ML080080049
| ML080080049 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/04/2008 |
| From: | Tam P NRC/NRR/ADRO/DORL/LPLIII-1 |
| To: | |
| tam P, NRR/ADRO/DORL, 415-1451 | |
| Shared Package | |
| ML080080045 | List: |
| References | |
| TAC MD5902 | |
| Download: ML080080049 (1) | |
Text
Containment Recirculation Drains 3.6.14 3.6 CONTAINMENT SYSTEMS 3.6.14 Containment Recirculation Drains LCQ
.61 APPLICABILITY:
The ice condenser floor drains, two refueling canal drains, one drain in each Containment Air Recirculation/Hydrogen Skimmer System (CEQ) fan room, and the flood-up overflow wall flow paths shall be OPERABLE.
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ice'condenser floorý A. 1 Restore ice condenser floor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> drain inoperable,.
drain to OPERABLE status.
B. One required refueling B.1 Restore required refueling 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> canal drain inoperable.
canal drain to OPERABLE status.
C. One required CEQ fan C. 1 Restore required CEO fan 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> room drain inoperable, room drain to OPERABLE*
status.
D. One flood-up overflow D. 1 Restore flood-up overflow 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> waillflow path wail TIOW-path to inoperable.
OPERABLE status.
E. Required Action and E. 1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND E.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Cook Nuclear Plant Unit 2 361-mnmn o ~
8 3.6.14-1 Amendment No. 2-6.9, 282