2008 Correction of Amendment No. 304 for Unit 1 and 287 for Unit 2, (Tac Nos. MD6317 & MD6318) - Tech Specs ML0812302702008-04-28028 April 2008 Tech Spec Pages for Amendments 304 & 287 to Add a Surveillance Requirement for When Offsite Power Is Provided Via Backfeed Through the Main Transformer and a Unit Auxiliary Transformer ML0812302692008-04-28028 April 2008 Tech Spec Pages for Amendments 305 and 288 Regarding Maximum Ventilation System Filter Pressure Drop ML0806600672008-03-0505 March 2008 Tech Spec Page for Amendments 302 & 285 to Revise a Specification Inadvertently Omitted by Previous Amendments Power Range Neutron Flux High Negative Rate Trip Function ML0801106652008-01-11011 January 2008 Tech Spec Pages for Amendments 301 and 284 Regarding Operational Test of the Reactor Trip on Turbine Trip ML0800800492008-01-0404 January 2008 Technical Specifications, Correction of Amendment No. 282 Containment Sump Modifications Per Generic Letter 2004-02 ML0735204032007-12-17017 December 2007 Technical Specifications, Issuance of Amendment RTS and ESFAS Bypass Testing Capability ML0729501002007-10-18018 October 2007 Technical Specifications, Issuance of Amendments Containment Sump Modifications Per Generic Letter 2004-02 (TAC Nos. MD5901 & MD5902) ML0725306592007-09-19019 September 2007 Technical Specifications, Issuance of Amendment Replacement of Resistance - Temperature Detectors and Associated Piping ML0714200712007-05-11011 May 2007 Technical Specification Change of Conditional Surveillance Frequency ML0710100972007-04-0606 April 2007 Technical Specification Page Correction of Administrative Error in Amendment No. 298, Steam Generator Tube Integrity ML0708607652007-03-14014 March 2007 Corrections to Technical Specification Table of Contents ML0708101332007-03-14014 March 2007 D.C. Cook, Technical Specifications, Steam Generator Integrity ML0700305172006-12-26026 December 2006 Supplement to Application for Technical Specification (TS) Improvement Regarding Steam Generator Tube Integrity ML0628303132006-10-0606 October 2006 D.C. Cook, Tech Spec Pages for Amendment 296, Regarding Elimination of the Resistance Temperature Detector (RTD) Bypass Loop ML0624901142006-09-0101 September 2006 D.C. Cook, Technical Specification Pages Re AC Sources - Operating ML0618801572006-07-0505 July 2006 Technical Specifications Pages Regarding Leakage ML0616004492006-05-31031 May 2006 Application for Amendment to Revise Technical Specification Surveillance Requirement for Channel Calibration of Overtemperature Differential Temperature and Overpower Differential Temperature Reactor Protection System Functions ML0610805842006-04-21021 April 2006 Correction of Amendments Technical Specifications, Conversion to Improved Format ML0610404022006-04-13013 April 2006 Technical Specification - Issuance of Amendment Under Emergency Circumstances Regarding Diesel Generator Votage Limit Requirements ML0607603742006-03-0707 March 2006 Application for Amendment to Revise Technical Specification 5.5.2, Leakage Monitoring Program. ML0604400222006-02-10010 February 2006 Technical Specifications, Delete the Power Range Neutron Flux High Negative Rate Trip Function ML0601700302006-01-12012 January 2006 Tech Spec Pages for Amendments 292 and 274 Regarding Elimination of Requirements for Monthly Operating Reports and Occupational Radiation Exposure Reports ML0527303202005-09-30030 September 2005 Tech Spec Pages for Amendments 291 and 273 Safety Evaluation Regarding Allowed Outage Time Extension for the Emergency Diesel Generators 2024-07-25
[Table view] |
Text
Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIA NA MICHIGAN POWER March 27, 2003 AEP:NRC:3334 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Donald C. Cook Nuclear Plant Unit 2 Docket No. 50-316 License Amendment Request to Revise Low Pressurizer Pressure Safety Injection Setpoint Dear Sir or Madam Pursuant to 10 CFR 50.90, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant Unit 2, proposes to amend Appendix A, Technical Specifications (TS), of Facility Operating License DPR-74. I&M proposes to amend Unit 2 TS Table 3.3-4, item L.d, and the P-l l setpoint in the Engineered Safety Features Interlock Table. The proposed amendment would:
- Revise the low pressurizer pressure safety injection (SI) trip setpoint from its current value of greater than or equal to 1900 pounds per square inch gauge (psig), to greater than or equal to 1815 psig.
