ML081510893

From kanterella
Jump to navigation Jump to search

Correction of Amendment No. 304 for Unit 1 and 287 for Unit 2, (Tac Nos. MD6317 & MD6318) - Tech Specs
ML081510893
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/28/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To: Rencheck M
Indiana Michigan Power Co
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML081510059 List:
References
TAC MD6317, TAC MD6318
Download: ML081510893 (2)


Text

AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 NOTE -------------------------------

The following SRs are not required to be performed:

SR 3.8..3, SR 3.8.1.10 through SR 3.8.1.12, SR 3.8.1.15 through SR 3.8.1.17, and SR 3.8.1.18.

For AC sources required to be OPERABLE, the SRs of Specification 3.8.1, "AC Sources -- Operating,"

except SR 3.8.1.9, SR 3.8.1.13, SR 3.8.1.14 (ESF actuation signal portion only), SR 3.8.1.19, SR 3.8.1.20, SR 3.8.1.21, and SR 3.8.1.22, are applicable.

In accordance with applicable SRs.

SR 3.8.2.2 One of the following SRs is applicable when the electrical distribution subsystem is being supplied by "backfeed" from an offsite source via the main transformer and a unit auxiliary transformer:

a.

SR 3.8.1.9.a when the preferred offsite circuit is required to be OPERABLE by LCO 3.8.2.a, or

b.

SR 3.8.1.9.b when the alternate offsite circuit is required to be OPERABLE by LCO 3.8.2.a.

In accordance with applicable SR Cook Nuclear Plant Unit 1 3.8.2-3 Amendment No. £87, 304 Corrected by letter of 5/28/08

AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY i

SR 3.8.2.1


NOTE----------------

The following SRs are not required to be performed:

SR 3.8.1.3, SR 3.8.1.10 through SR 3.8.1.12, SR 3.8.1.15 through SR 3.8.1.17, and SR 3.8.1.18.

For AC sources required to be OPERABLE, the SRs of Specification 3.8.1, "AC Sources -- Operating,"

except SR 3.8.1.9, SR 3.8.1.13, SR 3.8.1.14 (ESF actuation signal portion only), SR 3.8.1.19, SR 3.8.1.20, SR 3.8.1.21, and SR 3.8.1.22, are applicable.

In accordance with applicable SRs i

SR 3.8.2.2 One of the following SRs is applicable when the electrical distribution subsystem is being supplied by "backfeed" from an offsite source via the main transformer and a unit auxiliary transformer:

a.

SR 3.8.1.9.a when the preferred offsite circuit is required to be OPERABLE by LCO 3.8.2.a, or

b.

SR 3.8.1.9.b when the alternate offsite circuit is required to be OPERABLE by LCO 3.8.2.a.

In accordance with applicable SR Cook Nuclear Plant Unit 2 3.8.2-3 Amendment No. -69, 287 Corrected by letter of 5/28/08