AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.1.11
NOTES
- 1.
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the unit is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
- 2.
If performed with DG synchronized with offsite power, it shall be performed at a power factor 50.86. However, if grid conditions do not permit, the power factor limit Is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable.
Verify each DG does not trip and voltage is 24 months maintained *5350 V during and following a load rejection of >3150 kW and *3500 kW.
I Cook Nuclear Plant Unit 2 3.8.1-10 Amendment No. 2I&9, 23, 276