- Revise the low pressurizer pressure SI allowable value from greater than or equal to 1890 psig, to greater than or equal to 1805 psig.
- Revise the P-I 1 setpoint from its current value of greater than or equal to 2010 psig, to greater than or equal to 1915 psig.
- Make format changes to the affected TS pages that improve appearance but do not affect any requirements.
No pending amendment requests affect the TS pages that are submitted in this request. If any future submittals affect these TS pages, I&M will coordinate the changes to the pages with the Nuclear Regulatory Commission Project Manager to ensure proper TS page control when the associated license amendment requests are approved.
I&M requests approval of these amendments by September 30, 2003. Approval of these changes will alleviate an operator concern that an SI actuation is imminent following a reactor trip. Following recent Unit 2 reactor trips, the reactor coolant system (RCS) pressure has approached the low pressurizer pressure SI trip setpoint, the RCS temperature has continued to decrease, and the operators have Gil
U.S. Nuclear Regulatory Commission AEP:NRC:3334 Page 2 closed the main steam isolation valves (MSIVs) to stabilize the RCS temperature.
Subsequently, the Nuclear Regulatory Commission's Senior Resident Inspector at the Donald C. Cook Nuclear Plant (CNP) questioned whether the plant's operators were being unnecessarily challenged to take actions (the closing of the MSIVs) to avoid an SI actuation An evaluation of the recent Unit 2 reactor trips has concluded that the RCS pressure recovers after the initial decrease following a reactor trip, and no operator action is necessary to avoid a low pressurizer pressure SI actuation. However, because of the continued RCS temperature decrease, which is caused by the quantity of auxiliary feedwater flow (three pumps at maximum flow rate), the operators place priority on stabilizing the RCS temperature, and they close the MSIVs to reduce RCS cooling. Later, after auxiliary feedwater (AFW) flow has been reduced, the RCS temperature stabilizes.
Prior to 1997, the CNP Emergency Operating Procedures (EOPs) allowed the operators to immediately shut down the turbine driven auxiliary feedwater pump (TDAFP) if the motor driven auxiliary feedwater pumps (MDAFPs) were running.
This provision was modified to include the additional requirement to restore SG level above the auto start setpoint as committed to in the response to Inspection Report 50-315, 316/97004. This guidance was subsequently removed as part of the EOP Upgrade Project to restore the EOPs to the Westinghouse Emergency Response Guidelines that direct waiting to remove the TDAFP until the plant is stabilized. These changes in the EOPs together with a design change that provided a 3.5-second delay to the AFW flow retention circuit are believed to have exacerbated the operator's concern about RCS cooling. The combined effect of these changes is to increase the amount of time that the maximum AFW flow rate to the steam generators exists.
The continued cooling of the RCS following a reactor trip has been addressed by incorporating a step in the "Reactor Trip or Safety Injection" procedure to reduce the total feed flow to 450,000 pounds per hour if an SI is not required. The proposed changes to the TS address the concerns associated with the pressure decrease that occurs immediately following the reactor trip.
Presently, following a reactor trip, there is a rapid decrease in pressurizer pressure that comes within 20 to 40 pounds per square inch of the present low pressurizer pressure SI trip setpoint. The operators must monitor this transient, and determine if an SI actuation is required. Historical Unit 2 reactor trips have shown that the pressure decrease is a short duration event, and that the pressure returns to its initial value. Thus, no condition exists that would require an SI actuation. Lowering the low pressurizer pressure SI trip setpoint will provide a
U.S. Nuclear Regulatory Commission AEP:NRC:3334 Page 3 larger margin between the setpoint and the resultant pressure response following a unit trip. Additionally, the proposed changes will align the Unit 2 values with the Unit 1 values. I&M considers the early approval of these changes to be important as it will reduce the challenges now confronting the operators. Once approved, I&M requests a 45-day implementation period.
