Letter Sequence Approval |
|---|
TAC:MD3462, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:MD3463, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
MONTHYEARML0701602752007-01-16016 January 2007 Draft RAI on 11/3/06 Application for Amendment Re. RTD Bypass Loop Project stage: Draft RAI ML0706605812007-03-0707 March 2007 D.C. Cook Additional Draft RAI on 11/3/06 Application for Amendment Re. RTD Bypass Loop Project stage: Draft RAI ML0708111662007-03-27027 March 2007 Request for Additional Information Re. Amendment for Thermowell-Mounted Temperature Detectors Project stage: RAI ML0713400602007-05-11011 May 2007 Supplemental Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors Project stage: Request ML0715105352007-06-14014 June 2007 Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Project stage: Other ML0719301482007-06-27027 June 2007 Letter Transmitting Response to Request for Additional Information Regarding Proposed Amendment Involving Thermowell Mounted Temperature Detectors (with Enclosures 1 & 2) Project stage: Response to RAI ML0725306592007-09-19019 September 2007 Technical Specifications, Issuance of Amendment Replacement of Resistance - Temperature Detectors and Associated Piping Project stage: Approval ML0721502252007-09-19019 September 2007 License Amendment, Issuance of Amendment Replacement of Resistance - Temperature Detectors and Associated Piping Project stage: Approval ML0725302582007-09-27027 September 2007 Partial Withdrawal of an Amendment Request Project stage: Withdrawal 2007-05-11
[Table View] |
Similar Documents at Cook |
|---|
|
Text
RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.11
NOTES
- 1.
For Function 4, not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER is below the P-10 interlock.
- 2.
For Function 5, not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after THERMAL POWER is below the P-6 interlock.
Perform COT.
184 days SR 3.3.1.12 Perform CHANNEL CALIBRATION.
184 days SR 3.3.1.13 Perform CHANNEL CALIBRATION.
24 months SR 3.3.1.14
NOTE Neutron detectors are, excluded from CHANNEL CALIBRATION.
Perform CHANNEL CALIBRATION.
24 months SR 3.3.1.15
NOTE Normalization of the AT is not required to be performed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after THERMAL POWER is
.Ž98% RTP.
Perform CHANNEL CALIBRATION.
24 months SR 3.3.1.16 Perform COT.
24 months SR 3.3.1.17 Perform TADOT.
24 months Cook Nuclear Plant Unit 2 3.3.1-9 Amendment No. 249,280