ML080080049

From kanterella
Jump to navigation Jump to search

Technical Specifications, Correction of Amendment No. 282 Containment Sump Modifications Per Generic Letter 2004-02
ML080080049
Person / Time
Site: Cook 
Issue date: 01/04/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To:
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML080080045 List:
References
TAC MD5902
Download: ML080080049 (1)


Text

Containment Recirculation Drains 3.6.14 3.6 CONTAINMENT SYSTEMS 3.6.14 Containment Recirculation Drains LCQ

.61 APPLICABILITY:

The ice condenser floor drains, two refueling canal drains, one drain in each Containment Air Recirculation/Hydrogen Skimmer System (CEQ) fan room, and the flood-up overflow wall flow paths shall be OPERABLE.

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ice'condenser floorý A. 1 Restore ice condenser floor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> drain inoperable,.

drain to OPERABLE status.

B. One required refueling B.1 Restore required refueling 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> canal drain inoperable.

canal drain to OPERABLE status.

C. One required CEQ fan C. 1 Restore required CEO fan 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> room drain inoperable, room drain to OPERABLE*

status.

D. One flood-up overflow D. 1 Restore flood-up overflow 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> waillflow path wail TIOW-path to inoperable.

OPERABLE status.

E. Required Action and E. 1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND E.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Cook Nuclear Plant Unit 2 361-mnmn o ~

8 3.6.14-1 Amendment No. 2-6.9, 282