This letter contains no new commitments. Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs at (269) 697-5806.
Sincerely, J. E. Pollock Site Vice President RV/rdw
Enclosures:
- 1. Affirmation
- 2. Application for Amendment, License Amendment Request to Revise Low Pressurizer Pressure Safety Injection Setpoint Attachments-
- 1. Technical Specification Pages Marked to Show Proposed Changes
- 2. Proposed Technical Specification Pages c: H. K Chernoff, NRC Washington, DC K. D. Curry, Ft Wayne AEP, w/o enclosures/attachments J. E. Dyer, NRC Region III J. T. King, MPSC, w/o enclosures/attachments MDEQ - DW & RPD, w/o enclosures/attachments NRC Resident Inspector J F. Stang, Jr., NRC Washington, DC
U.S. Nuclear Regulatory Commission AEP.NRC:3334 Page 4 bc: D. C. Baker A. C. Bakken III, w/o enclosures/attachments G. E. Carlson M. J. Finissi J. B. Giessner D. W. Jenkins, w/o enclosures/attachments J. A. Kobyra, w/o enclosures/attachments R. J. Kohrt J. G. Kovarik B. A. McIntyre, w/o enclosures/attachments J. E. Newmiller K. J. O'Connor J. E. Pollock, w/o enclosures/attachments D. J. Poupard M. K. Scarpello, w/o enclosures/attachments W. A. Wagner T. K. Woods, w/o enclosures/attachments
Enclosure 1 to AEP:NRC:3334 AFFIRMATION I, J. E. Pollock, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company J. E. Pollock Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME JUUE E. NEWMILLER Notary Public, Berrien County, Ml my Commission Expires Aug 22,2004
- N- .- --,.
- - '-7
- -A. -
-- ---- S - N N
-S. ',' --
.5,'.
Enclosure 2 to AEP:NRC:3334 Application for Amendment License Amendment Request to Revise Low Pressurizer Pressure Safety Injection Setpoint DESCRIPTION Pursuant to 10 CFR 50.90, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 2, proposes to amend Appendix A, Technical Specifications (TS), of Facility Operating License DPR-74. I&M proposes to amend Unit 2 TS Table 3.3-4, item L.d, and the P-11 setpoint in the Engineered Safety Features Interlock Table.
PROPOSED CHANGE I&M proposes to amend Unit 2 Table 3.3-4 and the P-il setpoint in the Engineered Safety Features Interlock Table as follows:
- Revise the low pressurizer pressure safety injection (SI) trip setpoint from its current value of greater than or equal to 1900 pounds per square inch gauge (psig), to greater than or equal to 1815 psig.
- Revise the low pressurizer pressure SI allowable value from greater than or equal to 1890 psig, to greater than or equal to 1805 psig.
- Revise the P-1lsetpoint from its current value of greater than or equal to 2010 psig, to greater than or equal to 1915 psig.
- Make format changes to the affected TS pages that improve appearance but do not affect any requirements.
BACKGROUND The low pressurizer pressure instrumentation provides one of several signals that are used to initiate an SI, turbine trip, feedwater isolation, and auxiliary feedwater flow. A low-pressure condition in the reactor coolant system from a loss-of-coolant accident (LOCA), a main steam system depressurization event, or a feedwater line break, will initiate an SI signal when two out of three pressurizer pressure sensors register a low-pressure condition. Following the initiation of the SI signal, cooling water will be delivered to the reactor coolant system (RCS) and the steam generators to maintain the reactor core in a safe condition. The P-1 1 interlock prevents the manual blocking of the SI function on a low pressurizer pressure SI trip signal when the Unit 2 pressurizer pressure is above 2010 psig.
