Technical Specifications, Issuance of Amendment Replacement of Resistance - Temperature Detectors and Associated Piping
ML072530659
Person / Time
Site: Cook  
Issue date: 09/19/2007
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML072530236 List:
References
TAC MD3462, TAC MD3463
Download: ML072530659 (1)


Text

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.11


NOTES

1.

For Function 4, not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER is below the P-10 interlock.

2.

For Function 5, not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after THERMAL POWER is below the P-6 interlock.

Perform COT.

184 days SR 3.3.1.12 Perform CHANNEL CALIBRATION.

184 days SR 3.3.1.13 Perform CHANNEL CALIBRATION.

24 months SR 3.3.1.14


NOTE Neutron detectors are, excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION.

24 months SR 3.3.1.15


NOTE Normalization of the AT is not required to be performed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after THERMAL POWER is

.Ž98% RTP.

Perform CHANNEL CALIBRATION.

24 months SR 3.3.1.16 Perform COT.

24 months SR 3.3.1.17 Perform TADOT.

24 months Cook Nuclear Plant Unit 2 3.3.1-9 Amendment No. 249,280