Technical Specification - Issuance of Amendment Under Emergency Circumstances Regarding Diesel Generator Votage Limit Requirements
ML061040402
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/13/2006
From: Feintuch K
NRC/NRR/ADRO/DORL/LPLE
To: Nazar M
Indiana Michigan Power Co
Feintuch K. NRR/DORL (301) 415-3079
Shared Package
ML061040176 List:
References
TAC MD1131
Download: ML061040402 (1)


Text

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.11


NOTES

1.

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the unit is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

2.

If performed with DG synchronized with offsite power, it shall be performed at a power factor 50.86. However, if grid conditions do not permit, the power factor limit Is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable.

Verify each DG does not trip and voltage is 24 months maintained *5350 V during and following a load rejection of >3150 kW and *3500 kW.