Following recent Unit 2 reactor trips, the reactor coolant system (RCS) pressure has approached the low pressurizer pressure SI trip setpoint, the RCS temperature has continued to decrease, and the operators have closed the main steam isolation valves (MSIVs) to stabilize the RCS temperature. Subsequently, the Nuclear Regulatory Commission's Senior Resident Inspector at the Donald C. Cook Nuclear Plant (CNP) questioned whether the plant's operators were being unnecessarily challenged to take actions (the closing of the MSIVs) to avoid an SI actuation.
to AEP:NRC:3334 Page 2 An evaluation of the recent Unit 2 reactor trips has concluded that the RCS pressure recovers after the initial decrease following a reactor trip, and no operator action is necessary to avoid a low pressurizer pressure SI actuation. However, because of the continued RCS temperature decrease, which is caused by the quantity of auxiliary feedwater flow (three pumps at maximum flow rate),
the operators place priority on stabilizing the RCS temperature, and they close the MSIVs to reduce RCS cooling. Later, after auxiliary feedwater (AFW) flow has been reduced, the RCS temperature stabilizes.
Prior to 1997, the CNP Emergency Operating Procedures (EOPs) allowed the operators to immediately shut down the turbine driven auxiliary feedwater pump (TDAFP) if the motor driven auxiliary feedwater pumps (MDAFPs) were running. This provision was modified to include the additional requirement to restore SG level above the auto start setpoint as committed to in the response to Inspection Report 50-315, 316/97004. This guidance was subsequently removed as part of the EOP Upgrade Project to restore EOPs to the Westinghouse Emergency Response Guidelines that direct waiting to remove the TDAFP until the plant is stabilized. Additionally, this guidance requires that the steam generator levels be restored to a level that is above the AFW actuation setpoint. These changes in the EOPs together with a design change that provided a 3.5-second delay to the AFW flow retention circuit are believed to have exacerbated the operator's concern about RCS cooling. The combined effect of these changes is to increase the amount of time that the maximum AFW flow rate to the steam generators exists.
The continued cooling of the RCS following a reactor trip has been addressed by incorporating a step in the "Reactor Trip or Safety Injection" procedure to reduce the total feed flow to 450,000 pounds per hour if an SI is not required. The proposed changes to the TS address the concerns associated with the pressure decrease that occurs immediately following the reactor trip.
The Unit 2 low pressurizer pressure SI trip setpoint has been set at 1900 psig since Unit 2 was initially licensed. During reactor trips, the RCS hot leg cools, the RCS volume contracts, the pressurizer experiences a coolant outflow, and the RCS pressure rapidly decreases. Historical data demonstrate that this pressure reduction is approximately 300 to 320 pounds per square inch (psi). A pressure decrease of this magnitude results in the pressurizer pressure reaching a value of approximately 1920 to 1940 psig, which is only 20 to 40 psi above the current low pressurizer pressure SI trip setpoint. This situation unnecessarily challenges the operators in that they must determine whether an SI actuation is imminent or required.
The present P-ll interlock setpoint value of greater than or equal to 2010 psig was implemented June 21, 1979 to provide operating margin relative to the low pressurizer pressure SI trip setpoint of greater than or equal to 1900 psig.
to AEP:NRC:3334 Page 3 TECHNICAL ANALYSIS There are three licensing basis accident analyses that take credit for SI actuation on low pressurizer pressure: LOCA, feedwater line break, and accidental depressurization of the main steam system (caused by steam dump, relief valve, or safety valve failure). Steamline break mass and energy releases outside of containment, which are used for equipment environmental qualification evaluations, have also been evaluated taking credit for low pressurizer pressure SI actuation. These events have been analyzed using a low pressurizer pressure SI trip setpoint of 1700 psig (Reference 1), and uncertainties have been included in the setpoint value determinations. The uncertainties and the methodology for setpoint determination were previously accepted by the Nuclear Regulatory Commission (NRC) in Reference 2 and have not changed. Thus, revising the low pressurizer pressure trip setpoint from 1900 psig to 1815 psig and the allowable value from 1890 psig to 1805 psig does not adversely impact any analytical results The proposed change makes the Unit 2 low pressurizer pressure SI trip setpoint consistent with the Unit I low pressurizer pressure SI trip setpoint.
The P-11 interlock allows the low pressurizer pressure SI trip function to be blocked when the pressurizer pressure is below the P-1 I value. The SI trip function would typically be blocked during a normal cooldown, thereby preventing an inadvertent SI initiation while the RCS is being depressurized as part of the cooldown procedure. The change in the P-i1 setpoint value from 2010 psig to 1915 psig has no impact on any safety analysis. The proposed value maintains a margin between the low pressurizer pressure SI trip setpoint and the P- 1 setpoint, and makes the P-I1 setpoint consistent with the Unit 1 value.
REGULATORY SAFETY ANALYSIS No Significant Hazards Consideration I&M has evaluated whether or not a significant hazards consideration is involved with the proposed amendments by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or the consequences of an accident previously evaluated?
Response: No.
I&M proposes changing the low pressurizer pressure SI trip setpoint, the low pressurizer pressure SI allowable value, the P-I1 setpoint, and the format of the associated pages.
Neither the change to the low pressurizer pressure SI trip setpoint value and the SI allowable value nor the change to the P-i1 setpoint value alter any safety-related components or the means of accomplishing a safety-related function. The change in the values is supported by analyses that demonstrate that applicable acceptance criteria are met when SI is initiated at to AEP:NRC:3334 Page 4 1700 psig for a LOCA, a main steam system depressurization event, and a feedwater line break. Because the acceptance criteria are met, there is no significant increase in the consequences of an accident. The format changes are intended to improve readability and appearance, and do not alter any requirements. Thus, neither the probability of an accident nor the consequences of an accident are significantly increased.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
I&M proposes changing the low pressurizer pressure SI trip setpoint, the low pressurizer pressure SI allowable value, the P-11 setpoint, and the format of the associated pages.
Neither the change to the low pressurizer pressure SI trip setpoint value and the SI allowable value nor the change to the P-1 setpoint value involve changing the design function of any component, and a change in any of the values cannot initiate an accident. The format changes are intended to improve readability and appearance, and do not alter any requirements. Thus, no new accident initiators are introduced, and the possibility of a new or different kind of accident is not created.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
I&M proposes changing the low pressurizer pressure SI trip setpoint, the low pressurizer pressure SI allowable value, the P-11 setpoint, and the format of the associate pages. The low pressurizer pressure instrument is credited for activating the engineered safety features in the event of a LOCA, a main steam system depressurization event, or a feedwater line break.
The low pressurizer pressure SI trip setpoint value and the low pressurizer pressure SI allowable value have been selected to insure that the engineered safety features will be activated as assumed in the safety analysis. Present margins continue to be maintained because the applicable accident analyses criteria continue to be met. No margins of safety are associated with the P-i 1 setpoint value. The format changes are intended to improve readability and appearance, and do not alter any requirements. Thus, there is no significant reduction in a margin of safety.
to AEP:NRC:3334 Page 5 Applicable Regulatory Requirements/Criteria The CNP Updated Final Safety Analysis Report (UFSAR), Chapter 1 provides design criteria for CNP Unit 2. Design Criterion 15, "Engineered Safety Features Protection Systems" requires that "protection systems shall be provided for sensing accident situations and initiating the operation of necessary engineered safety features."
UFSAR Chapter 7.5.2 describes the engineered safety features actuation system, and UFSAR Tables 7.2-1 and 7.2-2 describe the P-1I1 setpoint Unit 2 UFSAR Chapter 14.2.5 discusses the steamline break analyses.
Unit 2 UFSAR Chapter 14.2.8 discusses the main feedwater line break.
Unit 2 UFSAR Chapter 14.3.1 and 14.3.2 discuss LOCA analyses.
Unit 2 UFSAR Chapter 14.4.11.3 discusses high energy line breaks outside of containment.
Unit 1 UFSAR Chapter 14.3.4.4 discusses secondary system pipe rupture mass and energy releases inside containment for Unit 1 and Unit 2.
The proposed changes do not adversely impact these evaluations.
ENVIRONMENTAL CONSIDERATION A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
REFERENCE
- 1. Letter from E. E. Fitzpatrick, I&M, to the Nuclear Regulatory Commission Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, License Nos. DPR-58 and DPR-74, Proposed License and Technical Specification Changes Supported by Analyses to Increase Unit 2 Rated Thermal Power and Certain Proposed Changes for Unit 1 Supported by Related Analyses," submittal AEP:NRC: 1223, dated July 11, 1996 to AEP.NRC:3334 Page 6
- 2. Letter from J. B. Hickman, NRC, to E. E. Fitzpatrick, I&M, Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Revised Safety Evaluation for Amendment Nos. 175 and 160 RE:
Reactor Protection System Upgrade Project (TAC Nos. M84839 and M84840)," dated May 13, 1994
Attachment 1 to AEP:NRC:3334 TECHNICAL SPECIFICATIONS PAGES MARKED TO SHOW PROPOSED CHANGES REVISED PAGES UNIT 2 3/4 3-22a 3/4 3-23
J OMITING CONDONSFOR OPERATION AD S ELANCE REQUIREMENTS 314.3 INSTRUMENTATION . I ENGINEERED SAFETY FEATURES INTERLOCKS DESIGNATION CONDITION AND SETPOINT FUNCTION P-li With 2 of 3 pressurizer pressure P-1I prevents or defeats manual block of channels greater than or equal to 2X safety injection actuation on low pressurizer 1 5 psig. pressure.
P-12 With 2 of 4 Tavg channels less than or P-12 allows the manual block of safety equal to Setpoint. injection actuation on low steam line pressure. Causes steam line isolation on high Setpoint greater than or equal to 54loF steam flow. Affects steam dump blocks.
With 3 of 4 T,, channels above the reset point, prevents or defeats the manual block of safety injection actuation on low steam line pressure.
I., Page,3/4 3-22a, ,_, -7 7 COOK NUCLEAR PLANT-UNIT 2 137
314 X LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 314.3 INSTRUMENTATION TABLE 3.34 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINTS ALLOWABLE VALUES
- 1. SAFETY INJECTION, TURBINE TRIP, FEEDWATER ISOLATION, AND MOTOR DRIVEN AUXILIARY FEEDWATER PUMPS
- a. Manual Initiation -- -----------See Functional Unit 9 -----------------
- b. Automatic Actuation Not Applicable Not Applicable Logic
- c. Containment Pressure -- Less than or equal to 1.1 psig Less than or equal to 1.2 psig High
- d. Pressurizer Pressure -- Greater than or equal to 40i81t 5 Greater than or equal to 4.80O Low psig psig
- e. Differential Pressure Less than or equal to 100 psi Less than or equal to 112 psi Between Steam Lines --
High
- f. Steam Line Pressure -- Greater than or equal to 600 psig Greater than or equal to 585 psig Low steam line pressure steam lme pressure COOK NUCLEAR PLANT-UNI2 Page 3/43-23 AMENDMENT , 44 2, 44, 137
Attachment 2 to AEP:NRC:3334 PROPOSED TECHNICAL SPECIFICATIONS PAGES REVISED PAGES UNIT 2 3/4 3-22a 3/4 3-23
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION I ENGINEERED SAFETY FEATURES INTERLOCKS DESIGNATION CONDITION AND SETPOINT FUNCTION P-11 With 2 of 3 pressurizer pressure P-1 I prevents or defeats manual block of channels greater than or equal to 1915 safety injection actuation on low pressurizer I psig. pressure.
P-12 With 2 of 4 T.vg channels less than or P-12 allows the manual block of safety equal to Setpoint. injection actuation on low steam line pressure. Causes steam line isolation on high Setpoint greater than or equal to 541oF steam flow. Affects steam dump blocks.
With 3 of 4 Tvg channels above the reset point, prevents or defeats the manual block of safety injection actuation on low steam line pressure.
COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-22a AMENDMENT i,
314 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 3.3-4 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINTS ALLOWABLE VALUES
- 1. SAFETY INJECTION, TURBINE TRIP, FEEDWATER ISOLATION, AND MOTOR DRIVEN AUXILIARY FEEDWATER PUMPS
- a. Manual Initiation -------------------- See Functional Unit 9 -------- -
- b. Automatic Actuation Not Applicable Not Applicable Logic
- c. Containment Pressure -- Less than or equal to 1.1 psig Less than or equal to 1.2 psig High
- d. Pressurizer Pressure -- Greater than or equal to 1815 psig Greater than or equal to 1805 psig Low
- e. Differential Pressure Less than or equal to 100 psi Less than or equal to 112 psi Between Steam Lines --
High
- f. Steam Line Pressure -- Greater than or equal to 600 psig Greater than or equal to 585 psig Low steam line pressure steam line pressure COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-23 AMENDMENT 4, X, -28, 34,43a,